December 16. 2010
Ehab Gerges, P.E.
Harris & Associates
750 B Street, Suite 1 800
San Diego, CA 92101
Subject:
Project:
ENGINEERING DEPARTMENT
1243 NATIONAL CITY BOULEVARD, NATIONAL CITY, CA 91950
TEL:619/336-4380 FAX:619/336-4397
SUPPLEMENTAL AGREEMENT FOR CIVIL ENGINEERING
SERVICES
NATIONAL CITY 8TII STREET SMART GROWTH
REVITALIZATION PROJECT
This is a Supplemental Agreement to the original agreement dated March 2, 2010
(Resolution No. 2010-28) between the City of National City and Harris & Associates for
Civil Engineering Services for the National City 8" Street Smart Growth Revitalization
Project. This supplemental agreement provides for an additional not -to -exceed amount of
$39,531.00 to provide utility undergrounding design and coordination for the project per
the scope of work defined in the Attachment.
Proposed Contract Amendment: $39,531.00
Revised Contract Amount: $344,745.00
Reviewed by:
/44
Stephen Manganfllo Date
Traffic Engineer
Acc
6 No
erges P.E. Date
Consultant Project Manager
Reviewed by:
//y
in Daneshfar, P.E. Date
Principal Civil Engineer
Approved b
rya ' :.. . ' • _ Date
City Engineer
Harris & Associates,.
Shaping the Future, One Project at a Time
December 15, 2010
Mr. Stephen Manganiello
City Traffic Engineer
City of National City
1243 National City Boulevard
National City, CA 91950
Subject: 8`h Street District 24 20A Conversion, in the City of National City
Dear Steve,
Harris & Associates appreciates the opportunity to present this proposal to provide additional
professional services to assist the City with the subject project. The following presents the our project
understanding, scope of services and fees.
PROJECT UNDERSTANDING
The City of National City is taking the lead in designing and constructing the joint trench associated
with 8th Street District 24 20A conversion project (Project). The Project is limited to providing
trenching, backfill, substructures, conduit and pertinent work (Trenching Items of Work). All cabling
and equipment installation design and construction work will be performed by SDG&E and the
respective utility companies. Our proposed scope of work for this phase of the project is to assist the
City with reviewing SDG&E and utility companies' plans to verify conflicts with existing field
conditions, and prepare a utility composite plan.
Our scope of work is limited to the items outlined in the scope of services below and our estimated
effort as broken down in our proposed fees.
Scope of Services
1.1 Review Meetings
We will schedule and attend meetings with SDG&E, AT&T and Cox Communications to obtain each
utility's final designs and agreements. We will also verify accuracy of design and cost methodology
and rule application to discuss project issues and obtain feedback. Six (6) coordination meetings are
included in the scope of this proposal. Copies of meeting minutes will be provided to the City.
1.2 Topographic Survey
Our sub -consultant, Right -of -Way Engineering Services, Inc. will establish record street right-of-way
and a center line survey for the additional survey beyond the 8th Street Improvements project limits
(east of D Avenue to Highland Avenue)
750 B Street, Suite 1800 San Diego, California 92101 619.236.1778 FAX 619.236.1179 sandiego@hams-assoc.com
December 15, 2010
Steve Manganiello
Page 2 of 3
1.3 Base Mapping
Utilizing the aerial topographic survey obtained previously and survey data obtained in the Task 1.2,
we will prepare base maps for the additional areas east of D Avenue to and on Highland Avenue.
Base maps will be prepared in plan only formats.
Base maps will include roadway center line, right-of-way, manholes, valves, water meters, all visible
utility boxes, above and underground utilities. All base maps will be prepared in AutoCAD.
1.4 Utility Mapping
Obtain and plot all underground utilities within the additional project limit within the 8th Street
District 24 conversion boundary. Additional notification to all wet utilities within the conversion
boundary will also be conducted.
1.5 Site Analysis
1. Overlay the current SDG&E plans (dated 10/4/07), AT&T and Cox trench, conduit and
substructure designs onto base maps to use a reference document to review the 8th street
Improvements civil plans, electric design and existing field conditions conflicts.
2. Visit project site to identify existing utility systems, probable source locations, and potential
contractor constraints. Photograph areas of significance including private property impacts
associated with the current and new utility service routes and meter locations.
3. Visit each property affected by the undergrounding to determine the service trench route on
private property as well as determine the modifications to the service panel needed to accept
underground electric service.
4. Identify any incompatible issues from our field findings between the utility company designs, the
8th street Improvements civil plans, and the field conditions.
1.6 Utility Composite
1. Utilizing the current SDG&E electric trench, conduit and substructure design, the AT&T design,
and Cox design, prepare a composite exhibit utilizing the base maps.
2. Re -draft the current SDG&E electric Trenching Items of work design on the base maps replicating
typical SDG&E design and appearance. This re -drafted design will then be provided to SDG&E
for their approval and use to have SDG&E's design confouui to the current base map and 8`h Street
Improvements plans.
3. Coordinate with SDG&E for their final engineering modifications to the electric Trenching Items
of Work design, and cable and hardware design, DBL material listing and quantity sheets, and
Rule 20A agreements.
4. Utilizing the pictures taken during our site review, create an exhibit that can be attached to the
Utility Composite reflecting the locations and description of the potential issues associated to the
Harris & Associates..
December 15, 2010
Steve Manganiello
Page 3 of 3
private property impacts that are likely to occur during the installation of the utility services and
new meter locations.
FEES
Harris & Associates proposes to provide the above services for the total "not -to -exceed" fee of
$39,531. A breakdown of the proposed fee is presented for your information and use in evaluating
this proposal. Our services would continue to be invoiced monthly based on the actual hours of work
completed. Our services would be accomplished per our existing agreement with the City, and all
terns and conditions would be as stated therein.
ASSUMPTIONS / INFORMATION REQUESTED
• SDG&E to provide: 1) Trench, conduit, and substructure design; 2) Electric Cable and Hardware
design.
• Utility composite and proposed revisions to SDG&E electric trench, conduit, and substructure
design are to be reviewed and approved by SDG&E. SDG&E will make all necessary revisions to
the cable and hardware design including voltage drop, flicker, pulling calculations to their
preliminary design plans.
• Potholing of existing utilities is not included in the scope of this proposal.
Sincerely,
Harris & Associates
Ehab Gerges, PE
Vice President
Cc: Bob Sutherlin, Harris & Associates
Dan Lee, Harris & Associates
Harris & Associates,
HARRIS & ASSOCIATES
City of National District 24 20A Conversion
Fee Proposal
Harris & Associates
Sub- Consultants
Task/Subtask
Javid
$I90
Ehab G.
$190
Bob
$169
DE
$125
TECH
$90
Butsko
ROW
Subtotals
t.1 Review Meetings
6
16
$3,025
$7,205
1.2 Topographic Survey
4
$3,500
$3,860
1.3 Base Mapping
24
$2,160
1.4 Utility Mapping
4
60
$6,076
1.5 Site Analysis
16
24
$4,400
$8,560
1.6 Utility Composite
8
$10,670
$11,670
Subtotal Hours =
6
16
4
24
112
Subtotal($)=
$1,140
S3,040
$676
$3,000
$10,080
$18,095
$3,500
$39,531
Total Hours by Classification =
6
16
4
24
112
162
Total ($) by Classification =
$1,140
$3,040
$676
$3,000
$10,080
$18,095
$3,500
Percentage of Time Allocated (by hours) =
4%
10%
2%
15%
69%
$39,531
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone • 619-336-4229 fax
HARRIS & ASSOCIATES
Supplemental Agreement #2
8th Street Smart Growth Revitalization Project
Judy Hernandez (Engineering) Forwarded
Copy of Supplemental Agreement to Consultant