HomeMy WebLinkAbout2010 CON Koch Armstrong - Notice of Completion Street Resurfacing Project FY 09-10PLEASE COMPLETE THIS INFORMATION
RECORDING REQUESTED BY:
CITY CLERK OF NATIONAL CITY
1243 National City Blvd
National City, CA 91950
AND WHEN RECORDED MAIL TO:
CITY CLERK OF NATIONAL CITY
1243 National City Blvd
National City, CA 91950
DOC # 2010-0368727
JUL 22.2010 12:12 PM
OFFICIAL RECORDS
SAN DIEGO COUNTY RECORDER'S OFFICE
DAVID L. BUTLER, COUNTY RECORDER
FEES: 0.00
PAGES
2
1llllll IIIII IIIII IIIII IIIII Hill IIIII IIIII Hill IIIII IIIII IIIII IIIII IIIII INII IIII IIII
THIS SPACE FOR RECORDER'S USE ONLY
NOTICE OF COMPLETION: National City Street Resurfacing Project, FY 09-10
(Please fill in document title(s) on this line)
THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO:
CITY OF NATIONAL CITY
1243 NATIONAL CITY BOULEVARD
NATIONAL CITY, CA 91950-4301
NOTICE OF COMPLETION
CALIFORNIA CIVIL CODE SECTION 3093
NOTICE IS HEREBY GIVEN of the completion on June 22, 2010, of:
National City Street Resurfacing Project, FY 09-10, Specification No. 09-09
Work of improvement or portion of work of improvement under construction or alteration.
Various street sections throughout National City, CA
Street address City State
91950
Zip Code
The undersigned owns the following interest or estate in said property: °U
Nature of the interest or estate of owner (mortgagor, lessee, etc.)
Said work of improvement was performed on the property pursuant to a contract with
Koch -Armstrong General Engineering, Inc.
Name of Original Contractor
The following work and material were supplied: Laborer Groups, Bob Cat, Trucks,
Temporary Pumps, Cement Masons, Operators, Paving Equipment, Traffic Control
Equipment, Sweeper, Loaders, etc.
General statement of kind of labor, services, equipment or materials
The names and addresses of co -owners are: N/A
Joint tenants, tenants in common, 9re)ber owners
Dated: June 22, 2010.
Morrison, ,Mayor
City of National City, 1243 National City Blvd., National City, CA 91950-4301
I, the undersigned, say: I have read the foregoing Notice of Completion, and know the contents
thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing
is true and correct.
Executed on June 2010, at National City, California.
Signature:
R F MORRISON, MAYOR
NOC 09-09
FINAL CONTRACT BALANCE CHANGE ORDER
DATE: June 22, 2010
PROJECT: National City Street Resurfacing Project, FY 09-10,
Specification No. 09-09
TO:
Koch -Armstrong General Engineering, Inc
Mr. Chris Armstrong / Mr. Monty Koch
P.O. Box 1190
Lakeside, CA 92040
ORIGINAL CONTRACT AMOUNT:
START DATE:
COMPLETION DATE:
ORIGINAL CONTRACT LENGTH:
EXTENTION OF WORK DAYS:
TOTAL CONTRACT TIME:
DESCRIPTION OF CHANGE:
$1,272,720.00
September 2, 2009
May 19, 2010 (includes downtime due to multiple
change orders, cleanup, and inspection)
80 working days
35 working days
115 working days
This change order is written to balance and finalize the amounts for said project.
Original Contract
Adjusted Contract
No.
Item
Unit
Bid Qty
Unit
Price
Amount
Qty
Unit Price
Amount
I
Mobilization
LS
1
$7,612.48
$7,612.48
1.20
$7,612.48
$9,164.38
2
Cold Milling
SF
24,440
$0.34
$8,309.60
79,892.00
$0.340
$27,163.28
3
Asphalt Rubber Hot Mix
(ARHM) Gap Graded and
adjust utility cans
TON
1,838
$112.00
$205,856.00
3,167.63
S112.00
$354,774.56
4
Type II Slurry
SY
109,237
$1.32
$144,192.84
109,986.00
$1.32
$145,181.52
5
R&RAC 2'-6' depth (dig
outs)
TON
6,018
$95.00
$571,710.00
8,845.28
$95.00
$840,301.60
6
R&R unsuitable sub -grade
with CAB and fabric
TON
750
$40.00
$30,000.00
0
$40.00
$0
7
Crack filling and weed
abatement
SY
109 237
$0.32
$34,955.84
148,525.00
$0.32
$47,528.00
8
R&R G7 sidewalk
SF
5,207
$7.65
$39,833.55
13,592.75
$7.65
$103,984.54
9
R&R G2 curb & gutter
LF
532
$44.00
$23,408.00
1,298.50
$44.00
$57.134.00
10
R&R driveway G14, 6" PCC
SF
1,759
$9.75
$17,150.25
2,069.75
$9.75
$20,180.06
I I
CCU alley apron G17, 6"
SF
728
$11.00
$8,008.00
2,077.00
$11.00
$22,847.00
12
PCC cross gutter G12, 6"
SF
240
$20.50
$4,920.00
1,842.00
$20.50
$37,761.00
13
PED Ramps G27-631
EA
18
$2,110.00
$37,980.00
33.00
$2,110.00
$69,630.00
14
Adjust sewer manhole to
grade RSD
LA
39
$200.00
$7,800.00
23.00
$200.00
$4,600.00
15
Adjust survey monuments to
grade RSD
EA
10
$500.00
$5,000.00
2.00
$500.00
$1.000.00
16
Replace traffic loops
EA
101
$206.00
$20,806.00
171.00
$206.00
$35,226.00
17
Restriping of street including
thermoplastic street
markings, curb markings, &
street traffic markers
LS
I
$38,660.00
$38,660.00
1.13
$38,660.00
$62,823.83
18
Signs (12 of NC 30" X 30")
LA
12
$120.00
$1,440.00
18.00
$120.00
$2,160.00
Page 1
FINAL CONTRACT BALANCE CHANGE ORDER
19
Remove crosswalks (per
attachment "B")
EA
18
$550.00
$9,900.00
2.00
S550.00
$1,100.00
20
Remove and re -stripe
centerline and angled parking
(per attachment "D")
LS
1
$3,410.00
$3,410.00
1.00
$3,410.00
$3,410.00
21
Type I Slurry over crosswalk
removal areas
SF
4,800
$2.60
$12,480.00
0
$2.60 SO
22
Paint center stripe on E 14th St
(per attachment "C)
LS
1
$330.00
$330.00
1.00
$330.00
$330.00
23
Add truncated domes to
existing ped ramps at Marina
Way & Bay Marina Drive
EA
2
$440.00
$880.00
2.00
$440.00
$880.00
24
Harbor Drive Bike Lane 1-
1/2" grind
SF
30,816
$0.34
$10,477.44
24,151.00
$ 0.34 $8,211.34
25
Harbor Drive Bike Lane 1-
1/2" asphalt overlay
TON
300
$92.00
$27,600.00
251.14
$92.00 $23,104.88
SUBTOTAL (Before and after
line item increases)
$1, 272, 720. 00
$1, 8'8, 495, 99
CCOI
Tree Trimming:
Commercial Streets
LS
I
1.00
S4,433.74
$4,433.74
CCO2
Tree Trimming: Residential
Streets
LS
l
1.00
S1,108.39
S1,108.39
CCO3
Tree Removals and stump
grind
LS
1
1.00
1,400.00
1,400.00
CCO4
Grading/landscape at
Sweetwater Rd/Prospect
LS
1
1.00
S5,900.00
$5,900.00
CCOS
Add 7 Additional Streets to
resurface: tree trimming cost
shown (mostly absorbed as a
line item increase)*
LS
I
1 00
$1,438.26 out of
$500,149.05*
$1,438.26
CCO6
18" Street Overtime
LS
I
1.00
S5,526.72
$5,526.72
CCO7
Raising In -Pavement
Flashing Lights
LS
1
1.00
S9,967.87
$9,967.87
CCO8
Signal Detector Cards
LS
I
1.00
$778.00
$778.00
CCO9
E 16`� St and G Ave
restriping and signs
LS
I
1.00
S2,126.00
$2,126.00
CCO10
Replace In -pavement
flashing light at E 24" St and
F .Ave
LS
1
1.00
S1,810.71
$1,810.71
CCOI I
E 18"/Palm Ave intersection
improvements (absorbed as
a line item increase)*
LS
1
1.0(1
$57,662.90
$57,662.90
CCOI2
Additional traffic loops and
striping (absorbed as a line
item increase)*
LS
1
1.00
$22,918.51
$22,918.51
Change Order subtotal
$613,781.89
*Adjustments due to CCOs 5,
II. and 12 are included as a
line item change
($579,292.20)
GRAND TOTAL
$1,912,985.68
Page 2
FINAL CONTRACT BALANCE CHANGE ORDER
DISCUSSION:
Added line items:
Change Order Numbers One through Twelve were added for an aggregate total of
$613,781.89.
During the course of construction, field conditions were discovered, time -sensitive work,
or Ctiy-initiated change orders were approved and added to the project with the following
12 change orders:
1) Tree trimming at residential streets
2) Tree trimming at commercial streets
3) Remove and stump grind large trees at 2119 and 2222 Melrose Street
4) Sweetwater Road sidewalk erosion control — grading and slope landscaping
5) Add seven (7) additional streets to resurface to the base contract by
$500,149.05 per Resolution 2009-259
6) Saturday dig -outs due to safety concerns in front of National City Middle and
Otis Elementary Schools on E 18`h Street between D and Highland Avenues
7) Removal and replacement of In -pavement flashing lights at school crosswalk
on E 24th Street and F Avenue
8) Purchase and install two detector cards and 250 lineal feet of Detector Leading
Cable (DLC) at E 8th Street and Palm Avenue
9) Purchase and install signage, barricade, and high intensity striping for
crosswalk at E 16th St and Palm Avenue
10) Remove and replace one (1) In -pavement flashing light piece at E 24th Street
and F Avenue
11) Resurfacing, concrete, striping, and traffic improvements at and north of E
18th Street and Palm Avenue
12) Remove and replace a) traffic loops at 13 locations and b) a combination of
signage, barricade, and/or striping at three (3) locations
Therefore, the construction bid price of $1,272,720.00 was increased by $613,781.89 to
$1,886,501.89.
Furthermore, line item increases/deductions as shown in the final balance change order
totaling $26.483.79 were added to the scope of work per the contract and specifications
due to additional deteriorated conditions discovered while work was in progress.
Therefore, the construction cost of $1,886,501.89 was increased to a final construction
cost of $1,912,985.68.
Page 3
FINAL CONTRACT BALANCE CHANGE ORDER
CONTRACT ADJUSTMENT:
As a result of this change order, the contract price is adjusted as follows:
1.
The final contract price to date is adjusted to S1,912,985.68.
As a result of the satisfactory completion of said project, a retention and final
balance of S99,810.40 is set for invoice processing and payment upon the receipt
of required signatures and City Council's ratification of this agreement and the
Notice of Completion.
This document and its purpose to balance payment shall be considered full compensation
for furnishing and installing the materials, labor, tools and equipment, profit, overhead,
and all incidentals for performing the work described above. Koch -Armstrong General
Engineering, Inc. will not be entitled to damages or additional payment for delays as
described in the 2009 edition of the Standard Specifications for Public Works
Construction, Section 6-6.3, for performing the work as described above.
Page 4
FINAL CONTRACT BALANCE CHANGE ORDER
RECOMMENDED FOR APPROVAL BY:
Byr
W,
Associates
sect Manager (Consultant)
5�26-`o
DATE
,Gycctu� O5/27h°
Kenneth ernandez DATE
CIVIL ENGINEERING TECHNICIAN
NATIONAL CITY PROJECT COORDINATOR
REVIEWED BY:
Din Daneshfar, P.E.
PRINCIPAL CIVIL.ENGINEER
ryam Babaki, P.E.
CITY ENGINEER
ACCEPTED BY:
/6('
Koch -Armstrong General Engineering, Inc.
CONTRACTOR
APPR VED BY:
R6n Morrison
MAYOR
DAl
DATE I M
(Q 7-/0
DATE
June 22, 2010
DATE
City of National City Resolution Number: 2010-128
Page 5
RESOLUTION NO. 2010 — 128
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ACCEPTING THE WORK PERFORMED BY KOCH-ARMSTRONG
GENERAL ENGINEERING, INC., FOR THE FINAL CONTRACT AMOUNT
OF $1,912,985.68, AUTHORIZING THE FILING OF THE NOTICE OF
COMPLETION WITH THE COUNTY RECORDER, AND AUTHORIZING
THE RELEASE OF THE RETENTION IN THE AMOUNT OF $99,810.40
FOR THE NATIONAL CITY STREET RESURFACING PROJECT
It appearing to the satisfaction of the Engineering Department that all work
required to be done by Koch -Armstrong General Engineering, Inc., for the total final amount of
$1,912,985.68 for the National City Street Resurfacing Project has been completed, the City
Council of National City hereby accepts said work, authorizes the filing of the Notice of
Completion with the County Recorder, and orders that payment for said work be made in
accordance with said contract, including retention.
PASSED and ADOPTED this 22nd day of June, 2.
on Morrison, Mayor
ATTEST:
Mike Dalla, City lerk
APPROVED AS TO FORM:
George H. Eiser, Ill
City Attorney
Passed and adopted by the Council of the City of National City, California, on June 22,
2010 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Sotelo-Solis, Van Deventer, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
/A
City Clerk of the Ci
of Nhtional City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2010-128 of the City of National City, California, passed and
adopted by the Council of said City on June 22, 2010.
City Clerk of the City of National City, California
By:
Deputy
CITY OF NATIONAL CITY, CALIFORNIA
COUNCIL AGENDA STATEMENT
Ca.00al-5%
MEETING DATE:
"'ITEM TITLE:
June 22, 2010
AGENDA ITEM NO. 12
Resolution of the City Council of the City of National City: 1) accepting and approving the work
performed by Koch -Armstrong General Engineering, Inc. for the final contract amount of
$1,912,985.68, 2) filing of the Notice of Completion with the County Recorder, and 3) releasing the
retention amount of $99,810.40 for the National City Street Resurfacing Project, FY 09-10. (Funded
through Gas Tax, Traffic Congestion Relief. Proposition A Funds, County and CIWMB Grants)
PREPARED BY: Kenneth Fernandez
PHONE: 336-4388
EXPLANATION: APPROVED B
DEPARTMENT: Development Services/
Engines 9iviion
See attached explanation.
FINANCIAL STATEMENT: APPROVED: `.&._ Finance
ACCOUNT NO. APPROVED: MIS
Project was funded by Account Numbers: 109-409-500-598-6035 (Gas Tax), 307-409-500-598-6035 (Prop A), 345-409-500-
598-6035 (Traffic Congestion Relief), 001-409-500-598-6171 (County Grant) and 296-409-500-598-6035 (CIWMB Grant) per
Resolution NO. 2009-191. Retention will be paid via Proposition A funds.
ENVIRONMENTAL REVIEW:
N/A
ORDINANCE: INTRODUCTION:
FINAL ADOPTION:
STAFF RECOMMENDATION:
Adopt the Resolution.
BOARD / COMMISSION RECOMMENDATION:
N/A
ATTACHMENTS:
11111. Resolution
2. Contract Final Balance
3. Notice of Completion
arm
Q.� U�v7\CN HO. 'a.0\D-\aZ
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone • 619-336-4229 fax
July 8, 2010
Mr. David Butler
Assessor / Recorder / County Clerk
County of San Diego
P.O. Box 121750
San Diego CA 92112-1750
Dear Mr. Butler:
We are submitting the following documents in duplicate for recording:
NOTICE OF COMPLETION: National City Street Resurfacing Project,
FY 09-10
Please note the recording information on the duplicate copy provided, and return
it to the Office of the City Clerk.
Michael R. Dalla, CMC
City Clerk
Enclosure