HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #24, #25 Marina Gateway Streetscape, FY 09-10*— CALIFORNIA �++ NATIONAL CITY aaQti HACORPOR TEE MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: !A new waterbox design at 23rd and Cleveland was needed to meet SWPPP requirements for the project since ;the existing trees at this location had to be removed. The old waterbox design is now obsolete and replaced with a new design via Change Order #23. The City of National City and Contractor agree to the following change to the original Contract: ;The Contractor shall not install the waterbox per line item #68, but rather per Change Order #23, and line item !#68 is deleted from the contract. Original Contract Amount CHANGE ORDER No. 24 July 23, 2010 $ 1,916,282.35 Net change by previously authorized Change Orders 40,482.06 Subtotal Amount of this change order New contract amount Working days added: 0 I Submitted by: ;City Engine Working days subtracted: 0 1,956,764.41 (2,000.00) $ 1,954,764.41 Percent change in Contract to date 2.01 % Date �% P : t a . Date CityManager,requiredforChangeOrders s2a4sss Date Wµ _ By signing this Change Order the Contractor confines that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein. rAccepted and agreed to by Koch -Armstrong: Z. Fra Herrera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380 „» CALIFORNIA -.e NATION:1 (�{(]) Orr ;CaC:J lr E MARINA GATEWAY STREETSCAPE Specification #08-16 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: _.__. CHANGE ORDER No. 25 August 17, 2010 The alley north of 23rd Street is in a serious state of disrepair. The contract only requires the contractor to repair the section of the alley where the rail was remove (center). This Change Order would repair both sides of ithe alley away from the rail for the full length and prevent water ponding. I The City of National City and Contractor agree to the following change to the original Contract: i For the alley from 23rd Street to the limits of the rail removal to the North, the Contractor shall layout grades for ;positive flow, excavate and prepare subgrade for the portion of the alley that was missing asphalt adjacent to the! (MSI parking stalls and pave 4” of C2 AC, grind the Westerem edge for a more uniform (level) surface, lay down la leveling AC course and then minimum 1" cap pave the entire length and width of the alley from 23rd to the !Northerly limits to provide a smooth even surface with positive drainage throughout. Original Contract Amount Net change by previously authorized Change Orders 38,482.06 Subtotal Amount of this change order New contract amount $ 1,969,281.10 Working days added: 0 $ 1,916,282.35 1,954,764.41 14,516.69 Submitted by: Working days subtracted: 0 Percent change in Contract to date 2.77% tt--Z6.-10 .................. Date -T ty Date LCiy Engineer Date !City Manager required for Change Orders >$24999 Date , By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to aH equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the orginal contract documents are incorporated herein, Accepted and agreed to by Koch -Armstrong: Frank Herrera, Project Manager Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephhone (619) 336-4380