HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #2 Drainage Improvements FY 10-11CALIFORNIA NA IONAL C t ''y /NcoRPORRTE DRAINAGE IMPROVEMENTS PROJECT Specification #10-03 Contractor: Koch -Armstrong General Engineering, Inc. CHANGE ORDER No. 2 November 19. 2010 Reason/Purpose for this Change Order: The cross -gutter at 8th st & D ave was originally included in Drainage Improvements Project FY 10-11, Spec 10 03. However, we found out that this particular cross gutter will be removed and replaced as a part of another project in the near future. The city is therefore removing the cross gutter at 8th & D from the Drainage Improvement Project FY 10-11, Spec 10-03. After removing this cross gutter extra funds have been made available to perform more work. As a result city has decided to add Bid Alternate #1 and Bid Alternate #2 to the project to use the extra funds available. The additive alternates are to be done by the contractor for the same price that was bid on the base bid per every related line item. I The City of National City and Contractor agree to the following change to the original Contract: Remove: Cross Gutter located at 8th & D IAdd: Additive bid alternate #1 and additive bid alternate #2 located respectively at 16th & Wilson and 20th & Wilson. Original Contract Amount $ 90,993.60 Net change by previously authorized Change Orders 1,010.00 Subtotal Amount Deducted (8th & D cross gutter) Amount Added (Bid Alt #1, Bid Alt #2) Amount of this change order 92,003.60 (15,710 00) 21,080.00 5,370.00 New contract amount $ 97,373.60 Working days added: 0 Working days subtracted Submitted by: tiV`t1° Project Coordinator Date Approved by: 1.242/1u Date 0 Percent change in Contract to date 7.01% Reviewed By: Project Manager City Manager, required for Change Orders >$24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment Accepted and agreed to b Koch -Armstrong General Engineering, Inc.: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 a The quantities listed in the Bid Sheet(s) are provided to give a general indication of the scope of the work and for the comparison of bids. No warranty is made; either expressed or implied, that the actual quantities of work to be done will correspond therewith. (See Instructions to Bidders, Item 15, and Special Provisions, Part One, Section 2-1-1) NOTE: The successful bidder will be required to submit a Schedule of Values breaking the work into individual detailed work elements and their associated costs if directed by the City Engineer or his/her representative. All costs listed in the Schedule of Values will sum to the Contract Amount_ if the successful bidder does not intend on submitting for partial payments, a Schedule of Values will still be required if directed by the City Engineer or his/her representative. ADDITIVE BID ALTERNATE #1 Drainage Improvement at E 16'" St and Wilson Ave: 'Ay aim Remove and Replace Cross Gutter (G-12) Remove and Replace Pedestrian Ramps (G-29) with truncated domes (G-30) TOTAL OF ADDITIVE ALTERNATE #1: (written word amount) nine_ hurlc SAME AS BI LINE ITEM vti SAME AS' BID LINE ITEM 83 d �\ll t rlZoo, cc. x� 3700,00 Dollars and - (0 Cents The City may or may not award any or part of ADDITIVE BID ALTERNATE #1 at its own discretion_ The contractor agrees by submitting this bid that the unit price shown above for ADDITIVE BID ALTERNATE #1 is sufficient for any quantity of up to 125% of the unit amount indicated at E 16`" St and Wilson Ave. 19 ADDITIVE BID ALTERNATE #2 Drainage Improvement at E 20th St and Wilson Ave: E ''�yl± Ci•.Y.9- y.] TE+ 4- NIBS T T v,i `5- D%I NIT 'z; PI -,-El, - 1fV�T r3 .'4:. tR�. Remove and Replace Cross Gutter (G-12) SF 720 SAME AS BID( LINE ITEM # (P4 gOe CO Remove and Replace Pedestrian Ranips (G-29) with truncated domes (G-30) EA ) SAME AS BID LINE ITEM #3 .3700, 00 TOTAL OF ADDITIVE ALTERNATE #2: en-1-hcu_ rd one he r (written word amount) ollars and Cam--/ D Cents The City may or may not award any or part of ADDITIVE BID ALTERNATE #2 at its own discretion- The contractor agrees by submitting this bid that the unit price shown above for ADDITIVE BID ALTERNATE #2 is sufficient for any quantity of up to 125% of the unit amount indicated at E 20th St and Wilson Ave. THE LOWEST BIDDER WILL BE DETERMINED BY THE BASE BID AMOUNT ONLY. NOTE: All base and alternate bid amounts shall include any and all costs associated with Contractor's general conditions, profit and overhead, bonds, fees and any applicable taxes. to case of a discrepancy between words and figures, the words shall prevail- 20 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax December 7, 2010 Mr. Monty Koch President Koch -Armstrong General Engineering, Inc. P.O. Box 1190 Lakeside, CA 92040 Dear Mr. Koch, On November 19th, 2010, Change Order #2 to a Contract was entered between Koch -Armstrong General Engineering, Inc. and the City of National City. We are enclosing for your records a fully executed original Change Order. Michael R. Dalla, CMC City Clerk Enclosure cc: Engineering Dept.