HomeMy WebLinkAbout2009 CON Koch Armstrong - Change Order #24 Street Resurfacing Project FY 08-09NOTE TO FILE
03-24-10
IN THE MATTER OF: Resolution of the City Council of the
City of National City ratifying Change Order No. 24 to the
contract with Koch -Armstrong General Engineering, Inc. in
the amount of $27,835 to add missing sidewalk and a
retaining wall on the north side of Sweetwater Road, east of
Prospect Street, within and as requested by the County of
San Diego for the National City Street Resurfacing Project,
FY 08-09 (Phase 2). Please note the following:
A FULLY EXECUTED ORIGINAL CHANGE ORDER WAS NEVER
FILED WITH THE OFFICE OF THE CITY CLERK
ORIGINATING DEPARTMENT: _ CDC Housing & Grants
City Attorney _ Human Resources
_ City Manager _ MIS
_ Community Svcs. _ Planning
X Engineering _ Police
Finance Public Works
Fire
NTF
City of National City
National City Streets Resurfacing Project
Specification #08-04
CHANGE ORDER #24
June 18, 2009
Contractor: KOCH-ARMSTRONG
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
See Attachment "A".
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and the
Contractor and represents the entire agreement for the work described herein and includes all costs associated
with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding,
overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the
original contract and all its referenced documents' terms and conditions.
Justification for Change in Contract
See Attachment "A".
Construction Contract Accounting Summary
Original Contract Amount
Net change by previously authorized Change Orders:
Contract amount prior to this Change Order: 5,631,632 31
Amount of this change order: 27,835.00
New contract amount: $ 5,659,467.31
5,327,000.00 r,
304,632.31
Original contract time (calendar days):
Previously approved additional working days:
Additional working days for this change order:
Total contract time (working days):
(see Weekly Statement of Contract Time for completion date)
Reviewed by:
rincipal Civil Engine r
Agreed to and Accepted by:
Koch- strong CDate
f'itsj Ji-.YtC
cc: Contractor, Construction File, Project Manager, City Clerk
90
45
10
145
Re oe r nd d for aps'vat by-
Proje 1anage
Reviewed by:
l
Eyfgineer Date
City of National City
National City Streets Resurfacing Project
Specification #08-04
ATTACHMENT "A" CO #24
DESCRIPTION:
This change in contract is to add missing sidewalk and a retaining wall on the north side of Sweetwater Road,
east of Prospect Street. The change in contract includes but is not limited to installation of 1,102 square feet of
sidealk and eighty-four (84) lineal feet of retaining wall and all work appurtenant thereto. This change in contract
is a lump sum. The breakdown below is for reference only to demonstrate how the lump sum price was arrived
at and includes all material, manpower, equipment, overhead, profit and any and all other costs associated with
this change in contract. There will be no additional costs to the City.
Detailed Schedule of Values
Mobilization
Traffic Control
Grading
Demolition
C-2 Wall
Sidewalk
Adjust signs and utility boxes
Unit Quantity Unit Price Total
LS 1.00 3,450.00 3,450.00
LS 1.00 3,900.00 3,900.00
LS 1.00 3,204.00 3,204.00
LS 1.00 2,808.00 2,808.00
LF 84.00 65.45 5,497.80
SF 1,102.00 7.60 8,375.20
EA 3.00 200.00 600.00
TOTAL :
27,835.00
JUSTIFICATION:
At the County of San Diego's request, the City of National City received funds to design, administer, manage,
and construct miscellaneous public improvements at the north side of Sweetwater Road, east of Prospect
Street. This change in contract adds the construciton of missing sidewalk and a retaining wall at the north side
of Sweetwater Road, east of Prospect in order to achieve compliance with ADA requirements.
This Work is necessary to properly address the completion of public improvements at this location and the
surrounding area and to provide ADA access at this section of Sweetwater road. The contractor, Koch -
Armstrong, is currently performing work of this type and character throughout the City of National City and is
therefore qualifed to competently perform this Work. This change in contract is necessary because the Work, as
described above, was not included in the original contract, but it is of the same type and character.
EXISTING CURB & GUTTER
KOCH-ARMSTRONG GENERAL ENGINEERING, INC_
P.O. BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317
LICENSE 194819-A
n
QUOTATION
09-08.4 COP #25
PAGE I OF 1 (REVISED. 5-16-06)
a NATIONAL CITY STREET RESURFACING FY 06-07 ATTN: BYRON WADE
1243 NATIONAL CITY BLVD. TEL. (619) 336-4380
NATIONAL CITY, CA, 91950 FAX (619) 336 439/
EMAIL byronwadel@mac.com
DATE: 6/30/2009
Ve propose to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated.
his quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted.
OB LOCATION
)ENTIFIED
ROAD IMPROVEMENTS.
SWEETWATER ROAD AT PROSPECT STREET (NORTHEAST CORNER).
"NATIONAL CITY STREET RESURFACING PROJECT_", CHANGE ORDER PROPOSAL #25.1- SWEETVVATER
ITEM
DESCRIPTION -
APPROX.
QUANTITY
UNIT
UNIT PRICE
TOTAL
1
MOBILIZE: LAYOUT WALL AND SIDEWALK, U.S.A. MARKOUT.
1
LS
2
EARTHWORK
1
LS
2.1
EXCAVATE, HAUL AND DISPOSE Of EXISTING SOIL AT NEW SIDEWALK.
1055
SF
2 2
GRADE SLOPE- MATCH SIDEWALK & TOP OF EXISTING SLOPE, HAUL & DISPOSE OF EXCESS SOIL.
15
LF
2.3
EXCAVATE SOIL AT C-9 WALLS, HAUL & DISPOSE OF.
84
I F
2.4
OVERCUT SOIL AT BACK OF WALLS TO ALLOW FOR FORMS & STOCKPILE SOII ONSITE.
84
LF
3
WALLS PER SDRSD C-9 TYPE A AND TYPE C (2' - 3' HIGH)
74
LF
3.1
SETUP FORMS
74
LF
3.2
PUMP CONCRETE WALLS
74
LF
3.3
STRIP FORMS, PATCI1 AS NEEDED AND BACKFILL WALL.
74
LI-
4
5.33'(W) SIDEWALK WITH 15LE TRANSITION INTO 10' (W) EXISTING RAMP PER SDRSD G-7.
1110
SF
4.1
DEMO EXISTING SIDEWALK AT EAST END
10.5
LF
42
ADJUST TO GRADE ONE, DOUBLE POST SIGN AND 3 EXIS TING PRECAST BOXES
4
EA
5
TRAFFIC CONTROL
1
LS
TOTAL
1
LS
27835.00
1
INCLUDES: ONE MOVE IN, NATURAL GRAY COLOR/ 2500 PSI, MEDIUM BROOM FINISHED CONCRETE, PREVAILING WAGES, BOND COST,
2
EXCLUDES: ADJUSTING UTILITIES, BASE UNDER CONCRETE, SAWCUTTING, B.M.P.'s, DOORKNOB NOTICES, SURVEYING/STAKING,
NIGHT/WEEKEND/HOLIDAY WORK DAYS, NEW PRECAST BOXES, SWPPI WPC PLANS, CAULKING/SEALANT, NEW TRAFFIC PLAN, REINFORCEMENT,
LANDSCAPING! IRRIGATION, STRIPING, BOLTS/ SLEEVES/ TEMPLATES/ EMBEDED IN CONCRETE,
ANY WORK/LABOR/ MATERIALS OR ITEM NOT SPECIFICALLY STATED IN QUOTE.
3
OWNER TO PROVIDE FREE DUMP SITE AT BAY MARINA AND FREEWAY 5.
:ONDITIONS.
Does nor include permits bonds. any form of engineering(staking. testing. inspection. etc.). base under concrete, redwood headers, striping, traffic control, or utility adjustment unless otherwise specified
Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent after 30 days, and they are subject to the maximum finance charge allowable by law
Work to be done n accordance with plans, specifications, and quantities identified above. Koch -Armstrong General Engineering. Inc. shall be notified or writing prior to any proposed changes.
Subgrade to be taken from rt- .10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering. Inc begins work unless otherwise specified.
Any unusual conditions of subsoil encountered. such as burred slabs. underground piping, trash deposits, etc. shall be deemed cause to additional charges.
Required California Preliminary Lien information (California Civil Code Section 3097/3008) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins.
Subject to Credit Approval and verification of California Preliminary Lien information.
Class 2 material it included is 3W' recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted.
\cceptance:
Please sign and return one copy this quotation constitutes the
sole and only agreement. Any prior agreements, negotiations.
etc , not set forth herein are of no force or effect
'inn: NA I tONAL CITY STREET RESURFACING FY 06-07
3y:
By:
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
6130/09
Date FRANK HERRERA
-
----
KOCH-ARMSTRONG GENERAL ENGINEERING,
INC.
t. -_,I ' ,-,P.O. BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317
I[OCH ARI STRON LICENSE 194819-A
Al �Yl 1l i' 1!W
QUOTATION
09-079.2 (REVISED 6-16-09)
PAGE 1 OF t
TO: NATIONAL CITY STREET RESURFACING FY 06-07 ATTN- BYRON'WADE
1243 NATIONAL CITY BLVD. TEL (619) 336-4380
NATIONAL CITY CA. 91950 CELL
FAX (619) 3364391
DATE. 6/30/2009 EMAIL byronwadel@mac. corn
We propose to furnish all labor, material, and equipment necessary to perform the following items of work suuMect to terms and conditions stated_
Thisquotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted.
JOB LOCATION 4th AND 'M' - SOLI I HEAST CORNER PCR TO 245LF EAST.
IDENTIFIED NATIONAL CITY STREET RESURFACING' CHANGE ORDER PROPOSAL #49- 4th AND 'M' G-2
ITEM
DESCRIPTION
APPRO%_
011ANTITY
UNIT
UNIT PRICE
TOTAL
1
MOBILIZATION & BOND COST
1
LS
5395.00
2
3
TRAFFIC CONTROL
1
LS
4945-00
REMOVE & REPLACE G7 SIDEWALK
234
SF
7.60
1778.40
13
REMOVE AND REPLACE G-2 CURB AND GUTTER
199
LF
45.00
11. 55
8955.00
3164.70
14
27
REMOVE AND REPLACE DRIVEWAY G-14
274
SF
ASPHALT
1
LS
5856.00
27.1
FILL AT TOE AND FEATHER AC 4 66FROM (N) G-2 TOE (6' FROM FLOWLINF), INCLUDES AREA OVER
1165
SF
AC BASED SLOT PATCH.
27.2
SAND AND SEAT
1165
SF
TOTAL
30094.10
•
•
d o1i4 %a
i3,$`34•1/0
�41-3i'13O.0
TERMS:
1
INCLUDES: ONE MOVE IN.
2
EXCLUDES. B. M. P.'s, PRECAST BOXES, SWPPP/TRAFFIC CONTROL PLANS. STRIPING, ANY ITEM NOT SPECIFICALLY STATED IN QUOTE
3
OTHERS TO PROVIDE SURVEY STAKING, TIED OFF SURVEY MARKERS,
[
CONDITIONS
1 Does not include hennas. bonds. any form of engmeennglslaking, testing, inspection. etc. 1, base under concrete, redwood headers, striping, baffle control, or utility adjustment unless otherwise specified.
2 Monthly Progress Payments and Full Payment upon completion Accounts are delinquent after 30 days. and they are subject to the maximum finance charge allowable by law.
3 Work to be done m accordance with plans, specifications. and quantities identified above Koch -Armstrong General Engineering Inc. shall be notified m writing prior to any proposed changes.
a Subgrade to be taken from it. r0 to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc begins work unless otherwise specified
5 Any unusual conditions of subsoil encountered. such as buried slabs. underground piping, hash deposits etcsnarl be deemed cause for additional charges
6 Required California Preliminary Lien information (Califoma Civil Code Section 3097130981 snail he provided to Kocn-Armstrong General Engineering, Inc before work begins
I Subject to Credit Approval and verification of California Preliminary Lien information
8 Class 2 material it included is Sid- recycled Class 2 per Cancans Standard Speabcatiun Section 26 unless otherwise noted
ptance.
Please sign and return one ccpy-thrs quotation constitutes the
sole and only agreement Any prior agreements. negotiations.
etc., not set forth herein are of no torte or effect.
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
Firm: NATIONAL CITY STREET RESURFACING FY 06-07
By:
By:
Date FRANK HERRERA
Date
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
P.O_ BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317
LICENSE 194819-A
QUOTATION
09-089.1 COP #50
PAGE 11PEV. 6-17-09
TO NATIONAL CITY STREET RESURFACING FY 06-07 ATTN BYRON WADE
1243 NATIONAL CITY BLVD. TEL (619) 336-4380
NATIONAL CITY . CA. 91950 CELL
FAX_ (619) 588-5475
DATE 6/3012009 EMAIL byronwadel@mac. corn
We propose to tarnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated.
Thisquotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted.
JOB LOCATION 10th AND 'V' STRET, NATIONAL CITY
IDENTIFIED "NATIONAL CITY STREET RESURFACING PROJECT.", CHANGE ORDER PROPOSAL #50- CROSS GUTTERS
ITEM
DESCRIPTION
AVPROX.
QUANTITY
UNIT
UNIT PRICE
TOTAL
1
MOBILIZATION LAYOUT CROSS GUI TERS & RAMPS RENTAL SAW MOVE IN CHARGE & BOND
1
LS
LS
706.00
2
TRAFFIC CONTROL
1
670.00
11
13
REMOVE & REPLACE G7 SIDEWALK
168
SF
7 60
1276.80
REMOVE & REPLACE G-2 CURB & GUTTER
30
LF
SE
45.00
1350.00
16
434
17.90
7768.60
REMOVE & REPLACE CROSS GUTTER G12.
18
PEDESTRIAN RAMPS G27, G28. G29, G30, G31.
1
EA
2065 00
2065.00
TOTAL
13836.40
INCLUDES: ONE MOVE IN. BOND COST FOR ITEMS 1 & 2.
EXCLUDES. BASE UNDER CONCRETE, STRIPING, ADJUSTING UTILITIES.
ANY WORK/LABOR/ MATERIALS OR ITEM NOT SPECIFICALLY STATED IN QUOTE.
CONDITIONS-
1 Does not include permits, bonds. any form of engineeringistaking, testing. inspection. etc. t. base under concrete. redwood headers striping. traffic control, or utility adjustment unless otherwise specified
2. Monthly Progress Payments and Full Payuii 1 upon completion. Accounts are delinquent after 30 days. and they are subject to the maximum finance charge allowable by law.
3. Work to be done in accordance with plans, specifications, and quantities identified above Koch -Armstrong General Engineering, Inc. shall be notified in writing prior to any proposed changes
4.Subgrade to be taken from r1- 10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified.
5- Any unusual conditions of subsoil encountered. suds as brined slabs. underground piping. trash deposits. etc shall be deemed cause for additional charges
6. Required California Preliminary hen u4urma0on (California Civil Code Section 3097/3098i shall be provided to Koch -Armstrong General Engineering. Inc. before work begins
7. Subject to Credit Approval and vepfication of Caldorma Preliminary hen information
B Class 2 material if included is 3VI" recycled Class 2 per Cattrans Standard Specification Section 26 unless otherwise noted
Acceptance:
Please sign and return one copy -this quotation constitutes the
sole and only agreement. Any prior agreements, negotiations,
etc., not 5e1 forth herein are of no force or effect
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
Firm- NA IONAL CITY STREET RESURFACING FY 06-07
By: By:
Date
FRANK HERRERA Dale
expstat,rpt
06/29/2009 5:51PM
Periods: 0 through 14
Expenditure Status Report
CITY OF NATIONAL CITY
7/1/2008 through 6/30/2009
Page:
001 GENERAL FUND
409 NON -DEPARTMENTAL
Account Number
Adjusted Year-to-date Year-to-date Prct
Appropriation Expenditures Expenditures Encumbrances Balance Used
500 CAPITAL IMPROVEMENT PROGRAM
500-500 Capital Outlay
500.598-6171 COUNTY SIDEWALK PROJECT-SWEETWATER ROAD 75,000.00
Total GENERAL FUND 75,000.00
Grand Total
2,323.92
21323,92
75,000.00 2,323.92
2,323.92
2,323.92
0, 00
0.00
2,323.92 0.00
72,676.08 3,10
72.676.08 3.10
72,676.08 3.10
Page: 1
The Treasurer
Will Pay
To
•
• • • •LS•1'13• N1• ICPI•
County of San Diego
1600 Pacific Highway
San Diego, CA 92101-2478
Wells Fargo Bank Ohio. N.A. 56-382/412
115 Hospital Drive
Van Wert. OH 45891
Seventy -Five Thousand Dollars And 00 Cents"""'"`'"`.""".`t.'
NATIONAL CITY, CITY OF
1243 NATIONAL CITY BLVD
NATIONAL CITY CA 91950 4397
1
THEsBACK:OF THISrDOCUMENTCONTAINS'-AN ARTIFICIAL.WATERMARK HOLDATAN'ANGL•E70•VIEW
Warrant No.
4935606
Date of Issue: 09/19/2008
*75,000.00*
VOID IF NOT PRESENTED 10 COUNTY TREASURER WITHIN
SIX MONTHS FROM DATE OF ISSUE. GOVT CODE SECT. 29802
AUDITOR AND CONTROLLER
v0493560E0 t:041203R 241: 9600050E6 211•
PLEASE ADDRESS CORRESPONOFNCE REGARDING THIS PAYMENT
SAN DIEGO COUNTY
AUDITOR AND CONTROLLER
ROOM 163 COUNTY ADMINISTRATION CENTER
SAN DIEGO, CA 92101-2478
(619) 531-5321
AUTHORITY/PO
INVOICE
DESCRIPTION
WARRANT NO. 4935606
DISCOUNT AMOUNT
525279
6/17/2008(
COMMUNITY PROJECTS FY07-08
CITY OF NATIONAL CITY
Finance Department
619 336-4330
National City 37 / 14862
09/24/2008 15:16:41.000 Reg WXP-CASHO2
Validation Receipt
CHARGES-
001-00000-3470
GF3410 sidewalk project o$
75000.00
Sub -total
$******75000.00
PAYMENT-
Check - 5606 $ 75000.00
county of san die9u
Change $***r******0.00
THANK YOU!
Business Hours:
7:00 -- 6:00 Monday Through Thursday
Closed on Fridays
NET.AMOUN(
0-00
75,000.00
0.40.
n r.:
-J
•7 c,
U'.
O
75,_000 00
r
0
RESOLUTION NO. 2009-178
RESOLUTION OF THE CITY COUNCIL OF
THE CITY OF NATIONAL CITY RATIFYING
CHANGE ORDER NO. 24 TO THE CONTRACT
WITH KOCH-ARMSTRONG GENERAL ENGINEERING,
INC. IN THE AMOUNT OF $27,835.00 TO ADD
MISSING SIDEWALK AND A RETAINING WALL
ON THE NORTH SIDE OF SWEETWATER ROAD,
EAST OF PROSPECT STREET, WITHIN AND AS
REQUESTED BY THE COUNTY OF
SAN DIEGO FOR THE NATIONAL CITY STREET
RESURFACING PROJECT, FY 08-09 (PHASE 2)
WHEREAS, on June 17, 2008, per Resolution No. 2008-107, the City Council
awarded a contract to Koch -Armstrong General Engineering, Inc. in the amount of
$5,327,000.00 for the National City Street Resurfacing Project, FY 08-09 (Phase 2),
Specification No. 08-04; and
WHEREAS, City staff is recommending the ratification of Change Order No. 24 in
the amount of $27,835 in order to modernize the area of the Project and provide safer
pedestrian access by adding missing sidewalk and a retaining wall on the north side of
Sweetwater Road, east of Prospect Street within and as requested by the County of San Diego;
and
WHEREAS, due to time constraints and the urgency in completing the work, the
Change Order has already been signed; therefore, it is requested that the City Council now
ratify Change Order No. 24.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby ratify Change Order No. 24 to the Contract with Koch -Armstrong General
Engineering, Inc. in the amount of $27,835 to add missing sidewalk and a retaining wall on the
north side of Sweetwater Road, east of Prospect Street, within and as requested by the County
of San Diego for Phase 2 of the National City Street Resurfacing Project, FY 08-09.
PASSED and ADOPTED this 21st day of Jul
o nson,
ATTEST:
Mic ael R. Dalla, Cit Clerk
APPROVED AS TO FORM:
George H. tiser, Ill
City Attorney
Passed and adopted by the Council of the City of National City, California, on July 21,
2009 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Parra, Sotelo-Solis, Van Deventer, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
City C -rk of the City of ational City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2009-178 of the City of National City, California, passed and
adopted by the Council of said City on July 21, 2009.
City Clerk of the City of National City, California
By:
Deputy
City of National City, California
COUNCIL AGENDA STATEMENT
MEETING DATE July 21, 2009
AGENDA ITEM NO.
10
ITEM TITLE A Resolution of the City Council of the City of National City ratifying Change Order No. 24 to
the contract with Koch -Armstrong General Engineering, Inc. in the amount of $27,835.00 to add missing
sidewalk and a retaining wall on the north side of Sweetwater Road, east of Prospect Street within and as
requested by the County of San Diego for the National City Street Resurfacing Project, FY 08-09 (Phase 2).
(Funded by County Funds through a general fund revenue account)
PREPARED BY Kenneth Fernandez
EXPLANATION
Please see attached page with explanation.
DEPARTMENT Engineering EXT. 4388
Environmental Review X N/A
Financial Statement
MIS Approval
Approved By:
Finance Director
The total amount for Change Order No. 24 is $27,835.00. Additional allocation of funds of $27,835.00 is requested for this change order.
Funding is available through General Funds Acct No. 001-409-500-598-6171.
Account No.
STAFF RECOMMENDATION
Adopt te olution.
B • RD / COMMISSION R - OMMENDATION
N/A
l
ATTACHMENTS (Listed Below) Resolution No.
1. Resolution
2. Change Order #24
3. Photocopy of warrant from County of San Diego
A-200 (Rev. 7/03)
SPEC 08-04 CO#24