HomeMy WebLinkAbout2010 CON Koch Armstrong - Change Order #3, #4 Drainage Improvements FY 10-11DRAINAGE IMPROVEMENTS PROJECT Specification #10-03 Contractor: Koch -Armstrong General Engineering, Inc. CHANGE ORDER No. 3 December 10, 2010 Reason/Purpose for this Change Order: In order to match the existing asphalt with the cross gutter and make the transition of asphalt to cross gutter a smooth transition, a larger section of AC pavement should be removed and replaced. The following location will require a wider section of AC pavement to be removed and replaced: 21 st & F. The removal and replacement of AC Pavement will be done for the same price as line item # 8 at a price of $3.5 per Square Foot. The City of National City and Contractor agree to the following change to the original Contract: At 21st & F: 5 feet of AC removal and replacement on the 21st (East side) and 2 feet on F (West side) for a total of 5"37'=185SF and 2'*80'=160SF. Total =345SF Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount Deducted Amount Added Amount of this change order 90,993.60 6,380.00 97,373.60 1,207.50 1,207.50 New contract amount $ Working days added: 0 Working days subtracted: 0 Submitted by: I` - Project Coordinator Date Approved by: �...� c3tl ;City Manager, required for Change Orders>$24,999 Date Percent change in Contract to date 8.34% Reviewed By: anager 98,581.10 By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. 11 this Change Order is approved, Contractor will provide all of the equipmen Accepted and agreed to by Koch -Armstrong General Engineering, Inc.: .......... K rn2- .2ccyckmakoavA— Date: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 DRAINAGE IMPROVEMENTS PROJECT Specification #10-03 Contractor: Koch -Armstrong General Engineering, Inc. CHANGE ORDER No. 4 December 23, 2010 Reason/Purpose for this Change Order: The purpose of this change order is to add quantities of base to the drainage improvements project that was needed to replace unsuitable subgrade The City of National City and Contractor agree to the following change to the original Contract: All Locations: 72.62 Tons of base at $46.00 per Ton Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount Deducted Amount Added Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Subm/tted by: Project Coordinator Date ity Engineer Da e 101, 921.62 90,993.60 7,587.50 98,581.10 3,340.52 3,340.52 Percent change in Contract to date 12.01% Reviewed By: oject Manager City Manager, required Ian Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipmen Accepted and agreed to by Koch -Armstrong General Engineering, Inc.: /2-23--0 Date: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 MCOR12011ATED OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax KOCH-ARMSTRONG GENERAL ENGINEERING Change Order #3 and #4 Drainage Improvements Project Judy Hernandez (Engineering) Forwarded Copies of Change Orders to Contractor