Loading...
HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #10 Street Resurfacing Project FY 09-10INcoRPORAT'ED CHANGE ORDER #10 February 23, 2010 ENGINEERING DEPT. 2010 MAR I I P 4: 42 Project: Street Resurfacing Project, FY 09-10 Specification #09-09 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract See Attachment "A". Justification for Change in Contract This change in contract is required for the removal and replacement of one (1) in -pavement flashing light at a school cross -walk located at 24th Street and F Avenue. The removal and replacement is required because the light was destroyed. The replacement is not covered under warranty because an inspection of the light revealed that the destruction was not the result of normal wear and tear. The work for this change in contract is of a specialized nature and will be performed by Republic ITS, a contractor experienced with and qualified to perform such specialized work. The lump sum price for this change in contract is in -line with the original contract and the work previously performed. Cost Reconciliation See Attachments "A & B". Construction Contract Accounting Summary Original Contract Amount: 1,272,720.00 Net change by previously authorized Change Orders: 531,441.51 Contract amount prior to this Change Order: 1,804,161.51 Amount of this change order: 1,810.71 New contract amount: $ 1,805,972.22 Original contract time (calendar days): Previously approved additional working days: Additional working days for this change order: Total contract time (working days): (see Weekly Statement of Contract Time for completion date) Reviewed by: rinbipal Civil Engin er Agreed to and Accepted by. D to 03/08/10 mstrong Date eral Engineering, Inc. cc: Contractor, Construction File, Project Manager, City Clerk 80 35 0 115 Recommended for approval by: 1243 National City Boulevard National City , CA 91950 Tel (619) 336-4380 Fax (619) 336-4397 • CITY OF NATIONAL CITY Resurfacing 09-10 Specification No. 09-09 ATTACHMENT "A" CO #10 Description of Change in the Contract This change in contract is for the removal and replacement of one (1) in -pavement flashing light at a school cross -walk located at 24th Street and F Avenue. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. CITY OF NATIONAL CITY Resurfacing 09-10 Specification No. 09-09 ATTACHMENT "B" CO #10 ITEM DESCRIPTION QUANTITY/ UNIT UNIT PRICE TOTAL 1 Light Replacement Material 1 LS 1347.00 1,347.00 Mark-up 5.00% 67.35 Sub -total: 1,414.35 Bond Cost: 1.50% 21.22 Item #1 Cost: 1,435.57 2 Light Replacement Labor 1 LS 352.00 352.00 Mark-up 5.00% 17.60 Sub -total: 369.60 Bond Cost: 1.50% 5.54 Item #2 Cost: 375.14 CHANGE ORDER PROPOSAL TOTAL 1 LS 1,810.71 KOCH-ARMSTRONG GENERAL ENGINEERING, INC. P.O. BOX 1190, LAKESIDE, CA 92040-0906 TEL: (619) 561-2005 FAX: (619) 561-0317 KOCH•ARMSTRONG LICENSE 194819-A QUOTATION 09-160 COP-14 PAGE 1 CO-10 TO: NATIONAL CITY STREET RESURFACING FY 06-07 ATTN: BYRON WADE 1243 NATIONAL CITY BLVD. TEL: (619) 336-4380 NATIONAL CITY , CA. 91950 CELL: FAX: (619)336 4397 DATE: 3/7/2010 EMAIL: byronwadel@mac.com We propose to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated. This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted. JOB LOCATION 24th STREET AND'F' AVENUE. IDENTIFIED NATIONAL CITY STREET RESURFACING: CHANGE ORDER PROPOSAL #14- LIGHT REPLACEMENT & CONTROLLER INSTALLATION. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT PRICE TOTAL 1 REPUBLIC QUOTE: LIGHT REPLACEMENT COST, LABOR AND MATERIAL 1 LS 1347.00 MARK-UP 5% 67.35 SUBTOTAL 1 LS 1414.35 BOND COST 1.5% 21.22 ITEM #1 TOTAL 1 LS 1435.57 2 REPUBLIC QUOTE: REPLACEMENT LABOR COST ONLY 1 LS 352.00 MARK-UP 5% 17.60 SUBTOTAL 1 LS 369.60 BOND COST 1.5% 5.54 ITEM #2 TOTAL 1 LS 375.14 TOTAL: CHANGE ORDER PROPOSAL 1810.71 REASON FOR CHANGE ORDER REQUEST: UPON REMOVAL OF EXISTING LANE LIGHT FIXTURE, 2 LIGHTS WERE DISCOVERED NOT WORKING UPON THE FIRST MOVE. AFTER REMOVAL, REPUBLIC ITS SENT BACK THE 2 LIGHTS TO THE MANUFACTURER WHO REPLACED THEM AT NO COST AS PER A 5 YEAR WARRANTY ON PARTS. A THIRD LIGHT WAS DISCOVERED AS HAVING MINOR PHYSICAL DAMAGE BUT STILL WORKING AND SINCE THIS WAS NOT A WARRANTY ISSUE, THE LIGHTS WERE RE -INSTALLED AS IS. UPON INSTALLATION OF THE DAMAGED LIGHT IT NO LONGER WORKED. ALSO, UPON RE -ENERGIZING THE CONTROLLER FAILED AND THE LIGHTS WOULD NOT FLASH. THE CONTROLLER HAS ALREADY BEEN REPLACED WITH A NEW WARRANTY COMPONENT. THE COST FOR THE LIGHT REPLACEMENT AND LABOR FOR THE CONTROLLER REPLACEMENT IS AS SHOWN ABOVE. CONDITIONS: IDees not include permits, bonds, any form of engineering(staking, testing, inspection, etc.), base under concrete, redwood headers, striping, Traffic control, or utility adjustment unless otherwise specified. 2. Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent after 30 oays, and they are subject to the maximum finance charge allowable by law. 3 Work to be done in accordance with plans, specifications, and quantities identified above. Koch -Armstrong General Engineering, Inc. shall be notified in writing prior to any proposed changes. 4.Subgrade to be taken from +1- 10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified. 5. Any unusual conditions of subsoil encountered. such as buried slabs, underground piping, trash deposits, etc. snail be deemed cause for additional charges. 6 Required California Preliminary Lien information (California Civil Code Section 3097/3098) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins. 7 Subject to Credit Approval and verification of California Preliminary Lien information. 8 Class 2 material if inciuded is 314" recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted. Acceptance: Please sign and return one copy -This quotation constitutes the sole and only agreement. Any prior agreements, negotiations, etc.. not set forth herein are of no force or effect. KOCH-ARMSTRONG GENERAL ENGINEERING, INC. Firm: NATIONAL CITY STREET RESURFACING FY 06-07 By: By: Date FRANK HERRERA Date r OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax KOCH ARMSTONG GENERAL ENGINEERING Change Order #10 Street Resurfacing Project, FY 09-10 Tess Corpuz (Engineering) Forwarded Copy of Change Order to Contractor