HomeMy WebLinkAbout2009 CON Industrial Coating & Restoration Services - Notice of Completion PD Deck WaterproofingPLEASE COM4'LETE THIS INFORMATION
RECORDING REQUESTED BY:
CITY CLERK OF NATIONAL CITY
1243 National City Blvd.
National City, CA 91950
AND WHEN RECORDED MAIL TO:
CITY CLERK OF NATIONAL CITY
1243 National City Blvd.
National City, CA 91950
DO # 009-054919
�111101111 �110 IIIII Ilill �1111 IIIII Il��� � 111 �1111 �11111101 IIII IIII
OCT 92, 2009 1:16 PM
OFFICIAL RECORDS
SAN DIEGO COUNTY RECORDER'S OFFICE
DAVID L. BUTLER, COUNTY RECORDER
FEES: 0 00
PAGES: 2
� IlIlU 111 UII 101 �1111 II10111II IIIII Il�lI IIIII III�l ll�lI 11101111110111
NOTICE OF COMPLETION: National City Police Department Parking Lot Deck
Waterproofing Project
(Please fill in document title(s) on this line)
THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION
(Additional recording fee applies)
r.
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO:
CITY OF NATIONAL CITY
1243 NATIONAL CITY BOULEVARD
NATIONAL CITY, CA 91950-4301
NOTICE OF COMPLETION
CALIFORNIA CIVIL CODE SECTION 3093
NOTICE IS HEREBY GIVEN of the completion on September 1, 2009, of:
National City Police Department Parking Lot Deck Waterproofing Project, Specification
No. 08-14
Work otimprovement or portion of wort of improvement under construction or alteration.
1200 National City Boulevard,
Street address
National City, CA 91950
City State Zip Code
The undersigned owns the following interest or estate in said property: °`'"‘-`‘'
Nature of the interest or estate of owner (mortgagor, lessee, ete.)
\t-1 FEE
Said work of improvement was performed on the property pursuant to a contract with
Industrial Coating and Restoration Services
Name of Original Contractor
The following work and material were supplied: Laborer Groups, Trucks, Ladders, Plastic
Liners. Tape, Waterproofing System Product, Mops, Concrete, Traffic Control Equipment,
Painters, etc.
General statement of kind of labor, services. equipment or materials
The names and addresses 50-owners are: N/A
Joint tenants, tenants in comm or o er owners
Dated: September 1, 2009.
Rol orrison, Mayor
City of National City, 1243 National City Blvd., National City, CA 9 1 950-4301
I, the undersigned, say: I have read the foregoing Notice of Completion, and know the contents
thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing
is true and correct.
Executed on Sep her 1, 2009, at National City, California.
Signature:
MORRISON. YOR
FINAL CONTRACT BALANCE CHANGE ORDER
DATE: September 1, 2009
PROJECT: National City Police Department Parking Lot Deck
Waterproofing Project, Specification No. 08-14
TO: Industrial Coating and Restoration Services
Mr. Mahmoud Merzi, President
2534 Oceanside Boulevard
Oceanside, CA 92054
ORIGINAL CONTRACT AMOUNT:
START DATE:
COMPLETION DATE:
ORIGINAL CONTRACT LENGTH:
EXTENTION OF WORK DAYS:
TOTAL CONTRACT TIME:
DESCRIPTION OF CHANGE:
S [02,501.25
December 1, 2008
December 29, 2008
20 working days
0 working days
20 working days
This change order is written to balance and finalize the amounts for said project.
No.
Item
Original Contract Adjusted Contract
Unit
Bid Qty Unit
Price
WATERPROOFING SYSTEVI
I.S 1 $88,000.00
Amount
Qty
Unit Price
Amount
$88.000.00
REMOVE. AND REPLACE
CAULKING
LF 1,125
I2.8v
14,501.25
2_715
5 88000 00
$88,000.00
$1289
$ 35,125.25
COO
WHEEL SLOPS
LS
Conlracl Total
5800.00
$800.00
102,501.25
8123.925.25
Page 1
FINAL CONTRACT BALANCE CHANGE ORDER
DISCUSSION:
Added line items:
Change Order Number One was added for a lump sum amount of $800.00. Work
included the removal and replacement of broken concrete wheel stops in the upper
outdoor parking lot.
An additional 1,600 lineal feet of removal and replacement of caulking at S12.89 per
lineal foot totaling $20,624.00 was added to the scope of work as a line item increase due
to deteriorated conditions discovered while work was in progress.
CONTRACT ADJUSTMENT:
As a result of this change order, the contract price is adjusted as follows:
1. The final contract price to date is adjusted to S123,925.25.
2. As a result of the satisfactory completion of said project, a retention and final
balance of S12,392.52 is sct for invoice processing and payment upon the receipt
of required signatures and City Council's ratification of this agreement and the
Notice of Completion.
This document and its purpose to balance payment shall be considered full compensation
for furnishing and installing the materials, labor, tools and equipment, profit, overhead,
and all incidentals for performing the work described above. Industrial Coating and
Restoration Services will not be entitled to damages or additional payment for delays as
described in the 1997 edition of the Standard Specifications for Public Works
Construction, Section 6-6.3, for performing the work as described above.
Page 2
FINAL CONTRACT BALANCE CHANCE ORDER
e
DATE
RECOMMENDED FOR APPROVAL BY:
B,
•ciates
ger (Consultant)
Kenneth Fernandez,44416"-DATE
CIVIL ENGINEERING TECHNICIAN
NATIONAL CITY PROJECT COORDINATOR
REVIEWED BY:
in Daneshfar, P.E.
PRINCIPAL CIVIL ENGINEER
aryay B. aaki, P.E.
CITY ENGINEER
ACCEPTED BY:
Industrial Coating and Restoration Services
CONTRACTOR
APP 'ED BY:
Ron Morrison
MAYOR
City of National City Resolution Number:
9 2-r/1
DATE
DATE
k.�- 26-
DATE
q-<?-o1
DATE
Page 3
RESOLUTION NO. 2009 - 213
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ACCEPTING THE WORK PERFORMED BY INDUSTRIAL COATING AND RESTORATION
SERVICES FOR THE TOTAL FINAL AMOUNT OF $123,925.25, AUTHORIZING THE MAYOR
TO SIGN THE FINAL BALANCE CHANGE ORDER, AND AUTHORIZING
THE FILING OF A NOTICE OF COMPLETION FOR THE NATIONAL CITY POLICE
DEPARTMENT PARKING LOT DECK WATERPROOFING PROJECT
BE IT RESOLVED by the City Council of the City of National City as follows:
It appearing to the satisfaction of the Engineering Department that all work
required to be done by Industrial Coating and Restoration Services, for the total final amount of
$123,925.25, for the National City Police Department Parking Lot Deck Waterproofing Project
has been completed, the City Council of National City hereby accepts said work, authorizes the
Mayor to sign the final balance change order, authorizes the filing of a Notice of Completion,
and orders that payment for said work by made in accordance with said contract.
PASSED and ADOPTED this 1st day of September, 2009.
4on orrison, Mayor
ATTEST:
U614jA)9
jtj
Mic ael R. Della, Ci y Clerk
APPROVED AS TO FORM:
J 07)�
George H. Eiser, III
City Attorney
Passed and adopted by the Council of the City of National City, California, on
September 1, 2009 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Parra, Sotelo-Solis, Van Deventer, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY:
RON MORRISON
Mayor of the City of National City, California
h
.A1/414
City C erk of the City of $dational City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2009-213 of the City of National City, California, passed and
adopted by the Council of said City on September 1, 2009.
City Clerk of the City of National City, California
By:
Deputy
City of National City, California
COUNCIL AGENDA STATEMENT
MEETING DATE September 1, 2009
AGENDA ITEM NO.
14
ITEM TITLE A Resolution of the City Council of the City of National City accepting the work performed
by Industrial Coating and Restoration Services with the final amount of $123,925.25 authorizing the mayor
to sign the final balance change order and authorizing the filing of the Notice of Completion with the County
Recorder for the National City Police Department Parking Lot Deck Waterproofing Project. (Funded through
General Funds)
PREPARED BY
DEPARTMENT EXT. 4388
Kenneth Fernandez
EXPLANATION Development Services/ Engineering
Please see attached page with explanation.
Environmental Review X N/A
MIS Approval
Financial Statement
Approved By
Finance Director 1
Funding is available through Account 001-409-500-598-1408 (Gener unds) per Resolution 2008-224.
Account No.
STAFF RECOMMENDATI
Adopt the Resolu 'on.
BOARD / OISSION'ME
N/A
ATTACHMENTS (Listed Below) Resolution No.
1. Resolution
2. Contract Final Balance
3. Notice of Completion
L
'A -
A-200 (Rev. 7/03)
SPEC 08-14 NOC
City of National City
Office of the City Clerk
1243 National City Boulevard, National City, CA 91950-4397
Michael R. Dalla, CMC - City Clerk
(619) 336-4228 Fax: (619) 336-4229
September 23, 2009
David Butler
Assessor / Recorder / County Clerk
County of San Diego
P.O. Box 121750
San Diego CA 92112-1750
Dear Mr. Butler:
We are submitting the following documents in duplicate for recording:
NOTICE OF COMPLETION: National City Police Department Parking
Lot Deck Waterproofing Project
Please note the recording information on the duplicate copy provided, and return
it to the Office of the City Clerk.
Sincerely,
g•A
Michael R. Dalla, CMC
City Clerk
Enclosure
® Recycled Paper