HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #3 Marina Gateway Streetscape, FY 09-10NAT CIIrif RkM Zrreeepostrertite CHANGE ORDER #3 March 25, 2010 Project: Marina Gateway Streetscape Specification #08-16 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract This change in contract is for the installation of a 7.5"x12" reinforced concrete header around the pervious concrete at all locations, (detail attached). The header shall be installed at both ends of each pervious concrete section and between the pervious concrete and the asphalt. There will be approximately 1,260 LF of new concrete header. Justification for Change in Contract See Attachment "A" Cost Reconciliation See Attachments "A & B". Construction Contract Accounting Summary Original Contract Amount: Net change by previously authorized Change Orders: Contract amount prior to this Change Order: Amount of this change order: New contract amount: Original contract time (calendar days): 120 Previously approved additional working days: 0 Additional working days for this change order: 6 Total contract time (working days): 126 (see Weekly Statement of Working Days for completion date) Reviewed by: Date Agreed to and Accepted by: Koch Armstro g Date 1,916,828.35 8,526.42 1,925,354.77 37,737.00 $ 1,963,091.77 Recommended for approval by: / L.Reviewed by: ity Engineer Approved by: er cc: Contractor, Construction File, Project Manager, City Clerk City Manager(' Date iti Date 1243 National City Boulevard National City , CA91950 Tel (619) 336-4380 Fax (619) 336-4397 CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "A" CO #3 Justification for Change in Contract The concrete header was added after Rick Engineering met with the manufacturer of the pervious concrete product and it was determined that the header is necessary to ensure the integrity of the pervious concrete adjacent to a travel way and where automobiles will be turning while parking. The pervious concrete is in the parking areas. It is also necessary in the future when the City would repair the street to protect the pervious concrete. This change order adds value to the end product. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "B" CO #3 ITEM DESCRIPTION QUANTITY/ UNIT UNIT PRICE TOTAL 1 7.5" x 12" Concrete Band per "Detail: Porous Concrete" Sawcut, demolition, excavation, haul, and dispose of existing concrete/soil Fine -grade and compact to 95% Additional mobilization 1260 1260 1260 1260 LF LF LF LF 29.95 37.737.00 12 x 12 backfill with native soil 1260 LF CHANGE ORDER PROPOSAL TOTAL 1 LS 37,737.00 ASHALT c%cRETE T.4.5' -1,01 CLEVELAND AVENUE T•G.5' FOR NARRISON AVENUE T-6.0" FOR 23RD S'.REET o'CEMENT TREATED 3ASE SUBGRADE COMPACTED 55: • • � mV k•- >•,• 12" _ A. Y v Y o•d tr r-cLAB 6 cur?ER ++ i-SIOEWALK ''."'111111WWWOIM 11111 i K� • _ r•rrria� 11; v r f -11111Mall I NOTEIO'ER EXCAVATION OF SUBGRADE VAY CE BEMIRED IF SPECIF ED BY GEOTECHNICAL ENC1NEEp IN FIE4D DETAILPO-.• - CONCRETE 0 S ALE IASL E 1-1 REATHENT LOCATION U.14.0EPTH O= GRAVEL SUBBASE MI l P1-TUFF ROCK 10" PP2-TURF BLOCK IS" PP3-11URF ALDO: 8" _ PPA-TYRE•' BLOCK 12"tEXCE^T R OVIOE 22"MIN.UEPTN FOR 2 WESTERNLY PARXtNG STALLS? PPS -TURF 'BLOCK 15'IFx::EPT PROVIDE 22"M!N. DEPTH FOR 2 EASTERNLY PARKING STA:LS) PP6-TURF CLUCK 12' ?PT -TURF BLOCK 9" FPO -TURF BLOCK S' PPB-AC 7.0" NOTEI FOR POROUS PAVEMCNT TREATMENT LOCATIONS SEE SHEETS 10101-0-10 0.4-O 0 1.5" 11 DE CONCRETE BANG 2-•5 BARS CONT. 14" CLR. MIN.) LOCATION PER LANDSCAPE PLANS AND 'WITHIN LIMITS OF PARKING STALLS 8" POROUS CONCRETE ® jL" CRAVEL-DEPTK VARIES ACROSS SITE. SEE TABLE I -I ON THIS SHEET FOR DEPTH. VERIFY RECOMMENDATIONS IN THE STORM WATER OUALiTT TECHNICAL REPORT, WW1 ISON NON -WOVEN GEOTEXTILE FABRIC -ALL RDUNV HOPE GEOMEMBRA E TO BE PLACED DOWN TO THE BOTTOM GRAVEL ADJACENT TO. AND OUTSOE OFmw.EFE SOWN. SPECIAL HOTEL WRAP SEWER MANHOLE Wf HOPE" MEMBRANE SEE ;a% KOCH-ARMSTRONG GENERAL ENGINEERING, INC. P.O. BOX 1190, LAKESIDE, CA 92040-0906 TEL: (619) 561-2005 FAX: (619) 561-0317 KOCH-ARMSTRONG LICENSE 194819-A QUOTATION 10-024.2 COP-6 PAGE 1 OF 1 (REVISED 3-25-10) TO: NATIONAL CITY ATTN: BYRON WADE 1243 NATIONAL CITY BLVD. TEL NATIONAL CITY . CA. 91950 CELL: (619) 244-3418 FAX: (619) 794-0180 DATE: 3/25/2010 EMAIL: byronwadel@mac.com We propose to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated. This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted. JOB LOCATION SEE CONSTRUCTION PLANS IDENTIFIED MARINA GATEWAY STREETSCAPE CHANGE ORDER PROPOSAL #6: 7" POROUS CONCRETE BAND. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT PRICE TOTAL 1 7.5" x 12" CONCRETE BAND PER "DETAIL : POROUS CONCRETE", 'No. J12861Q/ DATED 2-25-10'. 1260 LF 29.95 37737.00 TERMS: 1 INCLUDES: ONE MOVE IN, 1.50% BOND COST, MEDIUM BROOM FINISHED CONCRETE. 2 EXCLUDES: COLD MIX OR AC PATCH, ADDED BMP'S DUE TO DELETION OF COLD MIX, NIGHT/ WEEKEND/ HOLIDAY WORK DAYS, ANY WORK/LABOR/ MATERIALS OR ITEM NOT SPECIFICALLY STATED IN QUOTE. CONDITIONS: 1.0oes not include permits, bonds, any form of engineering(staking, testing, inspection. etc.), base under concrete. redwood headers, striping, traffic control, or utility adjustment unless otherwise specified. 2. Monthly Progress Payments and FuX Payment upon completion. Accounts are delinquent after 30 days. and they are subject to the maximum finance charge allowable by law. 3. Work to be done in accordance with plans, specifications, and quantifies identified above. Koch -Armstrong General Engineering. Inc. shall be notified in writing prior to any proposed changes. 4.Subgrade to be taken from +\- _10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified. 5. Any unusual conditions of subsoil encountered, such as buried slabs. underground piping. trash deposits, etc. shall be deemed cause for additional charges. 6. Required California Preliminary lien information (California Civil Code Section 3097/3098) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins. 7. Subject to Credit Approval and verification of California Preliminary Lien information. 8. Class 2 material if included is 3`4" recycled Class 2 per Calirans Standard Specification Section 26 unless otherwise noted. Acceptance: Please sign and return one copy -this quotation constitutes the sole and only agreement. Any prior agreements. negotiations, etc., not set forth herein are of no force or effect. KOCH-ARMSTRONG GENERAL ENGINEERING, INC. Firm: NATIONAL CITY By: By: Date FRANK HERRERA Date OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax KOCH ARMSTRONG GENERAL ENGINEERING Change Order #3 Marina Gateway Streetscape, FY 09-10 Tess Corpuz (Engineering) Forwarded Copy of Change Order to Contractor