HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #9 Street Resurfacing Project FY 09-10P? Llvid`L ENGINEERING DEPT. CORPORATTO) — CHANGE ORDER #9 February 25, 2010 2010 MAR - 9 P 3: 01 Project: Street Resurfacing Project, FY 09-10 Specification #09-09 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract See Attachment "A". Justification for Change in Contract This change in contract is for the purchase and installation of a "No Pedestrian Crossing" sign, the purchase and installation of a WII-2 sign and barricade, and the striping of one high intensity crosswalk at the interection of 16th Street and G Avenue. The installation of these signs is necessary because a cross -walk contemplated in the original contract is no longer necessary and the signs are needed to inform citizens of the proper place to cross the street. The City Traffic Engineer is requiring a change in the crosswalk layout from a two-line crosswalk (old) to a new zebra strip crosswalk which requires significantly more thermoplastic material. These new crosswalks are more visable. A credit for the unperformed work to replace the cross -walk is included in this change order. The work for this change in contract will be performed by Statewide Stripes, a contractor who is experienced with and qualified to perform such work. The work for this change in contract is of the same type and character as the work in the original contract. The lump sum price for this change in contract is in line with the unit prices found in the original contract. Cost Reconciliation See Attachments "A & B". Construction Contract Accounting Summary Original Contract Amount: 1,272,720.00 Net change by previously authorized Change Orders: 529,315.51 Contract amount prior to this Change Order: 1,802,035.51 Amount of this change order: 2,126.00 New contract amount: Original contract time (calendar days): 80 Previously approved additional working days: 35 Additional working days for this change order: 0 Total contract time (working days): (see Weekly Statement of Contract Time for completion date) Reviewed by: rincipa Civil Engineer Agreed to and Accepted by: Dat 03/05/10 Koch strong Date General Engineering, Inc. cc: Contractor, Construction File, Project Manager, City Clerk 115 $ 1,804,161.51 Recommended for ap o al by: 1243 National City Boulevard National City , CA 91950 Tel (619) 336-4380 Fax (619) 336-4397 CITY OF NATIONAL CITY Resurfacing 09-10 Specification No. 09-09 ATTACHMENT "A" CO #9 Description of Change in the Contract This change in contract is for the purchase and installation of a "No Pedestrian Crossing" sign, the purchase and installation of a WII-2 sign and barricade, and the striping of one high intensity crosswalk at the interection of 16th Street and G Avenue. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. CITY OF NATIONAL CITY Resurfacing 09-10 Specification No. 09-09 ATTACHMENT "B" CO #9 ITEM DESCRIPTION QUANTITY/ UNIT UNIT PRICE TOTAL 1 16th Street Striping and Signs Pedestrian Barricade/Sign Pedestrian Sign 1.00 1.00 EA EA 200.00 150.00 200.00 150.00 Striping high intensity crosswalk Traffic Control 1.00 1.00 LS LS 1,125.00 900.00 1,125.00 900.00 Delete Cross -walk (CREDIT) 1.00 LS (380.16) (380.16) Sub -total: LS 1,994.84 Mark-up: 5% 99.74 Bond Cost 1.5% 31.42 Item #1 Cost: 2,126.00 CHANGE ORDER PROPOSAL TOTAL 1 LS 2,126.00 KOCH-ARMSTRONG GENERAL ENGINEERING, INC. �-- P.O. BOX 1190, LAKESIDE, CA 92040-0906 FAX: (619) 561-0317 - :OM ;V:1 ,{,711;WSW LICENSE 194819-A WSW QUOTATION 10-014 COP-16 PAGE 1 OF 1 TO: DATE: We propose This quotation NATIONAL CITY STREET RESURFACING FY 06-07 1243 NATIONAL CITY BLVD. NATIONAL CITY , CA. 91950 ATTN: TEL: CELL: FAX EMAIL: conditions BYRON WADE (619) 336-4380 _ (619) 336 4397----------- — --- - _ 3/11/10 byronwadel@mac.com to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and stated. expires 30 dayfrom the date above and is good for work completed within one year of date above unless otherwise noted. JOB LOCATION IDENTIFIED 16th STREET AND'G' AVENUE CROSSWALKS "NATIONAL CITY STREET RFESURFACING FY' 09-10". COP #16: 16th STREET STRIPING AND SIGNS. ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT PRICE TOTAL 1 STATEWIDE STRIPES: 16th STREET STRIPING AND SIGNS. 1 LS 1.1 PEDESTRIAN BARRICADE (Caltrans) WITH DOUBLEARROWS. 1 EA 1.2 PEDESTRIAN SIGN 1 EA 1.3 DELETE TWO STANDARD CROSWALKS AND INSTALL ONE HIGH INTENSITY CROSSWALK. 1 EA STATEWIDE QUOTE 1 LS 1994.84 KOCH-ARMSTRONG'S MARK-UP 5% 99.74 SUBTOTAL 2094.58 BOND COST 1.50% 31.42 TOTAL CHANGE ORDER PROPOSAL 1 LS 2126.00 TERMS: 1 INCLUDES: ONE MOVE IN,PREVAILING WAGE RATES, BOND COST, ITEMS LISTED PER E-MAtLED SKETCH(ONE EACH) RECEIVED FROM BYRON WADE ON FEBRUARY 1, 2010 AT 9:49 A.M AND ATTACHED TO THIS EMAILED QUOTE. 2 EXCLUDES. NIGHT/ WEEKEND/ HOLIDAY WORK DAYS, ANY WORK/LABOR/ MATERIALS OR ITEM NOT SPECIFICALLY STATED IN QUOTE. CONDITIONS: I.Does not include permits. bonds, any form of engineering(staking. testing, inspection, etc.). base under concrete, redwood headers, striping traffic control, er utility adjustment unless otherwise specified. 2 Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent after 30 days, and they are subled to the maximum finance charge allowable by law. 3 Work to be done in accordance with plans, specifications, and quantities identified above. Koch Armstrong General Engineering, Inc. shall be notified in writing prior to any proposed changes. 4 Subgrade to be taken from at- .10'to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified. 5. Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits, etc shall be deemed cause for additional charges. 6 Required California Preliminary Lien information (California Civil Code Section 3097/3098) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins. 7. Subject to Credit Approval and verification of Califomia Preliminary Lien information 8_ Class 2 matenal if included is 3',4" recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted. Acceptance: Please sign and return one copy -this quotation constitutes the sole and only agreement. Any pnor agreements, negotiations, etc.. not set fern herein are of no force or effect Firm: NATIONAL CITY STREET RESURFACING FY 06-07 By: By: KOCH-ARMSTRONG GENERAL ENGINEERING, INC. Date FRANK HERRERA Date