HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #2 Marina Gateway Streetscape, FY 09-10CHANGE ORDER #2
March 10, 2010
Project: Marina Gateway Streetscape Specification #08-16
Contractor: Koch -Armstrong
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
This change in contract is for additional night time labor, welding labor and additional miscellaneous parts to be
installed at the intersection of 23rd Street and Cleveland Avenue and the intersection of Bay Marina Drive and
Marina Way. See Attachment "B" for itemization of additional labor and parts.
Justification for Change in Contract
See Attachment "A".
Cost Reconciliation
See Attachments "A & B".
Construction Contract Accounting Summary
Original Contract Amount:
Net change by previously authorized Change Orders:
Contract amount prior to this Change Order:
Amount of this change order:
New contract amount:
Original contract time (calendar days): 120
Previously approved additional working days: 0
Additional working days for this change order: 0
Total contract time (working days): 120
(see Weekly Statement of Working Days for completion date)
Reviewed by:
Principal Civil Engineer Date
Agreed to and Accepted by:
03/11/10
Koch strong Date
al Fng., Inc.
cc: Contractor, Construction File, Project Manager, City Clerk
1,916,282.35
3,785.67
1,920,068.02
4,740.75
$ 1, 924, 808.77
Recommended for approval by:
1243 National City Boulevard
National City , CA 91950
Tel (619) 336-4380
Fax (619) 336-4397
CITY OF NATIONAL CITY
Marina Gateway Streetscape
Specification No. 08-16
ATTACHMENT "A" CO #2
Justification for Change in Contract
This change in contract is due to the existing conditions and types of connections required for the new water
line being different than the conditions shown on the plans at Bay Marina Drive and Marina Way and for
Cleveland Avenue and 23rd Street. The Bay Marina Drive connection is into a steel line which requires
welding and a butt strap not originally anticipated in the bid documents. The Cleveland Avenue and 23rd
Street location will require a wet tap by removing an old service line at the connection point. Both locations will
require a water line shut down for the wet tapping. Since this line services the hotel and there is no other way
of high lining the hotel the work must be done at night. The new process not originally considered in the bid
documents will require the additional services of a welder, extra parts and four (4) hours extra crew time, as
itemized on Attachment "B". This change in contract is necessary because the conditions making this work
necessary were not shown on the bid documents and constitutes a changed condition. This change order is
also necessary to prevent further delay of this project and to provide adequate notice to local businesses that
will have their water temporarily disabled while the work is performed. The work for this change order will be
performed by Charles King Company, a contractor experienced with and qualified to perform such work and
subcontractor to the prime, Koch -Armstrong.
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and the
Contractor and represents the entire agreement for the work described herein and includes all costs
associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance,
bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby
incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work
as provided by the City.
CITY OF NATIONAL CITY
Marina Gateway Streetscape
Specification No. 08-16
ATTACHMENT "B"
CO #2
ITEM
DESCRIPTION
QUANTITY/
54,
UNIT
UNIT
PRICE
RUNNING TOTAL
TOTAL
1
Labor (hourly rate includes 33% surcharge)
Foreman
4
HR
73.94
295.76
Operator Engineer 8
4
HR
76.02
304.08
Laborer 1
4
HR
53.15
212.60
(2) Laborer4
8
HR
55.42
443.36
Item #1 Sub -total:
1,255.80
Mark-up Cost:
20.00%
251.16
Item #1 Cost:
1,506.96
2
Equipment
Crew Truck (1)
4
HR
27.43
109.72
JD 710j Backhoe
4
HR
60.07
240.28
Cat 256 Skidsteer Loader
4
HR
22.08
88.32
Traffic Control
4
HR
10.00
40.00
Lite Towers
8
HR
25.00
200.00
Item #2 Sub -total:
678.32
Mark-up Cost:
15.00%
101.75
Item #2 Cost:
780.07
3
Materials
Flanges
2
EA
145.00
290.00
Butt Strap
1
EA
290.00
290.00
NBG
2
EA
85.00
170.00
Valve Exchange
1
EA
125.00
125.00
Item #3 Sub -total:
875.00
Mark-up Cost:
15.00%
131.25
Item #3 Cost:
1,006.25
4
Subcontractors
Weld
8
HR
105.00
840.00
Hot Tap Extra 710-250 (extra trip)
1
EA
260.00
260.00
Item #4 Sub -total:
1,100.00
Mark-up Cost:
5.00%
55.00
Item #4 Cost:
1,155.00
4,448.28
SUBTOTAL:
K-A Mark -Up:
5.00%
222.41
SUBTOTAL:
4,670.69
Bond:
1.50%
70.06
CHANGE ORDER PROPOSAL TOTAL
1
LS
4,740.75
KOCH-ARMSTRONG GENERAL ENGINEERING,
INC.
�i P.O. BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317
Z� [STRONCt LICENSE 194819-A
/// QUOTATION
10-023.3 COP-5
PAGE 1 OF 2 (REVISED 3-11-10)
TO: NATIONAL CITY STREET RESURFACING FY 06-07 ATTN: BYRON WADE
1243 NATIONAL CITY BLVD. TEL: (619) 336-4380
NATIONAL CITY , CA. 91950 CELL:
FAX: (619) 336 4397
DATE: 3/11/2010 EMAIL: byronwadel@mac.com
We propose to furnish all labor, material, and equipment necessary to perform the following Items of work, subject to terms and conditions stated.
CO-2
This quotation expires 30 days from the date above and is good for work completed within one near of date above unless otherwise noted.
JOB LOCATION 23rd STREET & CLEVELAND AVE,INTERSECTION, BETWEEN SOUTHEAST & NORTHEAST CORNERS.
IDENTIFIED MARINA GATEWAY STRETSCAPE COP- 5: SWC COR-3, "NITE TIME WORK/ WELDING/ NITE WET TAP".
ITEM
DESCRIPTION
APPROX.
QUANTITY
UNIT
UNIT PRICE
TOTAL
1
NIGHT TIME WORK/ WELDING/ NITE WET TAP. BASED ON ATTACHED PROPOSAL FROM
1
LS
CHARLES KING COMPANY'
1.1
FIRST TIER SUB -CONTRACTOR: LABOR, EQUIPMENT & MATERIALS (EXCLUDING ITEMS LISTED IN 1.2.)
1.2
SECOND TIER SUBCONTRACTOR: WELD / HOT TAP EXTRA 710-250.
TOTAL -CHANGE ORDER PROPOSAL #3
1
LS
4448.28
K-A MARKUP
5.0%
222,41
SUBTOTAL
1
LS
4670.69
BOND
1.50%
70.06
TOTAL: CHANGE ORDER PROPOSAL #3
4740.75
1
INCLUDES: PREVAILING WAGES, NIGHT WORK. BONDCOST,
2
EXCLUDES: ADDITIONAL INSPECTION COSTS, WEEKEND/ HOLIDAY WORK
3
PROPOSAL REVISES TIE IN CONNECTION IMPROVEMENTS SHOWN ON PLAN SHEET 24 AND DETAIL'S' ON SHEET 25.
4
ATTACHED PROPOSAL FROM CHARLEDS KING COMPANY IS INCLUDED AND CONSIDERED AS PART OF THIS PROPOSAL.
CONDITIONS.
tDoes not include permits, bonds, any form of engineering(staking, testing, inspection, etc.), base under concrete, redwood headers. striping. traffic control, or utility adjustment unless otherwise specified.
2. Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent after 30 days, and they are subject to the maximum finance charge allowable by law.
3. Work to be done in accordance with plans, specifications. and quantities identified above. Koch -Armstrong General Engineering, Inc. shall be notified in writing prior to any proposed changes.
4.Subgrade to be taken from +\- .10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified.
5. Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits, etc. shall be deemed cause for additional charges.
6. Required California Preliminary Lien information (California Civil Code Section 3097/3098) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins.
7. Subject to Credit Approval and verification of California Preliminary Lien information.
8. Class 2 material if included is 314" recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted.
Acceptance:
Please sign and return one copy -this quotation constitutes the
sole and only agreement. Any prior agreements. negotiations,
etc., not set forth herein are of no force or effect.
Firm: NATIONAL CITY STREET RESURFACING FY 06-07
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
By:
By:
Date FRANK HERRERA
Date
KOCH-ARMSTRONG GENERAL ENGINEERING,
INC.
�� P.O. BOX 1190, LAKESIDE, CA 92040-0906
//I-'^��"�\ TEL: (619) 561-2005 FAX: (619) 561-0317
(KOCH-ARMSTR0NG 7 LICENSE 194819-A
14111111111110f QUOTATION -BREAKDOWN
10-023.3 COP-5
PAGE 2 OF 2 (REVISED 3-11-10)
TO: NATIONAL CITY STREET RESURFACING FY 06-07 ATTN: BYRON WADE
1243 NATIONAL CITY BLVD. TEL: (619) 336-4380
NATIONAL CITY, CA. 91950 CELL:
FAX: (619) 336 4397
DATE: 3/11/2010 EMAIL: byronwadel@mac.com
We propose to furnish all labor, material, and equipment necessary to perform the following items of work subject to terms and conditions stated.
This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted.
JOB LOCATION
IDENTIFIED
23rd STREET & CLEVELAND AVE. INTERSECTION, BETWEEN SOUTHEAST & NORTHEAST CORNERS.
MARINA GATEWAY STRETSCAPE COP- 5: SWC COR-3, "NITE TIME WORK/ WELDING/ NITE WET
TAP".
ITEM
DESCRIPTION
APPRO%.
QUANTITY
UNIT
UNIT PRICE
TOTAL
CO #2 'ATTACHMENT 'B'
1
LABOR
1
1 F.MAN
4
HR
73.94
295.76
1
1 OPER. ENG. 8
4
HR
76.02
304.08
1
1 LAB. 1
4
HR
53.15
212.60
2
1 LAB. 4
8
HR
55.42
443.36
SUBTOTAL: SUBCONTRACTOR
1
LS
1255.80
TOTAL:SUBCONTRACTOR MARKUP
20.00%
251.16
TOTAL: LABOR
1
LS
1506.96
2
EQUIPMENT
1
CREW TRUCK
4
HR
27.43
109.72
1
JD 710J BACKHOE
4
HR
60.07
240.28
1
CAT 256 SKIDSTEER LOADER
4
HR
22.08
88.32
1
TRAFFIC CONTROL
4
HR
10.00
40.00
2
LITE TOWERS
8
HR
25.00
200.00
SUBTOTAL: SUBCONTRACTOR
1
LS
678.32
TOTAL:SUBCONTRACTOR MARKUP
15.00%
101.75
TOTAL: EQUIPMENT
1
LS
780.07
3
MATERIALS
FLANGES
2
EA
145.00
290.00
BUTT STRAP
1
EA
290.00
290.00
NBG
2
EA
85.00
170.00
VALVE EXCHANGE
1
EA
125.00
125.00
SUBTOTAL: SUBCONTRACTOR
1
LS
875.00
TOTAL:SUBCONTRACTOR MARKUP
15.00%
131.25
TOTAL: MATERIALS
1
LS
1006.25
3
SUBCONTRACTORS(SECOND TIER)
WELD
8
HR
105.00
840.00
HOT TAP EXTRA 710-250 (EXTRA TRIP)
1
EA
260.00
260.00
SUBTOTAL: SUBCONTRACTOR
1
LS
1100.00
TOTAL: SUBCONTRACTORS(SECOND TIER)
5.00%
55.00
TOTAL:
1
LS
1155.00
TOTAL: SOUTHWEST CIVIL PROPOSAL
4448.28
CONDITIONS:
1.Does not include permits, bonds. any form of engineenng(slaking, testing, inspection, etc.), base under concrete, redwood headers, striping, traffic control, or utility adjustment unless Otherwise specified.
2. Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent atter 30 days, and they are subject to the maximum finance charge allowable by law,
3. Work to be done in accordance with plans, specifications, and quantifies Identified above. Koch -Armstrong General Engineering. Inc. shall be notified in writing prior to any proposed changes.
4 Subgrede to be taken from +4 .10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified.
5. Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits, etc. shall be deemed cause for additional charges.
6. Required California Preliminary Lien information (California Civil Code Section 3097/3098) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins.
7. Subject to Credit Approval and verification Of California Preliminary Lien information.
8. Class 2 material if included is 314^ recycled Class 2 per Coltrane Standard Specification Section 28 unless otherwise noted.
Acceptance:
Please sign and return one copy -this quotation constitutes the
sole and only agreement Any prior agreements, negotiations.
etc., not set forth herein are of no face or effect.
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
Firm: NATIONAL CITY STREET RESURFACING FY 06-07
By:
By:
Date FRANK HERRERA
Date
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone • 619-336-4229 fax
April 6, 2010
Mr. Monty Koch
President
Koch -Armstrong General Engineering, inc.
P.O. Box 1190
Lakeside, CA 92040
Dear Mr. Koch,
On March 10, 2010, Change Order #2 to contract was entered between the City
of National City and Koch -Armstrong General Engineering, Inc.
We are enclosing for your records a fully executed original change order.
Michael R. Dalla, CMC
City Clerk
Enclosure
cc: Engineering Dept.