HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #4, #5 Marina Gateway Streetscape, FY 09-10+*--CALIFOR NIA -;+ �`-. ZNCORPORA480 '-' CHANGE ORDER #4 April 1, 2010 Project: Marina Gateway Streetscape Specification #08-16 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract This change in contract is for the remvoal and disposal of approximately eighty (80) lineal feet of RCP pipe that was discovered around the existing sewer main and encased in concrete below the rail road tracks. Justification for Change in Contract See Attachment "A" Cost Reconciliation See Attachments "A & B. Construction Contract Accounting Summary Original Contract Amount: 1,916,282.35 Net change by previously authorized Change Orders: 46,263.42 Contract amount prior to this Change Order: 1,962,545.77 Amount of this change order: 6,545.57 New contract amount: $ 1,969,091.34 Original contract time (calendar days): 120 Previously approved additional working days: 6 Additional working days for this change order: 1 Total contract time (working days): 127 (see Weekly Statement of Working Days for completion date) Reviewed by: Agreed to and Accepted by: Lir April 6, 2010 Koch(Afmstrong — Date General Engineering, Inc. cc: Contractor, Construction File, Project Manager, City Clerk Recommended for approval by: Reviewed by: er Date 1243 National City Boulevard National City , CA 91950 Tel (619) 336-4380 Fax (619) 336-4397 CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "A" CO #4 Justification for Change in Contract This change in contract is necessary because the RCP pipe found around the sewer main was not shown on the original plans and was not known to the City during design. The RCP pipe needed to be removed in order for the contractor to continue to remove and replace the sewer main. The removal of the concrete and RCP pipe required the use of a breaker and required contractor to haul excess concrete and RCP pipe to the dump. The approximately six (6) hours of labor and equipment represents the additional hours over what would have been required to remove the existing sewer main by itself. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "B" CO #4 ITEM DESCRIPTION QUANTITY/ % UNIT UNIT PRICE Running Total TOTAL 1 Labor Foreman (1) 6 HR 73.94 443.64 Operator (2) 12 HR 76.02 912.24 Laborer (1) 6 HR 53.15. 318.90 Laborer(2) 12 HR 55.42 665.04 Subtotal: 2339.82 Mark-up (20%): 467.96 Item # 1 - Labor Total: 2,807.78 2 Equipment Crew Truck 6 HR 27.43 164.58 JD 710 Backhoe 6 HR 70.05 420.30 Hitachi 790 E 6 HR 91.49 548.94 Cat 256 Skidsteer Loader 6 HR 22.08 132.48 Furakawa 6 HR 110.34 662.04 Bobtail Dump Truck 6 HR 46.46 278.76 End Dump 4 HR 98.00 392.00 Subtotal: 2.599.10 Mark-up (15%): 389.87 Item # 2 - Equipment Total: 2,988.97 3 Materials Dump Fees 2 EA 150.00 300.00 Subtotal: 300.00 Mark-up (15%): 45.00 Item # 3 - Materials Total: 345.00 Sub -Contractor Sub -total: 6,141.75 K-A MARK-UP: 5% 307.09 Subtotal: 6,448.84 BOND: 1.50% 96.73 CHANGE ORDER PROPOSAL TOTAL 1 LS 6,545.57 -y-- CALIFORNIA NN.IJION" � LAITY ) INCORPORATLP CHANGE ORDER #5 April 1, 2010 Project: Marina Gateway Streetscape Specification #08-16 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract Contractor shall remove and dispose of existing concrete foundations in conflict with the new improvements on the south side of 23rd and around the PCRs and grade the soils level to 1' behind the new walk with a minimum 1 1/2:1 slope, spread excess soil on the lot, and re-establish the silt fence in this area. Justification for Change in Contract See Attachment "A". Cost Reconciliation See Attachments "A", "B", and "C". Construction Contract Accounting Summary Original Contract Amount: 1,916,282.35 Net change by previously authorized Change Orders: 52,808.99 Contract amount prior to this Change Order: 1,969,091.34 Amount of this change order: 7,980.07 New contract amount: $ 1,977,071.41 Original contract time (calendar days): 120 Previously approved additional working days: 7 Additional working days for this change order: 0 Total contract time (working days): 127 (see Weekly Statement of Working Days for completion date) Reviewed by: Agreed to and Accepted by: April 6, 2010 Koch Among `"! Date General Engineering, Inc. cc: Contractor, Construction File. Project Manager, City Clerk Recommended for approval by: ger by: Date 1243 National City Boulevard National City , CA 91950 Tel (619) 336-4380 Fax (619) 336-4397 CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "A" CO #5 Justification for Change in Contract This change in contract is necessary because the quonset hut removals south of 23rd did not remove the foundations in the right-of-way as was the original plan. Therefore, the foundations and adjacent soils were not shown on the plans and their removal was not part of the original scope of work. They are now in the way of the new improvements and must be removed. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT'B" CO #5 ITEM DESCRIPTION QUANTITY/ /° UNIT UNIT PRICE RUNNING TOTAL TOTAL Labor (hourly rate includes 33% surcharge) Operator 8 HR 76.02 608.16 Laborer 1 16 HR 53.15 850.40 Item #1 Sub -total: 1,458.56 Mark-up Cost: 20.00% 291.71 Item #1 Cost: 1,750.27 2 Equipment Case C X80 Excavator 4 HR 50.00 200.00 936 Loader 4 HR 35.00 140.00 Item #2 Sub -total: 340.00 Mark-up Cost: 15.00% 51.00 Item #2 Cost: 391.00 3 Materials Dump Fees 1 EA 150.00 150.00 Silt Fence 5 EA 18.22 91.10 Item #3 Sub -total. 241.10 Mark-up Cost: 15.00% 36-17 Item #3 Cost: 277.27 SUBTOTAL: 2,418,54 Bond: 1.50% 36.28 CHANGE ORDER PROPOSAL TOTAL 1 LS 2,454.82 CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT"C" CO #5 ITEM DESCRIPTION QUANTITY/ /o UNIT UNIT. PRICE RUNNING TOTAL TOTAL 1 Labor Foreman 8 HR 72.00 576.00 Operator (1) 8 HR 70.00 560.00 Laborer (2) 16 HR 52.00 832.00 Item #1 Sub -total: 1,968.00 Mark-up Cost: 20.00% 393.60 Item #1 Cost: 2,361.60 2 Equipment Bobcat w! Breaker (2) 16 HR 50.00 800.00 Crew truck (2) 16 HR 25.00 400.00 10 Wheeler (1) 8 HR 88.00 704.00 Equipment Moves (2) 2 EA 88.00 176.00 Item #2 Sub -total: 2,080.00 Mark-up Cost: 15.00% 312.00 Item #2 Cost: 2,392.00 3 Materials Dumo Fees (wi Reber) 6 EA 100.00 600.00 Item #3 Sub -total: 600.00 Mark-up Cost: 15.00% 90.00 Item #3 Cost: 690.00 SUBTOTAL: 5.443.60 Bond: 1.50% 81.65 CHANGE ORDER PROPOSAL TOTAL 1 LS 5,525.25 INCORPORATED April 13, 2010 Mr. Monty Koch President Koch -Armstrong General Engineering, Inc. P.O. Box 1190 Lakeside, CA 92040 Dear Mr. Koch, OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dala, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax On April 1, 2010, Change Order #4 and #5 to contract was executed between the City of National City and Koch -Armstrong General Engineering, Inc. We are enclosing for your records fully executed original change orders. Michael R. Dalla, CMC City Clerk Enclosure cc: Engineering Dept.