HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #11 Street Resurfacing Project FY 09-10CALIFORNIA X^ NATlO .L CIT ENGINEERING DEPT. INCOAPDAOW) CHANGE ORDER #11 March 21, 2010 2010 MAR 29 A 9: 55 Project: Street Resurfacing Project, FY 09-10 Specification #09-09 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract This change in contract extends line items for the the following items of work at the intersection of 18th Street and Palm Avenue: mobilization, removal and replacement of approximately 660 square feet of cross -gutter, removal and replacement of approximately 77 lineal feet of curb and gutter, removal and replacement of 2 traffic loops, removal and replacement of approximately 384 tons of A/C (dig -outs), adjustment of 2 sewer manholes to grade, re -striping, and installation of street traffic markers. Justification for Change in Contract The work for this change in contract was not included in the original contract because, although contemplated at the time of the original contract, it did not appear that this work could be completed under the original budget. After completing work for this project, a project budget surplus remained. Given the low bid prices for this project compared to previous City resurfacing projects and similar resurfacing projects in San Diego County, it is likely to be advantageous for the City to complete this work at these unit prices. The work for this change in contract is of the same type and character as the original contract. The work for this change in contract will be performed by Koch -Armstrong, a contractor qualified and competent to perform such work. Cost Reconciliation See Attachments "A & B". Construction Contract Accounting Summary Original Contract Amount: Net change by previously authorized Change Orders: Contract amount prior to this Change Order: Amount of this change order: New contract amount: Original contract time (calendar days): Previously approved additional working days: Additional working days for this change order: Total contract time (working days): (see Weekly .Statement of Contract Time for completion date) Reviewed by: •rinci al Civil En in r D e Agreed to and Accepted by: 80 35 0 115 1,272,720.00 533,200.48 1,805,920.48 57,662.90 $ 1,863,583.38 Recommended for y.proval by: Pro's ana. -r Date Ap:roved by: March 25, 2010 /'J J- ,.2,. Koc strong Date Date General Engineering, Inc. s cc: Contractor, Construction File, Project Manager, City Clerk 1243 National City Boulevard National City , CA 91950 Tel (619) 336-4360 Fax (619) 336-4397 CITY OF NATIONAL CITY Resurfacing 09-10 Specification No. 09-09 ATTACHMENT "A" CO #11 Cost Reconciliation This change In contract will not result in any additional costs to the City pursuant to this change order. This change in contract only authorizes the extension of line items found in the original contract in an amount within the original project budget. CITY OF NATIONAL CITY Resurfacing 09-10 Specification No. 09-09 ATTACHMENT "B" CO #11 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 1 Mobilization (per Line Item 1) 1.00 LS 1,551.90 1,551.90 2 R&R AC 2"-6" Depth (per Line Item 5) 384.00 TON 95.00 36,480.00 At 18th Street and Palm Avenue 3 R&R Unsiutable Subgrade with CAB Fabric Iper Line Item 6) 25.00 TON 40.00 1,000.00 At 18th Street and Palm Avenue 4 R&R Curb and Gutter (per Line Item 9) 77.00 LF 44.00 3,388.00 At 18th Street and Palm Avenue - 5 R&R Cross Gutter (per Line Item 12) 660.00 SF 20.50 13,530.00 At 18th Street and Palm Avenue - 6 Adjust Sewer Manhold to Grade (per Line Item 14) 2.00 EA 200.00 400.00 7 Replace Traffic Loops (per Line Item 16) 2.00 LS 206.00 412.00 8 Street Traffic Markers (Per Line Item 17) 1.00 LS 901.00 901.00 CHANGE ORDER PROPOSAL TOTAL 1 LS 57,662.90 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Della, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax May 5, 2010 Mr. Monty Koch President Koch -Armstrong General Engineering, Inc. P.O. Box 1190 Lakeside, CA 92040 Dear Mr. Koch, On March 21, 2010, Change Order #11 to contract was executed between the City of National City and Koch -Armstrong General Engineering, Inc. We are enclosing for your records fully executed original change order. Michael R. Dalla, CMC City Clerk Enclosure cc: Engineering Dept.