HomeMy WebLinkAbout2010 CON Palm Engineering - Change Order #2 Parks Rehab, Phase 4NOTE TO FILE 07-29-10 IN THE MATTER OF: Change Order #2 with Palm Engineering Construction Company, Inc. in the amount of $318.00 for the National City Parks Rehabilitation and ADA Improvements Project (Phase 4). Please note the following: A FULLY EXECUTED ORIGINAL CHANGE ORDER WAS NEVER FILED WITH THE OFFICE OF THE CITY CLERK ORIGINATING DEPARTMENT: NTF _ CDC Housing & Grants City Attorney Human Resources _ City Manager _ MIS Community Svcs. Planning X Engineering _ Police _ Finance _ Public Works Fire CALIFORNJA ft O y�y C17 lV'I NCORPORA.rED CITY OF NATIONAL CITY Parks Rehabilitation, Phase IV Specification No. 09-07 CHANGE ORDER #2 March 24, 2010 Contractor: Palm Engineeing A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract Contractor will supply andhard wire install one exterior, flourecent,30W minimum photocell controlled light fixture outside the snack shack at Las Palmas above the service window. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. See Attachment Justification for Change in Contract The original contract did not have an exterior light fixture designated for installion. This is being done at the City's request to illuminate an dark area where people wait to utilize the snack shack after dark during games. Construction Contract Accounting Summary Original Contract amount: $ 66,000.00 Net change by previously authorized Change Orders: $ 1,500.00 Contract amount prior to this Change Order: $ 67,500.00 Amount of this Change Order: $ 318.00 New Contract amount: $ 67,818.00 Original Contract time (calendar days): 45 Previously approved additional working days: 1 Additional working days for this Change Order: 5 Total Contract time (working days): 51 (see Weekly Statement of Contract Time for completion date) Reviewed by: Principal Civil Engineer Date Shahram Elihu, Pres. Dat Palm Engineering cc: Contractor, Construction File, Project Manager. City Clerk �Cl Recommended for approval by: Pro' Approved by: ity En Date (Fagt/fo nAn• «-MCA NA.l IO arlIT rscoaro* •mo o PARKS REHABILITATION PHASE IV Specification #09-07 CHANGE ORDER #2, Attachment "A" SUMMARY OF ACCOUNTING REPORT FOR TIME, MATERIALS, AND EQUIPMENT FOR SEWER DELAY EQUIPMENT Crew Truck HOURS 4 HOURLY 29.95 DELAY FACTOR EXTENSION 119.80 TOTALS EQUIPMENT SECTION SUBTOTAL EQUIPMENT MARK-UP 15% 119.80 17.97 SUBTOTAL: 137.77 MATERIALS UNITS UNIT COST EXTENSION Light, wiring, conduit 1 100.00 100.00 MATERIAL SECTION SUBTOTAL MATERIAL MARK-UP15% 100.00 15.00 SUBTOTAL: 115.00 LABOR HOURS HOURLY RATE EXTENSION Inside electrician 4 89.99 359.96 359.96 118.79 478.75 95.75 SUBTOTAL: 574.50 Subtotal Total Cotractor Cost Contractor discounted price to fit budget 827.27 $ 827.27 $318.00 LABOR SECTION TOTAL LABOR SURCHARGE 33% LABOR SUBTOTAL LABOR MARK-UP 20% PALM ENGINEERING CONSTRUCTION COMPANY, INC. 3770 Hancock Street, Suite H, San Diego, CA 92110 (619) 291-1495, fax (619) 291-0482 Proposal June 16, 2010 KEN FERNANDEZ CITY OF NATIONAL CITY 1243 National City Boulevard National City, CA 91950 (619) 336-4388, Fax (619) 336-4397 kfernandez@nationalcityca.gov Re: National City Parks Rehabilitation & ADA Improvements Project (Phase 4) Additional Light Fixture @ Las Palmas Dear Byron: Following is the breakdown cost for Light Fixture @ Las Palmas Snack Bar: Total Cost $ 318.00 Thank you for your consideration of the above proposal. If you have any questions, please call me. Sincerely, S&iatiram��iu Shahram Elihu Project Manager SE/hmd Page 1 of 1 National City Parks Rehabilitation and ADA Improvements Project, Phase 4 Spec No. 09-07 #1 #2 Poi,___.. Vendor;' PO Amount Ad, 0 Amt PO Balance Palm Engineering $ 66,000.00 67,818.00' 44,258.00 Construction Type of service Account No Amount alanco Invoice Date 12/23/2009 001-409-500-598-4127 66,000.00 Amount_ 23,560.00 Acct Adjusted Amount .7,;18. 00 Invoice Number Invoice # 01; with 5% retention; Complete invoice & coversheet rec'd 01/19/10 Total C/O No.,.Y,... 1 Amount 1.500.00 CCO #1 10-1.6 I Change Order Description f for toilets and urinals @ Las Palmas and El Toyon restroon 2 $ 318.00 CCO #2 1 ext florescent photocell -controlled light at Las Palmas snack bar 3 4 5 Total! $ 1,818.00 Account No ;Amount Balance Invoice Date Total Total $ Amount Adjusted Account PO Balance Invoice Number Change Order Description;µ