Loading...
HomeMy WebLinkAbout2009 CON Republic ITS - Notice of Completion Safe Routes to SchoolPLEASE COMPLETE THIS INFORMATION RECORDING REQUESTED BY: CITY CLERK OF NATIONAL CITY 1243 National City Blvd. National City, CA 91950 AND WHEN RECORDED MAIL TO: CITY CLERK OF NATIONAL CITY 1243 National City Blvd. National City, CA 91950 I IIIIIIII III IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII IIII OCT 15, 2009 3:14 PM OFFICIAL RECORDS SAN DIEGO COUNTY RECORDER'S OFFICE DAVID L SUTLER, COUNTY RECORDER FEES: 0.00 PAGES: 2 11111111111111101111111111111111111111111111111011111111111111111111111111 THIS SPACE FOR RECORDER'S USE ONLY NOTICE OF COMPLETION: National City Safe Routes to School 10032 (Please fill in document title(s) on this line) THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Additional recording fee applies) 10033 RECORDING REQUESTED BY WHEN RECORDED MAIL TO: NAME: CITY OF NATIONAL CITY ADDRESS: 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on October 6, 2009 of the National City Safe Routes to School, Spec. No. 06-05 Work of improvement or portion of work of improvement under construction or alteration. Various locations around 7 schools in National City, CA 91950 Street Address City State Zip Code The undersigned owns the following interest or estate in said property: o W T rcE N/A Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with REPUBLIC ITS Name of Original Contractor The following work and material were supplied: Pole -Mounted Flashing Beacons, In -Roadway Lighting Crosswalk Systems, Traffic Signing and Striping, Concrete Sidewalk, Pedestrian Ramps, Traffic Control Equipment, etc. General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: N/A Joint tenants, tenants in common, or other owners Dated: , 2009; Signature of Owner City of National City, 1243 National City Blvd., National City, CA 91950 I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on oci R G , 2009, at Nnc oN " c"Y , California. Signature: RON MORRISON, MAYOR N. 00-5 DATE: FINAL CONTRACT BALANCE October 6, 2009 PROJECT: National City Safe Routes to School Project (Specification No. 06-05) CONTRACTOR: Republic ITS ORIGINAL CONTRACT AMOUNT: FINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: $314,760.00 $442,984.50 (includes extended line items and City -initiated change orders) January 14, 2008 August 31, 2009 (includes downtime due to equipment shipment delays, City - initiated change orders and inspections) ORIGINAL CONTRACT TIME (WORKING DAYS): ADDITIONAL WORKING DAYS FOR CHANGE ORDERS: FINAL CONTRACT TIME (WORKING DAYS): SEE ATTACHED CONTRACT BALANCE SUMMARY DETAIL. 40 40 80 This document and its purpose to balance payment shall be considered full compensation for furnishing and installing materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work (see attached). Republic ITS will not be entitled to damages or additional payment for delays as described in the 1997 (and latest) edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing said work. REVIEWED BY: REVIEWED BY: B o ' a Date Manganiello .e r A ociates (Construction Manager) Traffi- Engineer Di Daneshfar, P.E. Principal Engineer ACCEPTED BY: to Martin Eichmann Date f' on Morrison City Engineer APPED BY: Republic ITS (Contractor) Mayor Date City Council Resolution No. 2061- 2.3 2 CONTRACT BALANCE SUMMARY DETAIL Original Contract Final Contract Balance No. Item Units Quantity Unit Price Amount Quantity Amount 1 Remove and Salvage exist. Conflict signs; furnish & install new signs. EA 56 $ 160.00 $ 8,960.00 64 $ 10,240.00 2 Furnish and Install solar -powered beacons (Carmanah R629C*) EA 10 $ 3,300.00 $ 33,000.00 10 $ 33,000.00 3 Furnish and install 24-hour solar -powered beacons (Carmanah R247C*) EA 2 $ 3,300.00 $ 6,600.00 2 $ 6,600.00 4 Furnish and install 18-unit solar -powered In -Roadway Lighting (IRL) Crosswalk System (Swarco Lanelight MLK150*) EA 1 $ 37,500.00 $ 37,500.00 1 $ 37,500.00 5 Furnish and install 18-unit solar -powered In -Roadway Lighting (IRL) Crosswalk System (Swarco Lanelight MLK150*) with 2 LED -enhanced School Warning Signs (Caltrans MUTCD Sign Code S1-1). EA 2 $ 44,000.00 $ 88,000.00 2 $ 88,000.00 6 Furnish and install 14-unit solar -powered In -Roadway Lighting (IRL) Crosswalk System (Swarco Lanelight MLK150*) with 2 LED -enhanced School Warning Signs (Catrans MUTCD Sign code 51-1). Ea 1 $ 40,000.00 $ 40,000.00 1 $ 40,000.00 7 Furnish and install 10-unit solar -powered In -Roadway Lighting (IRL) Crosswalk System (Swarco Lanelight MLK150*) with 2 LED -enhanced School Warning Signs (Caltrans MUTCD sign code S1-1). EA 1 $ 37,000.00 $ 37,000.00 1 $ 37,000.00 8 Remove existing conflicting striping and pavement markings via grinding/sandblasting. LS 1 $ 2,500.00 $ 2,500.00 3.53 $ 8,812.50 9a Install new thermoplastic pavement markings for standard school crosswalks SF 228 $ 3.00 $ 684.00 440 $ 1,320.00 9b Install new thermoplastic pavement markings for school crosswalks at In -Roadway Lighting System locations. SF 2,100 $ 3.00 $ 6,300.00 3,109 $ 9,327.00 9c Install new thermoplastic pavement markings for yield lines (Caltrans Standard Plans A24E). SF 242 $ 3.00 $ 726.00 308 $ 924.00 9d Install new thermoplastic pavement markings for all 'SLOW, 'SCHOOL' and 'XING' legends (Caltrans Standard Plans A24D). SF 158 $ 5.00 $ 790.00' -175 $ (875.00) 10 Furnish and install Type 9A Cantilever Flashing Beacon Pole and Mastarm Assembly (Caltrans Standard Plans ES-7K). EA 2 $ 7,000.00 $ 14,000.00 2 $ 14,000.00 11 Furnish and install Type Al Ped Ramp w/ Truncated Domes (SDSRD G-28) Ea 1 $ 3,900.00 $ 3,900.00 1 $ 3,900.00 12 Furnish and install Type B1 Ped Ramp w/ Truncated Does (SDSRD G-28) EA 2 $ 3,900.00 $ 7,800.00 2 $ 7,800.00 13 Furnish and install concrete sidewalk (450'X6') to match existing back of curb. SF 2,700 $ 10.00 $ 27,000.00 2,700 $ 27,000.00 City Council Approval - 11/20/07 (Resolution No. 2007-255) Subtotal (Original Contract) $ 314,760.00 Subtotal (Original Contract + Extended Line Items) $ 324,548.50 CO1 Install 340 SF of additional sidewalk (Newell St; 18th Street & F Avenue) LS City Engineer Approval - 4/1/08 1 $ 3,400.00 CO2 Furnish and install an additional in -roadway lighted crosswalk system, flashing beacons, signing and striping LS City Council Approval - 10/21/08 (Resolution No. 2008-222) 1 $ 113,716.00 CO3 Remove 12' sign poles; furnish and install 14' sign poles for flashing beacons LS City Engineer Approval-8/25/09 1 $ 1,320.00 Subtotal (Change Orders) $ 118,436.00 Total (Final Contract Balance) $ 442,984.50 RESOLUTION NO. 2009 — 232 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING THE WORK PERFORMED BY REPUBLIC ITS, INC., AUTHORIZING THE MAYOR TO EXECUTE THE FINAL CONTRACT BALANCE CHANGE ORDER WITH THE FINAL CONTRACT AMOUNT OF $442,984.50, AND AUTHORIZING THE FILING OF THE NOTICE OF COMPLETION WITH THE COUNTY RECORDER FOR THE NATIONAL CITY SAFE ROUTES TO SCHOOL PROJECT BE IT RESOLVED by the City Council of the City of National City as follows: It appearing to the satisfaction of the Engineering Department that all work required to be done by Republic ITS, Inc., for the National City Safe Routes to School Project has been completed, the City Council of National City hereby accepts said work, authorizes the Mayor to execute the final contract balance change order form with the final amount of $442,984.50, authorizes the filing of a Notice of Completion with the county recorder, and orders that payment for said work be made in accordance with said contract. PASSED and ADOPTED this 6th day of October, 2009. ATTEST: Miciiaei R. Da la, City Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney on Morrison, Mayor Passed and adopted by the Council of the City of National City, California, on October 6, 2009 by the following vote, to -wit: Ayes: Councilmembers Morrison, Parra, Sotelo-Solis, Van Deventer, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California City t✓lerk of the Cityf National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2009-232 of the City of National City, California, passed and adopted by the Council of said City on October 6, 2009. City Clerk of the City of National City, California By: Deputy City of National City, California COUNCIL AGENDA STATEMENT MEETING DATE October 6, 2009 AGENDA ITEM NO. 4 (ITEM TITLE Resolution of the City Council of the City of National City accepting the work performed by Republic ITS, Inc. with the final amount of $442,984.50, authorizing the Mayor to sign the Final Contract Balance and Notice of Completion, to be filed with the County Recorder, for the National City Safe Routes to School Project, Spec. No. 06-05 (Funded by State Safe Routes to School Grant and City General Fund). PREPARED BY Stephen Manganiello DEPARTMENT Engineering EXT. 4382 EXPLANATION See attached. Financial Statement Project was funded through Account #'s: 323-409-500-598-6166 (State Safe Routes to School Grant) = $417,936.42 001-409-500-598-6166 (City General Fund) = $25,048.08 Account No. STAFF RECOMME ION Adopt the resoluti BOARD / CO T 1 1O1J RECOMMEDATION N/A ATTACHMENTS (Listed Below) 1. Resolution 2. Contract Final Balance 3. Notice of Completion Approved By: Finance Director Resolution No. A-200 (Rev. 7/03) INCORPOnATEi October 14, 2009 Mr. David Butler Assessor / Recorder / County Clerk County of San Diego P.O. Box 121750 San Diego CA 92112-1750 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Della, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax Dear Mr. Butler: We are submitting the following documents in duplicate for recording: NOTICE OF COMPLETION: National City Safe Routes to School Please note the recording information on the duplicate copy provided, and return it to the Office of the City Clerk. Michael R. Dalla, CMC City Clerk Enclosures cc: Engineering Dept.