Loading...
HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #7, #8, #13, #14, #15, #16, #17 Marina Gateway Streetscape, FY 09-10,§.. CALIFORNIA �«- NATIONAL orr 7NCORPOR ASE MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order 'City Management, staff and project consultants met to determine possible Value Engineering options for this ;project. It was determined that changing some of the walking surface from a synthetic wood planking to architectual concrete to match the rest of the project would represent a significant cost savings to the project 'and will save future maintenance costs. CHANGE ORDER No. 7 May 19, 2010 (revised) "The City of National City and Contractor agree to the following change to the original Contract: This change in the contract will remove the synthetic wood boardwalk feature from the contract and replace it with sidewalk that matches the rest of the project. All of the work under line item #61, Board Walk, shall be deleted from the contract for a decrease of $94,128.00, and concrete sidewalk shall be installed instead per line item #14 for an increase of 3,922 square feet at $4.00 per square foot totaling $15,688, for a overall saving of $78,440.00. Changes shall be indicated on line item quantities in the invoices. Original Contract Amount $ 1,916,282.35 Net change by previously authorized Change Orders 61,724.01 Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitted by: A =City ngi er Date 1, 978, 006.36 (78,440.00) $ 1,899,566.36 Percent change in Contract to date -0.87% City Date Date ,City Manager, required for chanr Orders>$24,999 Date J By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to by Koch Armstrong: 'Frank Herrera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 MARINA GATEWAY STREETSCAPE Specification #08-16 CALIFORNIA NATIONAL CITE► • INCORPORAT7± CHANGE ORDER No.8 May 19, 2010 Contractor: Koch -Armstrong General Engineering, Inc. (revised) Reason/Purpose for this Change Order: "City Management, staff and project consultants met to determine possible Value Engineering options for this project. It was determined that deleting the acid etch finish from the sidewalk concrete would match the new "concrete sidewalks on Bay Marina Drive and represent a significant cost savings to the project. The City of National City and Contractor agree to the following change to the original Contract: This change in contract will delete the acid etch on the new sidewalk in line item #14. The credit shall be ;calculated at $0.39 per square foot. There will be 30,714 square feet of sidewalk installed on this project for a total credit of $11,978.46. The finish of all sidewalk surfaces shall match the sidewalk finish of the new sidewalk on Bay Marina Drive. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ $ 1,916,282.35 (16,715.99) 1, 899, 566.36 (11,978.46) Working days added: 0 Working days subtracted: 0 Submitted by: P Ci En inel . z -/C) Date Percent change in Contract to date -1.50% 1,887,587.90 Date Date "City Manages required for Change Orders >$24,999 Date.. By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to by Koch Armstrong:_ Frank Herrera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 CALIFORNIA —0. NATIONAL CITY rriCORPORATED MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: CHANGE ORDER No. 13 June 7, 2010 The original plans show the asphalt to be ground and overlayed adjacent to the pervious paving on the east side of Cleveland between 23rd and Bay Marina Drive. Due to grade differences between the existing asphalt and !the adjacent curb surrounding the pervious pavement, there will not be enough asphalt left after grinding it to match the pervious paving. For proper grades and to construct a sufficiet asphalt section on the east side of Cleveland along the pervious paving from Bay Marina Drive to 23rd Street, the street must be excavated and reinstalled lower to provide for a new structural section at the proper grades. The City of National City and Contractor agree to the following change to the original Contract: The Contractor shall demolish, remove and dispose of the existing street section, excavate and dispose of soil :and prepare subgrade necessary for the installation of a new 6" AC on 6" CMB street section on the east side of Cleveland adjacent to the pervious paving for a width of fifteen feet (15'). The Change Order represents the 'change in the lump sum bid for Demolition and Excavation. The added demolition and excavation area is 3,590 ;square feet at $3.91 per square foot (equivalent to the base bid lump sum price calculated to square foot) for a total of $14,036.90. The 6" AC on 6" CMB street section line item will be extended by approximately 3,590 ;square feet at $4.35/sq. ft. totaling $15,616.50, and the AC Overlay line item will be reduced by approximately 2400 square feet at $2.50/sq. ft. totaling $6,000.00 credit. This change in the contract is approximatelly $2.3.,65.3.4Q...Aj dollar oha_n_ges shaW.l.bfi_mac.to the fine items on inyoloesfor_2..tuell emo.Unt.measi_rec,i___ Original Contract Amount $ 1,916,282.35 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 1,913,337.20 Working days added: 3 (26, 598.55) 1,889,683.80 23,653.40 Submitted by: PrbjE Appr ngl Working days subtracted: 0 Date Percent change in Contract to date -0.15% Date Date City Manager egufredfor chan eOrdes>szasss Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to by Koch Armstrong: 4,/ Frank Herrera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 +- CALIFORNIA —0- NATIONAL CITY a 1 .. INCORPO L&' MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: During the installation of the sewer main on 23rd, the force main sewer pump was turned on seven separate 'occasions. On each occasion the contractor established a temporary connection, waited for the pumping to :stop and flow to subside, removed the temporary connection and continued with the sewer main installation. :City sewer crews stated that they were required to turn on the main do to unexpected flows from docked ships. Although, this represents unexpected additional costs it is a cost saving from having by-pass pumps set-up ;throughout the sewer main installation. CHANGE ORDER No. 14 June 7, 2010 The City of National City and Contractor agree to the following change to the original Contract: The Contractor stopped work, set-up and brokedown temporary sewer mains on 7 separate occasions while installing the sewer main on 23rd. This change order represents the cost of the crew and equipment for each delay. The Contractor was delayed for a total of 16 hours. Half of the delay time was with equipment in use to ,set up the temporary main and half of the time the equipment was idle. Equipment time will be factored accordingly. Original Contract Amount $ 1,916,282.35 Net change by previously authorized Change Orders (2,945.15) Subtotal... Amount of this change order 1, 913, 337.20 14,919.98 New contract amount $ 1,928,257.18 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 0.62% Submitted by: Project Manager Approved by: City, Engineer Date C• ity Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to b Koch Armstrong: Frank Herrera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 . CALIFORNIA -« MARINA GATEWAY STREETSCAPE Specification #08-16 NATIONAL Clint ATED CHANGE ORDER #14, Attachment "A" SUMMARY OF ACCOUNTING REPORT FOR TIME, MATERIALS, AND EQUIPMENT FOR SEWER DELAY EQUIPMENT HOURS HOURLY RATE DELAY FACTOR EXTENSION TOTALS Crew Truck 8 29.95 None 239.60 Crew Truck 8 29.95 None 239.60 JD 7101 Backhoe 8 79.69 None 637.52 Cat 256 8 32.97 None 263.76 Hatachi 790E 8 91.49 None 731.92 Traffic Control 8 10.00 None 80.00 Furakawa LI 8 111.11 None 888.88 10 Wheel truck 8 64.77 None 518.16 Broom 8 27.35 None 218.80 EQUIPMENT SECTION SUBTOTAL EQUIPMENT MARK-UP 15% 3,818.24 572.74 SUBTOTAL: 4,390.98 EQUIPMENT HOURS HOURLY RATE DELAY FACTOR EXTENSION TOTALS Crew Truck 8 29.95 0.16 38.34 Crew Truck 8 29.95 0.16 38.34 JD 7101 Backhoe 8 79.69 0.16 102.00 Cat 256 8 32.97 0.33 87.04 Hatachi 790E 8 91.49 0.23 168.34 Traffic Control 8 10.00 80.00 Furakawa LI 8 111.11 0.23 204.44 10 Wheel truck 8 64.77 0.24 124.36 Broom 8 27.35 0.16 35.01 EQUIPMENT SECTION SUBTOTAL EQUIPMENT MARK-UP 15% 877.87 131.68 SUBTOTAL: 1,009.55 LABOR HOURS HOURLY RATE EXTENSION Foreman 16 59.16 946.56 Operator (2) 32 57.16 1,829.12 Laborer 1 (2) 32 41.67 1,333.44 Laborer 4 (2) 32 39.96 1,278.72 LABOR SECTION TOTAL LABOR SURCHARGE 33% LABOR LABOR 5,387.84 1,777.99 SUBTOTAL MARK-UP 20% 7,165.83 1,433.17 SUBTOTAL: 8,598.99 Subcontractor Total Prime Contractor Mark-up 5% bond @ 1.5% Change Order Total 13,999.52 699.98 220.49 14,919.98 CALIFORNIA -« Percent change in Contract to date 1.36% Subtotal Amount of this change order NATIONAL env 1-. INCORPORATED -� MARINA GATEWAY STREETSCAPE CHANGE ORDER No. 15 Specification #08-16 June 7, 2010 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: This change in contract is necessary because the plans show a straight connection for the five large water and fire services on 23rd Street. Due to conflicts with the sewer and other underground utilities, deflection couplings are required to redirect all water and fire services on 23rd Street around existing sewer lines and utilities. The City of National City and Contractor agree to the following change to the original Contract: The Contractor shall install deflection couplings were required to redirect all water mains and fire services on 23rd Street around existing sewer lines and utilities. This work requires an additional two (2) hours of labor and equipment, as well as the defelection couplings, at each location. Total hours for manpower, equipment and materials shown on attachment "A". Original Contract Amount $ 1,916,282.35 Net change by previously authorized Change Orders... ................................. 11,974.83 1,928,257.18 14,169.94 New contract amount $ 1,942,427.12 Working days added: 0 Working days subtracted: 0 Submitted by: Pro a Rigger Date Date City Engineer Date:City Manager, required for Chanie Orders >$24,989 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to by Koch Armstrong: Frank Herrera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 *-- CALIFORNIA �+ NaioNAL ciTir INCORPORATE' MARINA GATEWAY STREETSCAPE Specification #08-16 CHANGE ORDER #15, Attachment "A" SUMMARY OF ACCOUNTING REPORT FOR TIME, MATERIALS, AND EQUIPMENT FOR SEWER DELAY EQUIPMENT HOURS HOURLY RATE DELAY FACTOR EXTENSION TOTALS Crew Truck 10 29.95 299.50 Crew Truck 10 29.95 299.50 JD 710j Backhoe 10 79.69 796.90 Cat 256 10 32.97 329.70 Hatachi 790E 10 91.49 914.90 Shoring* - applies to all locations 1.2 10.50 12.60 Traffic Control 10 10.00 100.00 Furakawa LI 10 111.11 1,111.10 10 Wheel truck 10 64.77 647.70 Steel Plates** - applies to all locatio 1.2 100.00 120.00 Broom 10 27.35 273.50 EQUIPMENT SECTION SUBTOTAL EQUIPMENT MARK-UP 15% 4,905.40 735.81 SUBTOTAL: 5,641.21 MATERIALS Units UNIT COST EXTENSION Concrete 3 150.00 450.00 Quote 1 1,532.75 1,532.75 MATERIAL SECTION SUBTOTAL MATERIAL MARK-UP15% 1,982.75 297.41 SUBTOTAL: 2,280.16 LABOR HOURS HOURLY RATE EXTENSION Foreman 10 59.16 591.60 Operator (2) 20 57.16 1,143.20 Laborer 1 (2) 20 41.67 833.40 Laborer 4 (2) 20 39.96 799.20 LABOR SECTION TOTAL LABOR SURCHARGE 33% LABOR LABOR 3,367.40 1,111.24 SUBTOTAL MARK-UP 20% 4,478.64 895.73 SUBTOTAL: 5,374.37 Subcontractor Total Prime Contractor Mark-up 5% bond @ 1.5% Change Order Total 13,295.74 664.79 209.41 14,169.94 ••- CALIFORNIA ^-0- Subtotal Amount of this change order NATIONAL CITY �... lNCORPORATRO MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: During the installation of the sewer main the contractor struck unmarked gas lateral stubs. After the second lateral stub was struck SDG&E required the relocation of the gas main. The contractor lost the days production and backfilled the trench, secured the site, remobilized and redug the trench later. CHANGE ORDER No. 16 June 7, 2010 The City of National City and Contractor agree to the following change to the original Contract: This change in contract shall compensate the contractor for delays to the installation of the sewer main. This change order represents the final agreement between the parties for all compensation for all delays to the project up to the date of this change order that has not been represented by a prior change order. Total hours for manpower, equipment and materials shown on attachment "A" for a total of $ Original Contract Amount $ 1,916,282.35 Net change by previously authorized Change Orders...... ................................. 26,144.77 1,942,427.12 18,249.99 New contract amount $ Working days added: 0 Working days subtracted: 0 Submitted by: alter ;;Ap, 1CI Date Percent change in Contract to date 2.32% 1,960,677.11 Date Cjty Manager, requgegforcneege Orders 424999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and aed to by Koch Armstrong: ;Frank Herrera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc: Engineering project file, Project Manager Telephhone (619) 336-4380 CALIFORNIA ^,. NoioNnorr 1,313,y r?CORPORATEP MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: The plans indicate that pervious concrete shall be installed in front on the easterly most commercial driveway on the north side of 23rd Street. This is an incorrect design and must be 3250 psi concrete. The pervious concrete was installed per plan at this location. This change in the contract is to remove the already installed pervious concrete and install 3250psi concrete per NC modified G-12. CHANGE ORDER No.17 June 29, 2010 The City of National City and Contractor agree to the following change to the original Contract: The Contractor shall remove 260 square feet of pervious paving at the easterly most driveway on the north side of 23rd Street and replace it with 3250 psi concrete per NC modified G-12. Cost for removal and replacement shall be $11.31 per square foot. There will be 260 square feet of removal at $11.31 per square foot for a total of $2,940.60. Original Contract Amount $ 1,916,282.35 Net change by previously authorized Change Orders... Subtotal Amount of this change order 44,394.76 1,960,677.11 2,940.60 New contract amount $ 1,963,617.71 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 2.47% Submitted by: y C5 Date /ApplOveq' by.* /I ity Engin !City Mana er re wired for Chan eOrders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees. bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. Accepted and agreed to by Koch Armstrong: C!� Frank Herrera, Project Manager Da Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc: Engineering project file, Project Manager Telephhone (619) 336-4380 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax KOCH ARMSTRONG GENERAL ENGINEERING, INC. Change Order #s 7, 8, 13,14,15, 16 and 17 Marina Gateway Streetscape, FY 09-10 Judy Hernandez (Engineering) Forwarded Copy of Change Orders to Contractor