Loading...
HomeMy WebLinkAbout2010 CON Ohno Construction - Change Order #1 El Toyon Soccer Fieldt. CALIFORNIA • NATIONAL CITY. IscoapoRaTED El TOYON SOCCER FIELD Specification #07-01 Contractor: OHNO Construction Co. Reason/Purpose for this Change Order: Due to excellent bid prices and available funds the soccer/football field will be expanded 10 wider along the north side to provide for a wider playing field with a 10 foot buffer space on the outside of the playing field limit lines. This will add 3,800 square of synthetic turf surface. This additional work is at the direction of the City. CHANGE ORDER NO. 1 December 1, 2010 The City of National City and Contractor agree to the following change to the original Contract: The Contractor shall perform all of the work necessary to provide a 10 foot wider area along the entire north side) of the field in preparation of the installation of the synthetic turf field, including but not limited to clearing, grubbing, demolision of curbs, preparation of subgrade, installation of drainage and subgrade and all other work and coordination that may be required in accordance with the contract documents and to the satisfaction of Field'; Turf such that it is a finished product ready for the synthetic turf installation and there shall be no further cost to the City. See attachment for cost breakdown. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 4.25% Submitted by. / 440,642.00 / Z•- Date City; Pfoject 440,642.00 18,730.53 459,372.53 1177 ...................... . Date CIt'Enginee Da e City Manager, regwredfor Change orders4249 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accekted and agreed to by OHNO Construction: if(;) Name: l Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 t EL TOYON SOCCER PARK/ NATIONAL CITY CHANGE ORDER PROPOSAL CHANGE ORDER REQUEST: DESC: EXTEND FIELD 10' TO NORTH DATE: 11/30/2010 EXTRA CREDIT MATERIAL / EQUIPMENT (attach itemized quantity and unit cost, plus Tax) $8,442.20 $0.00 II LABOR (attach itemized hours and rates) $7,363.79 $0.00 III SUBTOTAL $15,805.99 $0.00 IV If subcontractor performed work, add Subcontractors overhead and profit to portions performed by it, not to exceed 15% if iten III, above. $0.00 $0.00 V SUBTOTAL $15,805.99 $0.00 VI General contractors overhead and profit not to exceed 15% of item V, if contractor performed the work. If sub- contractor performed the work, not to exceed 5% of item V. Of portions per- formed by contractor and subcontractor, portions perrformed by contractor shall not exceed 15% of itemV, and portion performed by subcontractor shall not exceed 5% of item V. $2,739.09 $0.00 VII SUBTOTAL $18,545.08 $0.00 VIII Bond and Liability insurance premium, if in fact additional bonds or insurance were actually purchased, not to exceed .02% of item VII. $185.45 IX TOTAL $18,730.53 GRAND TOTAL $18,730.53 Please add 5 working days to contract $0.00 $0.00 • CHANGE ORDER REQUEST: # 01 DATE: 30-Nov-10 CHANGE ORDER REQUEST CONTRACT BID # PW#06-13 EL TOYON PARK / NATIONAL CITY ADD 10' TO NORTH SIDE FIELD / REMOVE EXIST CURB PLEASE ADD 5 WORKING DAY(SWTO CONTRACT. 1 LABOR 2 MATERIAL 3 EQUIPMENT 4 SUBCONTRACTOR'S 5 SUBCONTRACTOR'S Totat cost MARKUPS 1 LABOR 2 MATERIAL 3 EQUIPMENT 4 SUBCONTRACTC 5 SUBCONTRACTC Total Mark Up's TOTAL BOND, INS. 20% 15% 15% 5% 5% 1% GENERAL $7,363.79 $6,202.20 $2,240.00 $0.00 $0.00 $15,805.99 $1,472.76 $930.33 $336.00 $0.00 _$0.00 - -_ ..._ $2,739.09 $18,545.08 $185.45 SUBCONTRAbT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10.00 $000 l TOTAL $7,363.79' $6,202.20 $2,240.00'. $0.00 $0.00 $15,805.99 $1,472.76 $930.33 $336.00 $0.00 �0.00 $2 739.09 $18,545.08 COST $18,730.53 $10.730.53 CHANGE ORDER REQUEST: * 01 NO ITEM QUANT -- CHANGE ORDER REQUEST 1.00 SUB SUB MAT Dump fee for concrete MAT LINER MAT REBAR/CONCRETE MAT DRAINAGE MATERIAL MAT PERM AGGITON description L-FOREMAN L-OPERATOR L-LABOR L-TRUCK DRIVER L-LABOR C Excavator120 E-KABELCO 210 EXC E-LOADER 644 E-CAT D5-H DOZER E-BOMAG ROLLER E-CASE ROLLER E- LOADER 624 E-TRENCHER P-COMPACTOR SUBS ADD 10' TO NORTH SIDE FIELD 1 REMOVE EXIST CURB UNIT TOT LAB EQ MAT SUB $0.00 $1,363.79 $2,240.00 $6,202.20 80.00 $0.00 LS 0.5 EA/SHIFT t 0.00 1 $1.00 $0.001 total sub $ 1 __ ._ 0.09 1 $0.00 $0.091 $0.00 2 250 1 $0.00 $500.00 1 2400 1 _ $0.00 $2,400.00 y 1 850 1 $0.00 $850.00 total mat $ 80 21.59 1 $0.00$1,727.20 $6,202_20 . J used shifts hrs/shift ratemr total dollars 3 1 8-...... $73.03 $1,752.75 3 1 8 $64.68 $1,552.26 9 1 8 $49.22 $3,543.98 1 1 8 $64.35 $514.80 total labor $ 0 1 8 $48.38 $0_00 _$T 263.79__ 1 1 8 $85.00 $680.00 0 1 8 $95.00 $0.00 1 1 8 $75.00 $600.00 1.5 1 8 $65.00 $780.00 1 1 4 $45.00 $180.00 0 1 8 $45.00 $0.00 0 1 8 $65.00 $0.00 0 1 8 $45.00 $0.00 total oq.$ 1 8 $1500$0.004,240.00 LS CALIFORNL4 KLI rpCORi.ORATty OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax OHNO CONSTRUCTION Change Order #1 Construction Improvements for El Toyon Soccer Field Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor