CHANGE ORDER #9
April 13, 2010
Project: Marina Gateway Streetscape Specification #08-16
Contractor: Koch -Armstrong
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
This change in contract is for repair of a damaged electrical service conduit on the east side of 23rd Street
between Harrison Avenue and Cleveland Avenue.
Justification for Change in Contract
This change in contract is necessary because the vertical alignment of the sewer main was lowered in this
area to increase and improve the flow characteristics of the main. In the previous 20B electrical conversion
some of the conduits crossing the sewer main went below the the main. The new sewer main location is into
the electrical conduits. This requires the electical conduits to be lowered as well. This change order pays for
the removal and replacement of the conduits in existing slurry to be relocated below the new sewer main
Cost Reconciliation
See Attachments "A & 8".
Construction Contract Accounting Summary
Original Contract Amount: 1,916,282.35
Net change by previously authorized Change Orders: (28,694.45)
Contract amount prior to this Change Order: 1,887,587.90
Amount of this change order: 6,106.56
New contract amount:
Original contract time (calendar days):
Previously approved additional working days:
Additional working days for this change order:
Total contract time (working days):
(see Weekly Statement of Working Days for completion date)
Reviewed by:
Date
Agreeto and Accepted by:
ogfj strong
General. Engineering, Inc.
cc: Contractor, Construction File, Project Manager, City Clerk
120
0
7
127
$ 1,893,694.46
Recommended for approval by:
Approved by:
City Manager Date
'required for Change Orders at or exceeding 525,000.00
Tel (619) 336-4380
Fax (619) 336-4397
1243 National City Boulevard
National City , CA 91950
CITY OF NATIONAL CITY
Marina Gateway Streetscape
Specification No. 08-16
ATTACHMENT "A" CO #9
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and the
Contractor and represents the entire agreement for the work described herein and includes all costs
associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance,
bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby
incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work
as provided by the City.
CITY OF NATIONAL CITY
Marina Gateway Streetscape
Specification No. 08-16
ATTACHMENT "B"
CO #9
ITEM
DESCRIPTION
QUANTITY/
UNIT
UNIT
PRICE
RUNNING TOTAL
TOTAL
1
Labor
Foreman
16
HR
72.00
1,152.00
Operator
16
HR
70.00
1,120.00
Laborer 1
16
HR
52.00
832.00
Item #1 Sub -total:
3,104.00
Mark-up Cost:
20.00%
620.80
Item #1 Cost:
3,724.80
2
Equipment/Rental
Bobcat
2
HR
25.00
50.00
Crew Truck
16
HR
25.00
400.00
Case CX80 Excavator
4
HR
50.00
200.00
10 Wheeler
2
HR
88.00
176.00
Item #2 Sub -total:
826.00
Mark-up Cost:
15.00%
123.90
Item #2 Cost:
949.90
3
Materials
Dump Fees
1
EA
75.00
75.00
4" x 10 LF Conduit
2
EA
47.85
95.70
4' Couplings
4
EA
5.98
23.93
PCC Material
9
CY
108.00
972.00
Item #3 Sub -total:
1,166.63
Mark-up Cost:
15.00%
174.99
Item #3 Cost:
1,341.62
SUBTOTAL:
6,016.32
Bond:
1.50%
90.24
CHANGE ORDER PROPOSAL TOTAL
1
LS
6,106.56
CALIFORNIA -p
NATIONAL Orr
o re
IRCOSPOR /1TYSD
MARINA GATEWAY STREETSCAPE
Specification #08-16
Contractor: Koch -Armstrong General Engineering, Inc.
i
j Reason/Purpose for this Change Order:
During the design phase of this project the Engineer used Cemet Treated Base (CTB) in the street section as a
precaution against oversaturation of the base due to the pervious paving being used on the project. CTB is a
rigid base materials that can withstand water infiltration. As a result of a design change to add a 12" deep
concrete curb around the pervious paving the Engineer determined that the use of CTB is no longer warranted.
CTB can now be substituted for the less expensive Crushed Miscellaneous Base (CMB) and still be within
design criteria. This will represent a significant cost savings to the project.
CHANGE ORDER No. 10
May 25, 2010
I The City of National City and Contractor agree to the following change to the original Contract:
lContractor shall replace Cement Treated Base with Crushed Miscellaneous Base for each line item that calls for
lCTB as the base material, including but not limited to Line Items #19 and #20.
Original Contract Amount $ 1,916,282.35
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 1,880,446.00
(22, 587.89)
1,893,694.46
(13,248.46)
Working days added: 0
Submit/,ed by:
Working days subtracted: 0
.......................................
ager Date
P/3/.1.o
Ity Engine- Da e City Manager, required for Charge Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents
are incorporated herein.
[Accepted and agreed to by Koch -Armstrong:
Monty Koch/President Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephhone (619) 336-4380
KOCH-ARMSTRONG GENERAL ENGINEERING,
INC.
/-- P.O. BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317
401.•-,,,,"ir -0, LICENSE194619-A
-___ � CREDIT TO OWNER - COP-16
REPLACE CTB WITH CMB
PAGE 1 OF 1
TO: NATIONAL CITY
1243 NATIONAL CITY BLVD.
NATIONAL CITY, CA. 91950
ATTN: BYRON WADE
TEL: (619) 336-4380
CELL
FAX: (619) 336 4397
EMAIL: byronwadelllmao.com
DATE: 5/19/10
conditions stated.
We to furnish all labor, material. and equipment necessary to perform the following items of work subiect to terms and
propose
This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted.
JOB LOCATION
IDENTIFIED
NEW ASPHALT ROADS WITH CTB
MARINA GATEWAY COP-16: CREDIT TO OWNER TO REPLACE CTB UNDER NEW ASPHALT WITH CMB
ITEM
DESCRIPTION
Q�l1AN�TIN
UNIT
UNIT PRICE
TOTAL
1
CREDIT: REPLACE CTB WITH CMB.
1248
TON
10.62
$
13,248.46
CONDITIONS:
1.Does not include permits, bonds, any form of engineering(slaking, testing, inspection, etc.), base under concrete, redwood headers, stnping, tic control, or utility adjustment unless otherwise specified.
2. Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent after 30 days, and they are subject to the maximum finance charge allowable by law.
3. Work to be one in accordance with plans, specifications, and quantities identified above. Koch -Armstrong Geneal Engineering, Inc. shall be notified in writing prior to any proposed changes.
4 Subgrade to be taken from *\- .10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified.
5. Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits, etc. shall be deemed cause for additional charges.
6 Required California Preliminary Lien information (California Civil Code Section 3397/3096) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins.
7. Subject to Credit Approval and verification of California Preliminary Lien information.
8. Class 2 material if included is 3\4" recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted.
Acceptance:
Firm: NATIONAL CITY
By:
Please sign and return one copy -this quotation constitutes the sole
and only agreement. Any prior agreements, negotiations, etc., not
set forth herein are of no force or effect.
By:
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
Date
Date FRANK HERRERA
T-337 P.001/002 F-314
MAR-29-2010 02:00PM FROM-
P � �- E Qu
Quotation
Attn: Frank 619-561-0317
Koch -Armstrong General Eng
PO Box 1190
Lakeside, CA 92040
Acct #: 0044300
Data: Monday, March 29, 2010
Quote Created: Monday. March 29, 2010
Quote it: 1-PBN23M
Quote Name: 736-7906
Effective From: Wednesday, August 25.2009
Version il: 2
w
aVyU
Project
Sales Rep_
UUILI:111111
Vormi. Gonipsany
Marina Gatewy Streetscape
23rd /Harrison / McKinley
Cleveland
National City, CA 13091G3
Mary French
COPY
frenchm@vmcmail.com
(058)530-94.70
Quote Expiration: Wednesday, Septemuer 23, 2009
Price Expiration- Friday July 30, 2010
Special Instructions: REVISED QUOTE
Sales tax not inclueed ? RE +tx/ 203202CD @ 533.00 +a
Davis -Rustic 8rw for 202502CD @ 530.251yd
Davis -Dune for 202502CD @ $7.601yd +tx (203202CD a $6.251yd +Ix
Davis-Silversmoke for 202502CD @ 93.80/yd +tx / 203202CD 54.201yd +tx
Asphalt
Plant
Mission Valley ASPh.
Mission Valtey Asph.
Mission Valley Aso.
Read' ]Vlix
Plant
Mission Valley RMC
Mission Valley RMC
Mission Valley RMC
Sand &Gravel
Plant
Carroll Canyon Agg.
Carron Canyon Agg.
Mission Valley Agg
Mission Valley Agg.
Product Name Product
400 3B2 64-1 D RAP B2Y
400 3C2 64-10 RAP 85F
400 3D 64-10 RAP B7X
Product Name Product
495702-PERVIOUS 2HO
520C2500 4-LINE 2PU
565C3250P 4"LINE 2PX
Product Name Product
FILL SAND 30 ABD
FILL SAND 15 ABV
3/4' CL 2 BASE A13
3/4- CRUSHED A2X
Qty.
Truck TYPO:
1,250
Truck Type.
Truck Type:
F.O.B.
U!M Plant
TONS $56.00
WED -End Dump
TONS 556.00
WED -End Dump
TONS $60.00
WED -End Dump
F.O.B.
Qty, U!M Plant
225 CBYDS $98.45
50 CBYDS $96.10
CBYDS $98.45
F.O.B.
Qty. UIM Plant
500 TONS $12.00
Truck Typo: WED -End Dump
525 TONS $1.00
Truck Type: WED -End Dump
1,300 TONS $9.00
Truck Typo: WED -End Dump
500 TONS 511.00
Truck Type: WED -End Dump
Additional Chat^as-Asphalt
Environmental Foe is at $1.00\LOAD +tax
Standing Time is at Si.501MINUTES @ 1 hourlload unloading time
Additional Charges - Ready Mix
Environmental Fee is at $15.00\LOAD + tax 4 min! d +tx
Time Is at $1251MINUTES Unloading time @ Y
Additio al Char es - Sand & Gravel
Environmental Fee is at $1.001LOAD +lax
hourtload unloading time
Standing Time is at S1.501MINUTES @
Quotation generated on 3129/2010
Haul Rate
$6.25
$6.26
$6,26
Haul Rate
50.00
5o.00
$0.00
Haul Rate
$5.48
$5.48
$4.36
$4.36
Delivered
$62.26
562.26
$66.26
Delivered
$98.45
S96.10
$98.45
Delivered
$17.46
$6.48
$13.36
$15.36
*Attn: Frank 619-561-0317
Koch - Armstrong General Eng
PO Box 1190
Lakeside, CA 92040
Acct #: 0044300
Date:
Quote Created:
Quote #:
Quote Name:
Effective From:
Version #:
Friday, October 02, 2009
Friday, August 21, 2009
1-PBN23M
736-7906
Wednesday, August 26, 2009
VulcEarl
Materials Company
Project: Marina atewy Streetscape
23rd ',Harrison / McKinley
Cleveland
National City, CA 1309/G3
Sales Rep:
Mary French
frenchm@vmcmail.cam
(858)530-9470
Quote Expiration: Wednesday, September 23, 2009
Price Expiration: Wednesday, March 31, 2010 - S u s
Special Instructions:
Sales tax not included
Davis -Rustic Brw for 202502CD @ $30.25/yd +tx/ 203202CD @ $33.00 +tx
Davis -Dune for 202502CD @ $7.60/yd +tx / 203202CD @ $8.251yd +tx
Davis-Silversmoke for 202502CD @ $3.80/yd +tx / 203202CD $4.20/yd +tx
Asphalt
Plant
Mission Valley Asph.
Mission Valley Asph.
.Mission Valley Asph.
Ready Mix
Plant
Mission Valley RMC
Mission Valley RMC
Mission Valley RMC
Sand & Gravel
Plant
Carroll Canyon Agg.
Carroll Canyon Agg.
Mission Valley Agg.
Mission Valley Agg.
Product Name Product
400 362 64-10 RAP B2Y
400 3C2 64-10 RAP B5F
400 3D 64-10 RAP B7X
Product Name Product
496702-PERVIOUS 2HQ
520C2500 4"LINE 2PU
565C3250P 4"LINE 2PX
Product Name Product
CTB-2.2% A1F
ABV
A21
FILL SAND 15
3/4" CRUSHED
FILL SAND 30
Qty.
Truck Type:
1, 250`
Truck.Type: .
Tru Ek Type:
1
Qty.
225
50
Qty.
1,300
Truck Type:
525
Truck Type:
500
Truck Type:
500
Truck Type;
F.O.B.
U/M Plant.
TONS $56.00
WED -End Dump
TONS $56.00
WED -End Dump
TONS $60.00
WED -End Dump
F.O.B.
U!M_.. Plant
CBYDS $98.45
CBYDS $96.10
CBYDS $98.45
F.O.B.
U/M Plant
TONS $17.50
WED -End Dump
TONS $1.00
WED -End Dump
TONS $11.00
WED -End Dump
TONS $12.00
WED -End Dump
Additional Charges -Asphalt
Environmental Fee is at $1.0 LOAD +tax
Standing Time is at $1.50\MIUTES @ 1 hour/load unloading time,
Additional Charges - eadv Mix
Environmental Fee is at $1 .001LOAD + tax
Standing Time is at $1.25INUTES Unloading time @ 4 min/yd +tx
Additional Char es Sand & Gravel
Environmental Fee is at 1.001LOAD +tax
Standing Time is at $1. \MINUTES @ 1 hour/load unloading time
Quotation generated on 10/2/2009
COPY
Haul Rate
$6.26
$6.26
$6.26
Haul Rate
S0.00
$0.00
$0.00
Haul Rate
$5.48
$5.48
$4.36
$4.36
Delivered
$62.26
$62.26
$66.26
Delivered
$98.45
$96.10
$98.45
Delivered
$22.98
$6.48
$15.36
$16.36
+- CALIFORNIA —0-
NATIONAL CITY
INCOAPQRATED
MARINA GATEWAY STREETSCAPE
Specification #08-16
Contractor: Koch -Armstrong General Engineering, Inc.
Reason/Purpose for this Change Order
Change Order #7 deleted the synthetic boardwalk from the project. Line item #20 calls for a boardwalk cross-
over on Harrison. The synthetic board element of the cross -over (which allows for the drainage between the
ped-ramp and the sidewalk) should now be concrete to match the sidewalk areas.
CHANGE ORDER No. 11
May 28, 2010
The City of National City and Contractor agree to the following change to the original Contract:
Contractor shall substitute the synthetic board element of the cross -over with concrete that matces the sidewalk
in color and finish per the design provided by Rick Engineering. This is a no cost Change Order.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 1,880,446.00
$ 1,916,282.35
(35,836.35)
1,880,446.00
Working days added: 0 Working days subtracted: 0
Submitted by:
s
alter
Ci Engin
5'ZQ� ' /0
Date
(.fvbJID
Date City Manager, required for Change Orders>$24,999 Date
ect Mana
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents
are incorporated herein.
Accepted and agreed to by Koch —Armstrong:
. .5 /Z g •-4? ,t` Sy'2 8—/C `J
,Monty Koch/President Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephhone (619) 336-4380
ccr)p A (a
8 r -M N\ 7..AA .-- ri A-
Q 10' CONCRETE CROSSOVER
DpvJa .- iiuro En1C1 Gvl d
t�r.J ,,der-i4/satJ^4-i4 pan
C DN3'i' 1 r+..9 t 1D5 9 fl
COL ,.la, N.Y
24" LONG R4 BARS
PER CONTACT JOINT SDRSO G-
3 - *4 BARS (TIE TOO)
m4 BARS * 6" C.C. (TIE TO
CONCRETE PAVING
(SEE PLANS)
06 COMPACT SUBGRADE yr) 95%
10 {?� EXPANSION JOINT
(PER SORSA JOINT DETAILS)
0)
NIavie bc'te*vru
JZ$6I (R (
V 15/2olo
5-`v'!<t5f 1-8
se+' 1-' t 4 ,r on) 2stcles
D,Aru n, po-r It. 1,
10' WMOE CONCRETE CROSSOVER
NOT TO SCALE"
NOTE: THIS CROSSOVER* TO REPLACE THE BOAR0WALI{ CROSSOVER. SAME LOCATION AND ELEVATIONS.
b\ ,sobs m r.oi._raie.men•dT a+«a.cxnaN.•
\1Mr.siMV d.1QrNIm.2W6bNN.9�- fib'
. ONlo W aGYLSi4..1«S.W.FM•
«— CALIFORNIA —»
NATIONAL I y
INCORPORATRD
MARINA GATEWAY STREETSCAPE
Specification #08-16
Contractor: Koch -Armstrong General Engineering, Inc.
Reason/Purpose for this Change Order:
'The original plans show the aphalt concrete to remain that exists between the rails on Harrison and over the
railroad ties. This AC is old and in disrepair. Due to savings in other areas of the project, it is now feasable to
;repair this AC at this time. Waiting to repair this AC after the project is complete would cause damage to the
-new AC on Harrison that is being installed on this project.
CHANGE ORDER No. 12
May 28, 2010
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor shall remove and dispose of all existing AC on Harrison between the railroad rails and over the
ties and install new full depth AC (6") in kind to match the rest of the project. This change represents
approximately 1,292 square feet of AC removal and replacement. The unit price for all the removal, disposal
and placement of new AC shall be $7.15 per square foot.
Original Contract Amount. $ 1,916,282.35
Net change by previously authorized Change Orders... (35,836.35)
Subtotal
Amount of this change order
1,880,446.00
9,237.80
New contract amount ... $ 1,889,683.80
Working days added: 0 Working days subtracted: 0
Submitted by:
uatCity Managers required for Change Orders>$24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents
are incorporated herein.
Accepted and agreed to by Koch Armstrong,
Monty Koch/President Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephhone (619) 336-4380
CALIFOR NIA
,^
-:- -INCORPORPTEO .-�
MARINA GATEWAY STREETSCAPE
Specification #08-16
Contractor: Koch -Armstrong General Engineering, Inc.
CHANGE ORDER No. 12
May 28, 2010
Reason/Purpose for this Change Order.
The original plans show the aphalt concrete to remain that exists between the rails on Harrison and over the
railroad ties. This AC is old and in disrepair. Due to savings in other areas of the project, it is now feasable to
repair this AC at this time. Waiting to repair this AC after the project is complete would cause damage to the
new AC on Harrison that is being installed on this project.
The City of National City and Contractor agree to the following change to the original Contract:
'The Contractor shall remove and dispose of all existing AC on Harrison between the railroad rails and over the
(ties and install new full depth AC (6") in kind to match the rest of the project. This change represents
approximately 1,292 square feet of AC removal and replacement. The unit price for all the removal. disposa
;and placement of new AC shall be $7.15 pe- square foot.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0 Working days subtracted: 0
Submitted by:
[Project Manager
$ 1,916,282.35
(35,836.35)
1,880,446.00
9,237.80
S
1,889,683.80
Date ICity Project Manager
Date
Approved by:
City Engineer Date City Manager, required for Charge Orders>S24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, Terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents
are incorporated herein.
Accepted and agreed to by Koch -Armstrong:
June 1, 2010
Frank errera, Project Manager
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380
KOCH-ARMSTRONG GENERAL ENGINEERING,
INC.
P.O. BOX 1190, LAKESIDE, CA 92040-0906
\ TEL. (619) 561-2005 FAX: 561-0317
ROCH•ARMSTRONG 19 8199)
LICENSE-A
QUOTATION
10-032.5 COP-12
PAGE 1 OF 1(REVISED 5-28-10 )
CO 12
TO: NATIONAL CITY ATTN: BYRON WADE
1243 NATIONAL CITY BLVD. TEL', (619) 336-4380
NATIONAL CITY , CA. 91950 CELL:
FAX: (819) 336 4397
DATE: 6/1/2010 EMAIL: byronwadel@mac.com
We propose to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated.
AS MILL & PAVE.
This Quotation expires 30 days from the dale above and is good for work completed within one year of date above unless otherwise noted.
JOB LOCATION SHEET 10101-D RAIL ROAD TRACKS ON HARRISON AVENUE, SOUTH OF 23rd St. (SEE RFI #38 FOR MORE INFO.)
IDENTIFIED MARINA GATEWAY COP-12: REMOVE & REPLACE FAILED/CRUMBLED/SEPERATED 6" ASPHALT SHOWN ON SHEET 10101-D
ITEM
DESCRIPTION
APPRO%.
QUANTITY
UNIT
UNIT PRICE
TOTAL
1
REMOVE AND REPLACE 152LF x 6" FAILED/ CRUMBLED AC, 3' ON EACH SIDE & 5' BETWEEN RAILS.
1292
SF
1.1
DEMO., HAUL & DISPOSE OF 2" AC. EXCAVATE & SPREAD 4" SOIL ONSITE. GRADE & COMPACT 6" @ 95% .
1292
SF
1.2
6"xl.5' ASPHALT CONCRETE, HAND PAVED OVER RAILROAD TIES & 6"X6"AT OUOTSIDE EAST SIDE TIE.
1292
SF
LABOR
1
FOREMAN OPERATOR
8
HR
72.00
576.00
1
OPERATOR
8
HR
70.00
560.00
1
LABORER
16
HR
54.0D
884.00
SUBTOTAL LABOR
2000.00
MARKUP
20%
400.00
TOTAL LABOR
2400.00
EQUIPMENT & RENTAL
1
BOBCAT W1 BREAKER
1
HR
50.00
50.00
1
BOBCAT
10
HR
25.00
250.00
1
3-5 TON ROLLER
5
HR
25.00
125.00
1
WATER BUFFALO
2
HR
10.00
20.00
1
HR
1
VIBRAPLATE
4
HR
10.00
40.00
1
TACK RIG
4
HR
10.00
40.00
2
CREW TRUCK
12
HR
25.00
300.00
10 WHEELER(S)
12
HR
88.00
1056.00
SUBTOTAL EQUIPMENT & RENTAL
1881.00
MARKUP
15%
282.15
TOTAL EQUIPMENT & RENTAL
2163.15
MATERIAL
DUMP FEES
4
LD
75.00
300.00
TACK OIL
26
GAL
2.72
70.72
AC MATERIAL
54
TN
66.34
3582.23
SUBTOTAL MATERIAL
3952.95
MARKUP
15%
592.94
TOTAL MATERIAL
4545.89
SUB -TOTAL CHANGE ORDER PROPOSAL-12
9109.04
BOND COST
1.50%
136.64
TOTAL CHAN €-OR0E PROPOSAL-11
1
LS
8246,67
TOTAL (REVISION 6) CHANGE ORDER PROPOSAL-11
1,292
SF
7.15
9237.80
CONDITIONS:
1.Does not include permits, bonds. any form o/ engineering(slaking, testing. inspection, etc.), base under concrete. redwood headers, striping, traffic control, or utility adjustment unless otherwise specified.
2. Monthly Progress Payments and Full Payment upon completion. Accounls are delinquent after 30 days. and they are subject to the maximum finance charge allowable by law.
3. Work to be done in accordance wilh plans, specifications, and quantifies identified above. Koch -Armstrong General Engineering, Inc. shall be notified in writing prior to any proposed changes.
4.Subgrade to be taken from +1- .10' to balance and at or below optimum moisture berme Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified.
5. Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits, etc. shall be deemed cause for additional charges.
6. Required California Preliminary Lien information (California Civil Code Section 3097/30901 shall be provided to Koch -Armstrong General Engineering, Inc. before work begins.
7. Subject to Credit Approval and verification of California Preliminary Lien Information.
0. Class 2 maleral if included is 314" recycled Class 2 per Callrans Standard Specification Section 26 unless otherwise noted.
Acceptance:
Please sign and return one copy -this quotation conslilutes the
sole and only agreement Any prior agreements, negotiations,
etc., nol set forth herein are o1 no force or effect.
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
Firm: NATIONAL CITY
By:
By:
Date FRANK HERRERA
Dale
TE
%or
Tt.1(
r.
t
A A)
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone • 619-336-4229 fax
KOCH ARMSTRONG GENERAL ENGINEERING
Change Order Nos. 9,10,11 and 12
Marina Gateway Streetscape, FY 09-10
Judy Hernandez (Engineering) Forwarded
Copies of Change Orders to Contractor