HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #9, #10, #11, #12 Marina Gateway Streetscape, FY 09-10.. 0/04!ORNI,A. N T ON4LCH 1H'coRpoRAT. CHANGE ORDER #9 April 13, 2010 Project: Marina Gateway Streetscape Specification #08-16 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract This change in contract is for repair of a damaged electrical service conduit on the east side of 23rd Street between Harrison Avenue and Cleveland Avenue. Justification for Change in Contract This change in contract is necessary because the vertical alignment of the sewer main was lowered in this area to increase and improve the flow characteristics of the main. In the previous 20B electrical conversion some of the conduits crossing the sewer main went below the the main. The new sewer main location is into the electrical conduits. This requires the electical conduits to be lowered as well. This change order pays for the removal and replacement of the conduits in existing slurry to be relocated below the new sewer main Cost Reconciliation See Attachments "A & 8". Construction Contract Accounting Summary Original Contract Amount: 1,916,282.35 Net change by previously authorized Change Orders: (28,694.45) Contract amount prior to this Change Order: 1,887,587.90 Amount of this change order: 6,106.56 New contract amount: Original contract time (calendar days): Previously approved additional working days: Additional working days for this change order: Total contract time (working days): (see Weekly Statement of Working Days for completion date) Reviewed by: Date Agreeto and Accepted by: ogfj strong General. Engineering, Inc. cc: Contractor, Construction File, Project Manager, City Clerk 120 0 7 127 $ 1,893,694.46 Recommended for approval by: Approved by: City Manager Date 'required for Change Orders at or exceeding 525,000.00 Tel (619) 336-4380 Fax (619) 336-4397 1243 National City Boulevard National City , CA 91950 CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "A" CO #9 Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. CITY OF NATIONAL CITY Marina Gateway Streetscape Specification No. 08-16 ATTACHMENT "B" CO #9 ITEM DESCRIPTION QUANTITY/ UNIT UNIT PRICE RUNNING TOTAL TOTAL 1 Labor Foreman 16 HR 72.00 1,152.00 Operator 16 HR 70.00 1,120.00 Laborer 1 16 HR 52.00 832.00 Item #1 Sub -total: 3,104.00 Mark-up Cost: 20.00% 620.80 Item #1 Cost: 3,724.80 2 Equipment/Rental Bobcat 2 HR 25.00 50.00 Crew Truck 16 HR 25.00 400.00 Case CX80 Excavator 4 HR 50.00 200.00 10 Wheeler 2 HR 88.00 176.00 Item #2 Sub -total: 826.00 Mark-up Cost: 15.00% 123.90 Item #2 Cost: 949.90 3 Materials Dump Fees 1 EA 75.00 75.00 4" x 10 LF Conduit 2 EA 47.85 95.70 4' Couplings 4 EA 5.98 23.93 PCC Material 9 CY 108.00 972.00 Item #3 Sub -total: 1,166.63 Mark-up Cost: 15.00% 174.99 Item #3 Cost: 1,341.62 SUBTOTAL: 6,016.32 Bond: 1.50% 90.24 CHANGE ORDER PROPOSAL TOTAL 1 LS 6,106.56 CALIFORNIA -p NATIONAL Orr o re IRCOSPOR /1TYSD MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. i j Reason/Purpose for this Change Order: During the design phase of this project the Engineer used Cemet Treated Base (CTB) in the street section as a precaution against oversaturation of the base due to the pervious paving being used on the project. CTB is a rigid base materials that can withstand water infiltration. As a result of a design change to add a 12" deep concrete curb around the pervious paving the Engineer determined that the use of CTB is no longer warranted. CTB can now be substituted for the less expensive Crushed Miscellaneous Base (CMB) and still be within design criteria. This will represent a significant cost savings to the project. CHANGE ORDER No. 10 May 25, 2010 I The City of National City and Contractor agree to the following change to the original Contract: lContractor shall replace Cement Treated Base with Crushed Miscellaneous Base for each line item that calls for lCTB as the base material, including but not limited to Line Items #19 and #20. Original Contract Amount $ 1,916,282.35 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 1,880,446.00 (22, 587.89) 1,893,694.46 (13,248.46) Working days added: 0 Submit/,ed by: Working days subtracted: 0 ....................................... ager Date P/3/.1.o Ity Engine- Da e City Manager, required for Charge Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. [Accepted and agreed to by Koch -Armstrong: Monty Koch/President Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 KOCH-ARMSTRONG GENERAL ENGINEERING, INC. /-- P.O. BOX 1190, LAKESIDE, CA 92040-0906 TEL: (619) 561-2005 FAX: (619) 561-0317 401.•-,,,,"ir -0, LICENSE194619-A -___ � CREDIT TO OWNER - COP-16 REPLACE CTB WITH CMB PAGE 1 OF 1 TO: NATIONAL CITY 1243 NATIONAL CITY BLVD. NATIONAL CITY, CA. 91950 ATTN: BYRON WADE TEL: (619) 336-4380 CELL FAX: (619) 336 4397 EMAIL: byronwadelllmao.com DATE: 5/19/10 conditions stated. We to furnish all labor, material. and equipment necessary to perform the following items of work subiect to terms and propose This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted. JOB LOCATION IDENTIFIED NEW ASPHALT ROADS WITH CTB MARINA GATEWAY COP-16: CREDIT TO OWNER TO REPLACE CTB UNDER NEW ASPHALT WITH CMB ITEM DESCRIPTION Q�l1AN�TIN UNIT UNIT PRICE TOTAL 1 CREDIT: REPLACE CTB WITH CMB. 1248 TON 10.62 $ 13,248.46 CONDITIONS: 1.Does not include permits, bonds, any form of engineering(slaking, testing, inspection, etc.), base under concrete, redwood headers, stnping, tic control, or utility adjustment unless otherwise specified. 2. Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent after 30 days, and they are subject to the maximum finance charge allowable by law. 3. Work to be one in accordance with plans, specifications, and quantities identified above. Koch -Armstrong Geneal Engineering, Inc. shall be notified in writing prior to any proposed changes. 4 Subgrade to be taken from *\- .10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified. 5. Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits, etc. shall be deemed cause for additional charges. 6 Required California Preliminary Lien information (California Civil Code Section 3397/3096) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins. 7. Subject to Credit Approval and verification of California Preliminary Lien information. 8. Class 2 material if included is 3\4" recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted. Acceptance: Firm: NATIONAL CITY By: Please sign and return one copy -this quotation constitutes the sole and only agreement. Any prior agreements, negotiations, etc., not set forth herein are of no force or effect. By: KOCH-ARMSTRONG GENERAL ENGINEERING, INC. Date Date FRANK HERRERA T-337 P.001/002 F-314 MAR-29-2010 02:00PM FROM- P � �- E Qu Quotation Attn: Frank 619-561-0317 Koch -Armstrong General Eng PO Box 1190 Lakeside, CA 92040 Acct #: 0044300 Data: Monday, March 29, 2010 Quote Created: Monday. March 29, 2010 Quote it: 1-PBN23M Quote Name: 736-7906 Effective From: Wednesday, August 25.2009 Version il: 2 w aVyU Project Sales Rep_ UUILI:111111 Vormi. Gonipsany Marina Gatewy Streetscape 23rd /Harrison / McKinley Cleveland National City, CA 13091G3 Mary French COPY frenchm@vmcmail.com (058)530-94.70 Quote Expiration: Wednesday, Septemuer 23, 2009 Price Expiration- Friday July 30, 2010 Special Instructions: REVISED QUOTE Sales tax not inclueed ? RE +tx/ 203202CD @ 533.00 +a Davis -Rustic 8rw for 202502CD @ 530.251yd Davis -Dune for 202502CD @ $7.601yd +tx (203202CD a $6.251yd +Ix Davis-Silversmoke for 202502CD @ 93.80/yd +tx / 203202CD 54.201yd +tx Asphalt Plant Mission Valley ASPh. Mission Valtey Asph. Mission Valley Aso. Read' ]Vlix Plant Mission Valley RMC Mission Valley RMC Mission Valley RMC Sand &Gravel Plant Carroll Canyon Agg. Carron Canyon Agg. Mission Valley Agg Mission Valley Agg. Product Name Product 400 3B2 64-1 D RAP B2Y 400 3C2 64-10 RAP 85F 400 3D 64-10 RAP B7X Product Name Product 495702-PERVIOUS 2HO 520C2500 4-LINE 2PU 565C3250P 4"LINE 2PX Product Name Product FILL SAND 30 ABD FILL SAND 15 ABV 3/4' CL 2 BASE A13 3/4- CRUSHED A2X Qty. Truck TYPO: 1,250 Truck Type. Truck Type: F.O.B. U!M Plant TONS $56.00 WED -End Dump TONS 556.00 WED -End Dump TONS $60.00 WED -End Dump F.O.B. Qty, U!M Plant 225 CBYDS $98.45 50 CBYDS $96.10 CBYDS $98.45 F.O.B. Qty. UIM Plant 500 TONS $12.00 Truck Typo: WED -End Dump 525 TONS $1.00 Truck Type: WED -End Dump 1,300 TONS $9.00 Truck Typo: WED -End Dump 500 TONS 511.00 Truck Type: WED -End Dump Additional Chat^as-Asphalt Environmental Foe is at $1.00\LOAD +tax Standing Time is at Si.501MINUTES @ 1 hourlload unloading time Additional Charges - Ready Mix Environmental Fee is at $15.00\LOAD + tax 4 min! d +tx Time Is at $1251MINUTES Unloading time @ Y Additio al Char es - Sand & Gravel Environmental Fee is at $1.001LOAD +lax hourtload unloading time Standing Time is at S1.501MINUTES @ Quotation generated on 3129/2010 Haul Rate $6.25 $6.26 $6,26 Haul Rate 50.00 5o.00 $0.00 Haul Rate $5.48 $5.48 $4.36 $4.36 Delivered $62.26 562.26 $66.26 Delivered $98.45 S96.10 $98.45 Delivered $17.46 $6.48 $13.36 $15.36 *Attn: Frank 619-561-0317 Koch - Armstrong General Eng PO Box 1190 Lakeside, CA 92040 Acct #: 0044300 Date: Quote Created: Quote #: Quote Name: Effective From: Version #: Friday, October 02, 2009 Friday, August 21, 2009 1-PBN23M 736-7906 Wednesday, August 26, 2009 VulcEarl Materials Company Project: Marina atewy Streetscape 23rd ',Harrison / McKinley Cleveland National City, CA 1309/G3 Sales Rep: Mary French frenchm@vmcmail.cam (858)530-9470 Quote Expiration: Wednesday, September 23, 2009 Price Expiration: Wednesday, March 31, 2010 - S u s Special Instructions: Sales tax not included Davis -Rustic Brw for 202502CD @ $30.25/yd +tx/ 203202CD @ $33.00 +tx Davis -Dune for 202502CD @ $7.60/yd +tx / 203202CD @ $8.251yd +tx Davis-Silversmoke for 202502CD @ $3.80/yd +tx / 203202CD $4.20/yd +tx Asphalt Plant Mission Valley Asph. Mission Valley Asph. .Mission Valley Asph. Ready Mix Plant Mission Valley RMC Mission Valley RMC Mission Valley RMC Sand & Gravel Plant Carroll Canyon Agg. Carroll Canyon Agg. Mission Valley Agg. Mission Valley Agg. Product Name Product 400 362 64-10 RAP B2Y 400 3C2 64-10 RAP B5F 400 3D 64-10 RAP B7X Product Name Product 496702-PERVIOUS 2HQ 520C2500 4"LINE 2PU 565C3250P 4"LINE 2PX Product Name Product CTB-2.2% A1F ABV A21 FILL SAND 15 3/4" CRUSHED FILL SAND 30 Qty. Truck Type: 1, 250` Truck.Type: . Tru Ek Type: 1 Qty. 225 50 Qty. 1,300 Truck Type: 525 Truck Type: 500 Truck Type: 500 Truck Type; F.O.B. U/M Plant. TONS $56.00 WED -End Dump TONS $56.00 WED -End Dump TONS $60.00 WED -End Dump F.O.B. U!M_.. Plant CBYDS $98.45 CBYDS $96.10 CBYDS $98.45 F.O.B. U/M Plant TONS $17.50 WED -End Dump TONS $1.00 WED -End Dump TONS $11.00 WED -End Dump TONS $12.00 WED -End Dump Additional Charges -Asphalt Environmental Fee is at $1.0 LOAD +tax Standing Time is at $1.50\MIUTES @ 1 hour/load unloading time, Additional Charges - eadv Mix Environmental Fee is at $1 .001LOAD + tax Standing Time is at $1.25INUTES Unloading time @ 4 min/yd +tx Additional Char es Sand & Gravel Environmental Fee is at 1.001LOAD +tax Standing Time is at $1. \MINUTES @ 1 hour/load unloading time Quotation generated on 10/2/2009 COPY Haul Rate $6.26 $6.26 $6.26 Haul Rate S0.00 $0.00 $0.00 Haul Rate $5.48 $5.48 $4.36 $4.36 Delivered $62.26 $62.26 $66.26 Delivered $98.45 $96.10 $98.45 Delivered $22.98 $6.48 $15.36 $16.36 +- CALIFORNIA —0- NATIONAL CITY INCOAPQRATED MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order Change Order #7 deleted the synthetic boardwalk from the project. Line item #20 calls for a boardwalk cross- over on Harrison. The synthetic board element of the cross -over (which allows for the drainage between the ped-ramp and the sidewalk) should now be concrete to match the sidewalk areas. CHANGE ORDER No. 11 May 28, 2010 The City of National City and Contractor agree to the following change to the original Contract: Contractor shall substitute the synthetic board element of the cross -over with concrete that matces the sidewalk in color and finish per the design provided by Rick Engineering. This is a no cost Change Order. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 1,880,446.00 $ 1,916,282.35 (35,836.35) 1,880,446.00 Working days added: 0 Working days subtracted: 0 Submitted by: s alter Ci Engin 5'ZQ� ' /0 Date (.fvbJID Date City Manager, required for Change Orders>$24,999 Date ect Mana By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to by Koch —Armstrong: . .5 /Z g •-4? ,t` Sy'2 8—/C `J ,Monty Koch/President Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 ccr)p A (a 8 r -M N\ 7..AA .-- ri A- Q 10' CONCRETE CROSSOVER DpvJa .- iiuro En1C1 Gvl d t�r.J ,,der-i4/satJ^4-i4 pan C DN3'i' 1 r+..9 t 1D5 9 fl COL ,.la, N.Y 24" LONG R4 BARS PER CONTACT JOINT SDRSO G- 3 - *4 BARS (TIE TOO) m4 BARS * 6" C.C. (TIE TO CONCRETE PAVING (SEE PLANS) 06 COMPACT SUBGRADE yr) 95% 10 {?� EXPANSION JOINT (PER SORSA JOINT DETAILS) 0) NIavie bc'te*vru JZ$6I (R ( V 15/2olo 5-`v'!<t5f 1-8 se+' 1-' t 4 ,r on) 2stcles D,Aru n, po-r It. 1, 10' WMOE CONCRETE CROSSOVER NOT TO SCALE" NOTE: THIS CROSSOVER* TO REPLACE THE BOAR0WALI{ CROSSOVER. SAME LOCATION AND ELEVATIONS. b\ ,sobs m r.oi._raie.men•dT a+«a.cxnaN.• \1Mr.siMV d.1QrNIm.2W6bNN.9�- fib' . ONlo W aGYLSi4..1«S.W.FM• «— CALIFORNIA —» NATIONAL I y INCORPORATRD MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: 'The original plans show the aphalt concrete to remain that exists between the rails on Harrison and over the railroad ties. This AC is old and in disrepair. Due to savings in other areas of the project, it is now feasable to ;repair this AC at this time. Waiting to repair this AC after the project is complete would cause damage to the -new AC on Harrison that is being installed on this project. CHANGE ORDER No. 12 May 28, 2010 The City of National City and Contractor agree to the following change to the original Contract: The Contractor shall remove and dispose of all existing AC on Harrison between the railroad rails and over the ties and install new full depth AC (6") in kind to match the rest of the project. This change represents approximately 1,292 square feet of AC removal and replacement. The unit price for all the removal, disposal and placement of new AC shall be $7.15 per square foot. Original Contract Amount. $ 1,916,282.35 Net change by previously authorized Change Orders... (35,836.35) Subtotal Amount of this change order 1,880,446.00 9,237.80 New contract amount ... $ 1,889,683.80 Working days added: 0 Working days subtracted: 0 Submitted by: uatCity Managers required for Change Orders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to by Koch Armstrong, Monty Koch/President Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 CALIFOR NIA ,^ -:- -INCORPORPTEO .-� MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. CHANGE ORDER No. 12 May 28, 2010 Reason/Purpose for this Change Order. The original plans show the aphalt concrete to remain that exists between the rails on Harrison and over the railroad ties. This AC is old and in disrepair. Due to savings in other areas of the project, it is now feasable to repair this AC at this time. Waiting to repair this AC after the project is complete would cause damage to the new AC on Harrison that is being installed on this project. The City of National City and Contractor agree to the following change to the original Contract: 'The Contractor shall remove and dispose of all existing AC on Harrison between the railroad rails and over the (ties and install new full depth AC (6") in kind to match the rest of the project. This change represents approximately 1,292 square feet of AC removal and replacement. The unit price for all the removal. disposa ;and placement of new AC shall be $7.15 pe- square foot. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitted by: [Project Manager $ 1,916,282.35 (35,836.35) 1,880,446.00 9,237.80 S 1,889,683.80 Date ICity Project Manager Date Approved by: City Engineer Date City Manager, required for Charge Orders>S24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, Terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to by Koch -Armstrong: June 1, 2010 Frank errera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 KOCH-ARMSTRONG GENERAL ENGINEERING, INC. P.O. BOX 1190, LAKESIDE, CA 92040-0906 \ TEL. (619) 561-2005 FAX: 561-0317 ROCH•ARMSTRONG 19 8199) LICENSE-A QUOTATION 10-032.5 COP-12 PAGE 1 OF 1(REVISED 5-28-10 ) CO 12 TO: NATIONAL CITY ATTN: BYRON WADE 1243 NATIONAL CITY BLVD. TEL', (619) 336-4380 NATIONAL CITY , CA. 91950 CELL: FAX: (819) 336 4397 DATE: 6/1/2010 EMAIL: byronwadel@mac.com We propose to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated. AS MILL & PAVE. This Quotation expires 30 days from the dale above and is good for work completed within one year of date above unless otherwise noted. JOB LOCATION SHEET 10101-D RAIL ROAD TRACKS ON HARRISON AVENUE, SOUTH OF 23rd St. (SEE RFI #38 FOR MORE INFO.) IDENTIFIED MARINA GATEWAY COP-12: REMOVE & REPLACE FAILED/CRUMBLED/SEPERATED 6" ASPHALT SHOWN ON SHEET 10101-D ITEM DESCRIPTION APPRO%. QUANTITY UNIT UNIT PRICE TOTAL 1 REMOVE AND REPLACE 152LF x 6" FAILED/ CRUMBLED AC, 3' ON EACH SIDE & 5' BETWEEN RAILS. 1292 SF 1.1 DEMO., HAUL & DISPOSE OF 2" AC. EXCAVATE & SPREAD 4" SOIL ONSITE. GRADE & COMPACT 6" @ 95% . 1292 SF 1.2 6"xl.5' ASPHALT CONCRETE, HAND PAVED OVER RAILROAD TIES & 6"X6"AT OUOTSIDE EAST SIDE TIE. 1292 SF LABOR 1 FOREMAN OPERATOR 8 HR 72.00 576.00 1 OPERATOR 8 HR 70.00 560.00 1 LABORER 16 HR 54.0D 884.00 SUBTOTAL LABOR 2000.00 MARKUP 20% 400.00 TOTAL LABOR 2400.00 EQUIPMENT & RENTAL 1 BOBCAT W1 BREAKER 1 HR 50.00 50.00 1 BOBCAT 10 HR 25.00 250.00 1 3-5 TON ROLLER 5 HR 25.00 125.00 1 WATER BUFFALO 2 HR 10.00 20.00 1 HR 1 VIBRAPLATE 4 HR 10.00 40.00 1 TACK RIG 4 HR 10.00 40.00 2 CREW TRUCK 12 HR 25.00 300.00 10 WHEELER(S) 12 HR 88.00 1056.00 SUBTOTAL EQUIPMENT & RENTAL 1881.00 MARKUP 15% 282.15 TOTAL EQUIPMENT & RENTAL 2163.15 MATERIAL DUMP FEES 4 LD 75.00 300.00 TACK OIL 26 GAL 2.72 70.72 AC MATERIAL 54 TN 66.34 3582.23 SUBTOTAL MATERIAL 3952.95 MARKUP 15% 592.94 TOTAL MATERIAL 4545.89 SUB -TOTAL CHANGE ORDER PROPOSAL-12 9109.04 BOND COST 1.50% 136.64 TOTAL CHAN €-OR0E PROPOSAL-11 1 LS 8246,67 TOTAL (REVISION 6) CHANGE ORDER PROPOSAL-11 1,292 SF 7.15 9237.80 CONDITIONS: 1.Does not include permits, bonds. any form o/ engineering(slaking, testing. inspection, etc.), base under concrete. redwood headers, striping, traffic control, or utility adjustment unless otherwise specified. 2. Monthly Progress Payments and Full Payment upon completion. Accounls are delinquent after 30 days. and they are subject to the maximum finance charge allowable by law. 3. Work to be done in accordance wilh plans, specifications, and quantifies identified above. Koch -Armstrong General Engineering, Inc. shall be notified in writing prior to any proposed changes. 4.Subgrade to be taken from +1- .10' to balance and at or below optimum moisture berme Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified. 5. Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits, etc. shall be deemed cause for additional charges. 6. Required California Preliminary Lien information (California Civil Code Section 3097/30901 shall be provided to Koch -Armstrong General Engineering, Inc. before work begins. 7. Subject to Credit Approval and verification of California Preliminary Lien Information. 0. Class 2 maleral if included is 314" recycled Class 2 per Callrans Standard Specification Section 26 unless otherwise noted. Acceptance: Please sign and return one copy -this quotation conslilutes the sole and only agreement Any prior agreements, negotiations, etc., nol set forth herein are o1 no force or effect. KOCH-ARMSTRONG GENERAL ENGINEERING, INC. Firm: NATIONAL CITY By: By: Date FRANK HERRERA Dale TE %or Tt.1( r. t A A) OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax KOCH ARMSTRONG GENERAL ENGINEERING Change Order Nos. 9,10,11 and 12 Marina Gateway Streetscape, FY 09-10 Judy Hernandez (Engineering) Forwarded Copies of Change Orders to Contractor