Loading...
HomeMy WebLinkAbout2010 CON Ohno Construction - Change Order #2 El Toyon Soccer FieldtFORNiA m° AL Clry wcnr(paxnresr El TOYON SOCCER FIELD CHANGE ORDER NO. 2 Specification #07-01 December 1, 2010 Contractor: OHNO Construction Co. Reason/Purpose for this Change Order: Due to new information gathered on the existing sewer main beneath the soccer field, it was determined that the 'new main can be relocated from under the field. The new alignment and grades are designed and delivered to ,the contractor. The City and contractor agree that the new sewer alignment will be done at existing line item ;prices for actual quantities places. The City of National City and Contractor agree to the following change to the original Contract The Contractor shall perform all of the work necessary to install the new sewer main, laterals, manholes and connections per the drawing attached as exhibit "B". The change in quantities shall be those actually placed in the field and are represented on attachment A. The City and contractor agree that the contractor will be paid in accordance with the bid prices for each line item actually placed in the field and there shall be no deduction or addition to any line item or otherwise for the work completed. Further the new alignment allows for the installation of the new main to be done without pumping. In exchange, the contractor will upgrade the sewer main from 10" PVC to 12" PVC at no additional cost to the City. All work shall conform to the contract documents. The amount shown on this change order is for estimate purposes only. The actual changes to quantities shall be shown on the respective line items and shall be paid accordingly. Original Contract Amount $ 440,642.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Submitted by: Pro1ec Appr Working days subtracted: 0 CZ._!S_(a Date 12-1 V.--1 O -Ci-Engineer Date 'City Manager, required for Change Orders >s24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, leans and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. 18,730.53 459,372.53 10,973.70 Percent change in Contract to date 6.74% 470, 346.23 Acc pted and agreed to by OHNO Construction: Name:', i Date Note to C\Ontractoi: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim, originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 —. CALIFORNIA --, IO AL (i :1.,J'J MCPRYORAT EL TOYON SOCCER FIELD Specification #07-01 CHANGE ORDER #2, Attachment "A" NO. ITEM DESCRIPTION UNTIS QTY PRICE EXTENSION 14 Replace existing 10" sewer main LF 489 $ 55.30 $ 27,041.70 15 Replace existing 8" sewer main LF 30 $ 52.60 $ 1,578.00 16 Connection to existing sewer main EA 3 $ 1,370.00 $ 4,110.00 17 Replace existing sewer lateral with 6" PVC LF 275 $ 42.30 $ 11,632.50 18 Replace existing manholes EA 2 $ 9,000.00 $ 18,000.00 19 Install 6" sewer lateral cleanout EA 3 $ 500.00 $ 1,500.00 Subtotal $ 63,862.20 NO. ITEM DESCRIPTION UNTIS QTY PRICE EXTENSION 14 Replace existing 12" sewer main LF 578 $ 55.30 $ 31,963.40 15 Replace existing 8" sewer main LF 0 $ 52.60 $ - 16 Connection to existing sewer main EA 2 $ 1,370.00 $ 2,740.00 17 Replace existing sewer lateral with 6" PVC LF 275 $ 42.30 $ 11,632.50 18 Replace existing manholes EA 3 $ 9,000.00 $ 27,000.00 19 Install 6" sewer lateral cleanout EA 3 $ 500.00 $ 1,500.00 Subtotal $ 74,835.90 Subtotal for original contract $ (63,862.20) Change Order Estimate $ 10,973.70 * All quantities listed are approximate. Contractor will be paid only for work actually peformed and accepted by the City. **All listed prices are approximate and listed only for purposes of obtaining estimate. Contractor will be paid only for work actually performed and accepted by the City. OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax OHNO CONSTRUCTION Change Order #2 El Toyon Soccer Field Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor