Loading...
HomeMy WebLinkAbout2011 CON Ohno Construction - Change Order #4 El Toyon Soccer FieldEl TOYON SOCCER FIELD Specification #07-01 Contractor: OHNO Construction Co. (Reason/Purpose for this Change Order: After completing the widening of the field to the North it became evident that this would result in depressed area outside the field in the northeast corner that would not drain properly. This change is work adds a drain for that area and pipe to the existing 60" storm drain. Additionally, the grass area to the south on the east side also has an area that has a small depressed area that cannot be effectively graded to drain and requires a similar drain and pipe. «•, CALIFORNIA r« NATION CITY Ixcosroa*Tso CHANGE ORDER NO. 4 January 19, 2011 1 The City of National City and Contractor agree to the following change to the original Contract: ;The Contractor shall install 140 feet of 6" SDR 35 PVC drain pipe from the existing 60" storm drain to the new 1 12" PPC concrete area drain with metal grate (Brooks, or equal) located 10 feet from the northeast corner of the !soccer field and 20 feet of 6" SDR 35 PVC drain pipe from the existing area drain southeast of the soccer field to the north to a new 12" PPC concrete area drain with metal grate (Brooks, or equal) located 15 feet from the 1DG south of the soccer field. All locations of new drains and pipe to directed by the Field Engineer. Lump sum !price shall include all materials, labor, equipment, overhead, profit, bond, insurance and any other costs associated witht the complete installation of the drain systems per Greenbook specifications and directions of the Field Engineer and there will be no other costs to the City. Original Contract Amount $ 440,642.00 Net change by previously authorized Change Orders... Subtotal... Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 36.96% Submitted by: ............................ Date !City Projec Manager f/ ' Ala/1.�........I r City Engin 7 Dat City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Cohtractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to • provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. 159,161.20 599, 803.20 3,700.00 603,503.20 Date A epted and a. reed to b OHNO Construction: Date rector:,f you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proce under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 FORNIA -« NAlIOryc�((�� Cs Ty ro EL TOYON SOCCER FIELD Specification #07-01 CHANGE ORDER #4, Attachment "A" DESCRIPTION UNITS QTY UNIT PRICE EXTENSION 1 Install 6" SDR 35 PVC Pipe LF 160 $ 20.00 $ 3,200.00 2 Install 12" Concrete Brooks area drain EA 2 $ 250.00 $ 500.00 Lump Sum Price $ 3,700.00 All quantities listed are approximate. The price represent a lump sum price for the required work. OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone 619-336-4229 fax OHNO CONSTRUCTION Change Order #4 El Toyon Soccer Field Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor