CHANGE ORDER #3
March 25, 2010
Project: Marina Gateway Streetscape Specification #08-16
Contractor: Koch -Armstrong
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
This change in contract is for the installation of a 7.5"x12" reinforced concrete header around the pervious
concrete at all locations, (detail attached). The header shall be installed at both ends of each pervious
concrete section and between the pervious concrete and the asphalt. There will be approximately 1,260 LF of
new concrete header.
Justification for Change in Contract
See Attachment "A"
Cost Reconciliation
See Attachments "A & B".
Construction Contract Accounting Summary
Original Contract Amount:
Net change by previously authorized Change Orders:
Contract amount prior to this Change Order:
Amount of this change order:
New contract amount:
Original contract time (calendar days): 120
Previously approved additional working days: 0
Additional working days for this change order: 6
Total contract time (working days): 126
(see Weekly Statement of Working Days for completion date)
Reviewed by:
Date
Agreed to and Accepted by:
Koch Armstro g Date
1,916,828.35
8,526.42
1,925,354.77
37,737.00
$ 1,963,091.77
Recommended for approval by:
/
L.Reviewed by:
ity Engineer
Approved by:
er
cc: Contractor, Construction File, Project Manager, City Clerk City Manager('
Date
iti
Date
1243 National City Boulevard
National City , CA91950
Tel (619) 336-4380
Fax (619) 336-4397
CITY OF NATIONAL CITY
Marina Gateway Streetscape
Specification No. 08-16
ATTACHMENT "A" CO #3
Justification for Change in Contract
The concrete header was added after Rick Engineering met with the manufacturer of the pervious concrete
product and it was determined that the header is necessary to ensure the integrity of the pervious concrete
adjacent to a travel way and where automobiles will be turning while parking. The pervious concrete is in the
parking areas. It is also necessary in the future when the City would repair the street to protect the pervious
concrete. This change order adds value to the end product.
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and the
Contractor and represents the entire agreement for the work described herein and includes all costs
associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance,
bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby
incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work
as provided by the City.
CITY OF NATIONAL CITY
Marina Gateway Streetscape
Specification No. 08-16
ATTACHMENT "B"
CO #3
ITEM
DESCRIPTION
QUANTITY/
UNIT
UNIT PRICE TOTAL
1
7.5" x 12" Concrete Band per "Detail: Porous Concrete"
Sawcut, demolition, excavation, haul, and dispose of existing concrete/soil
Fine -grade and compact to 95%
Additional mobilization
1260
1260
1260
1260
LF
LF
LF
LF
29.95 37.737.00
12 x 12 backfill with native soil
1260
LF
CHANGE ORDER PROPOSAL TOTAL
1
LS
37,737.00
ASHALT c%cRETE
T.4.5' -1,01 CLEVELAND AVENUE
T•G.5' FOR NARRISON AVENUE
T-6.0" FOR 23RD S'.REET
o'CEMENT TREATED
3ASE
SUBGRADE
COMPACTED 55:
•
•
� mV k•- >•,•
12" _
A. Y
v Y
o•d
tr
r-cLAB 6 cur?ER
++ i-SIOEWALK
''."'111111WWWOIM 11111 i K�
• _ r•rrria�
11;
v r f
-11111Mall
I
NOTEIO'ER EXCAVATION OF SUBGRADE VAY
CE BEMIRED IF SPECIF ED BY
GEOTECHNICAL ENC1NEEp IN FIE4D
DETAILPO-.• - CONCRETE
0 S ALE
IASL E 1-1
REATHENT LOCATION
U.14.0EPTH O= GRAVEL SUBBASE MI
l P1-TUFF ROCK
10"
PP2-TURF BLOCK
IS"
PP3-11URF ALDO:
8" _
PPA-TYRE•' BLOCK
12"tEXCE^T R OVIOE 22"MIN.UEPTN FOR 2 WESTERNLY PARXtNG STALLS?
PPS -TURF 'BLOCK
15'IFx::EPT PROVIDE 22"M!N. DEPTH FOR 2 EASTERNLY PARKING STA:LS)
PP6-TURF CLUCK
12'
?PT -TURF BLOCK
9"
FPO -TURF BLOCK
S'
PPB-AC
7.0"
NOTEI FOR POROUS PAVEMCNT TREATMENT
LOCATIONS SEE SHEETS 10101-0-10 0.4-O
0 1.5" 11 DE CONCRETE BANG
2-•5 BARS CONT. 14" CLR. MIN.)
LOCATION PER LANDSCAPE PLANS
AND 'WITHIN LIMITS OF PARKING STALLS
8" POROUS CONCRETE
® jL" CRAVEL-DEPTK VARIES ACROSS SITE.
SEE TABLE I -I ON THIS SHEET FOR DEPTH. VERIFY
RECOMMENDATIONS IN THE STORM WATER OUALiTT TECHNICAL
REPORT,
WW1 ISON NON -WOVEN
GEOTEXTILE FABRIC -ALL RDUNV
HOPE GEOMEMBRA E TO BE PLACED DOWN
TO THE BOTTOM GRAVEL ADJACENT TO.
AND OUTSOE OFmw.EFE SOWN.
SPECIAL HOTEL WRAP SEWER MANHOLE Wf HOPE" MEMBRANE
SEE
;a%
KOCH-ARMSTRONG GENERAL ENGINEERING,
INC.
P.O. BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317
KOCH-ARMSTRONG LICENSE 194819-A
QUOTATION
10-024.2 COP-6
PAGE 1 OF 1 (REVISED 3-25-10)
TO: NATIONAL CITY ATTN: BYRON WADE
1243 NATIONAL CITY BLVD. TEL
NATIONAL CITY . CA. 91950 CELL: (619) 244-3418
FAX: (619) 794-0180
DATE: 3/25/2010 EMAIL: byronwadel@mac.com
We propose to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated.
This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted.
JOB LOCATION SEE CONSTRUCTION PLANS
IDENTIFIED MARINA GATEWAY STREETSCAPE CHANGE ORDER PROPOSAL #6: 7" POROUS CONCRETE BAND.
ITEM
DESCRIPTION
APPROX.
QUANTITY
UNIT
UNIT PRICE
TOTAL
1
7.5" x 12" CONCRETE BAND PER "DETAIL : POROUS CONCRETE", 'No. J12861Q/ DATED 2-25-10'.
1260
LF
29.95
37737.00
TERMS:
1
INCLUDES: ONE MOVE IN, 1.50% BOND COST, MEDIUM BROOM FINISHED CONCRETE.
2
EXCLUDES: COLD MIX OR AC PATCH, ADDED BMP'S DUE TO DELETION OF COLD MIX,
NIGHT/ WEEKEND/ HOLIDAY WORK DAYS, ANY WORK/LABOR/ MATERIALS OR ITEM NOT SPECIFICALLY STATED IN QUOTE.
CONDITIONS:
1.0oes not include permits, bonds, any form of engineering(staking, testing, inspection. etc.), base under concrete. redwood headers, striping, traffic control, or utility adjustment unless otherwise specified.
2. Monthly Progress Payments and FuX Payment upon completion. Accounts are delinquent after 30 days. and they are subject to the maximum finance charge allowable by law.
3. Work to be done in accordance with plans, specifications, and quantifies identified above. Koch -Armstrong General Engineering. Inc. shall be notified in writing prior to any proposed changes.
4.Subgrade to be taken from +\- _10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified.
5. Any unusual conditions of subsoil encountered, such as buried slabs. underground piping. trash deposits, etc. shall be deemed cause for additional charges.
6. Required California Preliminary lien information (California Civil Code Section 3097/3098) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins.
7. Subject to Credit Approval and verification of California Preliminary Lien information.
8. Class 2 material if included is 3`4" recycled Class 2 per Calirans Standard Specification Section 26 unless otherwise noted.
Acceptance:
Please sign and return one copy -this quotation constitutes the
sole and only agreement. Any prior agreements. negotiations,
etc., not set forth herein are of no force or effect.
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
Firm: NATIONAL CITY
By:
By:
Date FRANK HERRERA
Date
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone • 619-336-4229 fax
KOCH ARMSTRONG GENERAL ENGINEERING
Change Order #3
Marina Gateway Streetscape, FY 09-10
Tess Corpuz (Engineering) Forwarded
Copy of Change Order to Contractor