Loading...
HomeMy WebLinkAbout2010 CON RBF Consulting - Supplemental Agreement 8th St Traffic Safety Enhancements ProjectDOCUMENT NAME: VENDOR NAME: DESCRIPTION: RESOLUTION #: FILE #: SCAN ENTRY SHEET ao\o Co- R4E ,';veQkF,\AttAAN\J AGRF r\ — \ )zH Ack QR�,�ti,G'C p\00t-\\O %J TRAFFtG 1-0A\.`1 Ni //A crd0\o-`..,% SIGNED AGREEMENT/CONTRACT: SIGNED RESOLUTION / CERT 1: A-200 + BACK-UP: LETTER / COPY TO VENDOR: COPY TO DEPARTMENT: JUOY ( t;NG ) FbP:WARpt,V C O P `I I. O C U \J \ V, A.C. 1 0 P� / SCAN: OCR: INDEX: FILED: DBASE: DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION 1243 NATIONAL CITY BOULEVARD, NATIONAL CITY, CA 91950 TEL: 619/336-4380 FAX: 619/336-4397 November 1, 2010 Tim Thiele, P.E. Project Manager RBF Consulting 5050 Avenida Encinas, Suite 260 Carlsbad, CA 92008 Subject: SUPPLEMENTAL AGREEMENT FOR CIVIL ENGINEERING SERVICES Project: NATIONAL CITY 8TH STREET SAFETY ENHANCEMENTS (J AVENUE TO PALM AVENUE) PROJECT This is a Supplemental Agreement to the original agreement dated July 20, 2010 (Resolution No. 2010-161) between the City of National City and RBF Consulting for Civil Engineering Services for the National City 8th Street Safety Enhancements (J Avenue to Palm Avenue) Project. This supplemental agreement provides for an additional not -to -exceed amount of $13,000.00 to provide additional traffic analysis and design per the scope of work defined in Attachment "A". Proposed Contract Amendment: $13,000.00 Revised Contract Amount: $159,863.00 Reviewed by: 2 /AA Stephen Mangan ello Date Traffic Engineer Accepted by: Tim Thiele, P.E. Consultant Project Manager Reviewed by: //�T Din Daneshfar, P.E. Date Principal Civil Engineer Approve b Date Maryam Babaki, P.E. Date Development Services Director / City Engineer ATTACHMENT A U . U CONSULTING JN: 55-100683.001 ADDITIONAL WORK REQUEST SUMMARY #1 8th Street Safety Enhancement Project Client: City of National City Work Requested By: Steve Manganiello Estimated Fee for Additional Work: $ 13,000 Summary of Additional Work: October 29, 2010 RBF Consulting will prepare a traffic impact assessment for the intersections and roadway segments from I Avenue to D Avenue and the intersections and road segments from Harbison Avenue to Palm Avenue. A three lane section will be evaluated for both of the two new study areas. Conceptual drawings will be provided to illustrate the recommended geometric conditions. For this study it is assumed that all existing conditions data including traffic counts, speed and accident information will be provided by the City of National City staff. Task 1. Technical Analysis and Conceptual Design for Harbison Avenue to Palm Avenue. Fee $4,750 RBF Consulting will prepare the arterial analysis for 8th Street from Harbison Avenue to Palm Avenue. Data for the intersections to be included in this analysis will be provided by City of National City. ADT volume and peak intersection volumes for as many intersections as possible will be beneficial for the arterial analysis; however the key information for the analysis will be the peak count data at all signalized intersections. A peak hour analysis will be preformed at 8th /Euclid only. RBF will prepare a conceptual design to illustrate the three lane alternative through this section. The segments will include striping improvements only. The conceptual design and technical analysis will be presented to the City in a technical letter within 5 business days of approval of this task. Task 2. Technical Analysis and Conceptual Design for D Avenue to I Avenue. Fee $8,250 Upon receipt of traffic volume from the City, RBF will conduct the intersection level of service analysis for the four new intersections in the expanded study area from E Avenue to I Avenue. In addition, RBF will prepare an arterial operational analysis for the corridor that will include D Avenue in order to capture the operational features of the existing signalized intersection at the western end of the study corridor. PLANNING • DESIGN ■ CONSTRUCTION 5050 Avenida Encinas, Suite 260, Carlsbad, California 92008-4386 • 760.476.9193 • FAX 760,476.9198 Offices located throughout California, Arizona 8 Nevada www.RBF.com RBF will review the concept plan prepared by KTU+A as part of the 8th Street Streetscape project and tie into their design to create a cohesive alignment. RBF will prepare a conceptual design to illustrate a two lane alternative with left turn lanes from D Avenue to Highland and a three lane alternative from Highland to I Avenue. The segments will include striping improvements only to convert 8th Street from four lanes to the two / three lanes alternative. RBF will review access to all existing side streets, u-turn and parking issues as part of the conceptual engineering of this section. During the preliminary design, RBF will conduct a field visit to assess any existing line of sight issues, parking concerns, queuing, or access issues. RBF will need work with the City, as necessary, to resolve any operational or line of sight issues that may be affected by the proposed reduction in lanes The Preliminary Design Plan will be submitted to the City for review in advance of finalizing the traffic assessment report for review and comment. The conceptual design and technical analysis will be presented to the City in a technical letter. Prepared By: Authorized By: Tim Thiele, Project Manager H:IPDATA155100683Admin\proposa11683AWR001 -Traffic Analysis.doc PLANNING ■ DESIGN ■ CONSTRUCTION 5050 Avenida Encinas, Suite 260, Carlsbad, California 92008-4386 • 760.476.9193 • FAX 760.476.9198 Offices located throughout California, Arizona & Nevada www.RBF_corn XNCORppp,AT> OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax RBF CONSULTING Supplemental Agreement 8th Street Safety Enhancements Project (J Avenue to Palm Avenue) Judy Hernandez (Engineering) Forwarded Copy of Agreement to Consultant