HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #6 Marina Gateway Streetscape, FY 09-10»- OAt,1FQ7J4LA NATI Ty �NCORPO$AT.4 7 CHANGE ORDER #6 April 6, 2010 Project: Marina Gateway Streetscape Specification #08-16 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract This change in contract is for the abandonment of a 5' x 3.5' x 5' septic tank. This change in contract includes the potholing and excavation to expose the septic tank limits; the demolition, hauling, and disposal of the lid/cover of septic tank; the vacuuming of septic tank contents; and backfill and compaction of soil to location of tank. Justification for Change in Contract This change in contract is necessary because the location and required abandonment of the septic tank was unforeseen and unknown at the time of the original contract. The septic tank must be abandoned in order for the contractor to continue the removal and replacement of the sidewalk as provided in the original contract. Cost Reconciliation See Attachments "A & B. Construction Contract Accounting Summary Original Contract Amount: Net change by previously authorized Change Orders: Contract amount prior to this Change Order: Amount of this change order: New contract amount: Original contract time (calendar days): Previously approved additional working days: Additional working days for this change order: Total contract time (working days): (see Weekly Statement of Working Days for completion date) 120 0 7 127 1,916, 282.35 60,789.06 1,977,071.41 934.95 $ 1,978,006.36 Revi-wed by: Recommended for approval by: ivil Engineer D.te Agreed to and Accepted by: Koch Armstrong C/—tjo Date cc: Contractor, Construction File, Project Manager, City Clerk City Engineer ate Approved b Ci M age 7 Da e 'req� Ord s at or exceeding $25,000.00/1 1243 National City Boulevard National City , CA 91950 Tel (619) 336-4380 Fax (619) 336-4397 CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "A" CO #6 Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "8" CO #6 ITEM DESCRIPTION QUANTITY/ h UNIT UNIT PRICE RUNNING TOTAL TOTAL 1 Labor Foreman 1.5 HR 72.00 108.00 Operator 1.5 HR 70.00 105.00 Laborer 1 1.5 HR 52.00 78.00 Item#1 Sub -total: 291.00 Mark-up Cost 20.00% 58.20 Item #1 Cost: 349.20 2 Equipment/Rental Bobcat 0.75 HR 25.00 18.75 Bobcat w! breaker 0.5 HR 50.00 25.00 Cat 936 Lader 0.25 HR 35.00 8.75 Crew Truck - no charge to owner 2 HR 25.00 10 Wheeler - no charge to owner 1 HR 88.00 Item #2 Sub -total: 52.50 Mark-up Cost: 15.00% 7.88 Item #2 Cost: 60.38 3 Materials 3/4 Crushed Rock 6 TN 16.31 97.88 Dump Fees - no charge to owner 1 EA 50.00 Item #3 Sub -total: 97.88 Mark-up Cost: 15.00% 14.68 Item #3 Cost 112.56 4 Subcontractor 1 LS 380.00 380.00 Item #4 Sub -total: 380.00 Mark-up Cost: 5.00% 19.00 Item #4 Cost: 399.00 SUBTOTAL: 921.14 Bond: 1.50% 13.82 CHANGE ORDER PROPOSAL TOTAL 1 LS 934.95 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax April 22, 2010 Mr. Monty Koch President Koch -Armstrong General Engineering, Inc. P.O. Box 1190 Lakeside, CA 92040 Dear Mr. Koch, On April 6, 2010, Change Order #6 to contract was executed between the City of National City and Koch -Armstrong General Engineering, Inc. We are enclosing for your records fully executed original change order. Sincerely, Esther Clemente Deputy City Clerk Enclosure cc: Engineering Dept.