Loading...
HomeMy WebLinkAbout2011 CON Dokken Engineering - Amendment #6 Plaza Blvd. WideningAMENDMENT TO AGREEMENT BETWEEN THE CITY OF NATIONAL CITY AND DOKKEN ENGINEERING This Amendment to Agreement is entered into this 17th day of May 2011, by and between the City of National City, a municipal corporation ("the CITY"), and Dokken Engineering (the "CONSULTANT"). RECITALS A. The CITY and the CONSULTANT entered into an agreement on the Street Widening Improvements on Plaza Boulevard from Highland to Euclid Avenues ("the Agreement") wherein the CONSULTANT agreed to provide Civil Engineering and Right -of -Way Acquisition Services. B. An Amendment in the not -to -exceed amount of $20,000 was approved on April 21, 2009 to provide as -needed staking work for individual properties. C. An Amendment in the not -to -exceed amount of $55,000 was approved on July 21, 2009 to provide additional work to perform right of way acquisition services for seven more appraisals of properties impacted by the widening project. D. An Amendment in the not -to -exceed amount of $42,800 was approved on January 5, 2010 to redesign the area located in the state right of way to eliminate the need for tie -back retaining walls. The changes were due to Caltrans request. E. An Amendment in the not -to -exceed amount of $42,200 was approved on May 5, 20I 0 to provide additional work due to the extended time for negotiations required to obtain right of way. F. An Amendment in the not -to -exceed amount of $21,092 was approved on November 8, 2010 to to secure Right of Way for the Plaza Boulevard Widening Project. The additional work has been generated by the extended time for negotiations required to obtain the Right of Way G. This amendment is needed for additional work to assist City with work associated with the Plaza Boulevard Rule 20A conversion project. The additional work will consist of reviewing SDG&E and the utility company's plans to verify conflicts with existing field conditions, and prepare construction documents to allow the City to bid the joint trench portion of the Project. The parties desire to amend the Agreement to perform the additional work (See attached Exhibit A). NOW, THEREFORE, the parties hereto agree that the Agreement entered into on November 21, 2006, with its amendments shall be amended by $42,655 (Not -to -Exceed). The parties further agree that with the foregoing exception, each and every term and provision of the Agreement dated November 21, 2006, shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first above written. CITY OF NATIONAL CITY Recommended for Approval by: Maam Babaki, Development Services Director DOKKEN ENGINEERING By: Mark Tarrall, Project Manager Approved by• By: ,e3 C Chris Zapata, it anager Cathy Chan, `-cre ary EXHIBIT A March 1, 2011 Din Daneshfar, P.E. Department of Public Works 1243 National City Boulevard National City, CA 91950-4301 Subject: Additional Work Needed to Perform Utility Coordination Services for Plaza Boulevard Widening Project Dear Mr. Daneshfar, This letter provides a request for a budget amendment for Dokken Engineering (DE) for the items of work summarized below. The City of National City is taking the lead in coordinating and constructing the joint trench associated with the Plaza Boulevard Rule 20A conversion project on Plaza Blvd between Palm Ave and I-805 (Project). The Project is limited to providing trenching, backfill, substructures, conduit and pertinent work (Trenching Items of Work). All cabling and equipment installation design and construction work will be performed by SDG&E and the respective utility companies. Our proposed scope of work is to assist the City with reviewing SDG&E and the utility company's plans to verify conflicts with existing field conditions, and prepare construction documents to allow the City to bid the joint trench portion of the Project. Our scope of work is limited to the items outlined in the scope of services below and our estimated effort as broken down in our proposed fees. Scope of Supplemental Work 1.1 Review Meetings Consultant will schedule and attend meetings with SDG&E, AT&T and Cox Communications to obtain each utility's final designs and agreements. We will also verify the accuracy of design and cost methodology and rule application to discuss project issues and obtain feedback. Six (6) coordination meetings are included in the scope of this proposal. Copies of meeting minutes will be provided to the City. 1.2 Site Analysis 1. Butsko Utility will overlay the current SDG&E plans, AT&T and Cox trench, conduit and substructure designs onto base maps to use as a reference document to review the Plaza Boulevard improvements civil plans, electric design and existing field conditions conflicts. 2. Butsko Utility will visit project site to identify existing utility systems, probable source locations, and potential contractor constraints. Photograph areas of significance 5675 Rufin Read; Suite 2511, San Diego, CA 92123 a T'cic: 85S.514.8377 Pas: 858.574 8608 W W W.dokkcncnginecring,coin including private property impacts associated with the current and new utility service routes and meter locations. 3. Butsko Utility will visit each property affected by the undergrounding to determine the service trench route on private property as well as determine the modifications to the service panel needed to accept underground electric service. 4. Butsko Utility will perform a conflict check with each utility company's designs, Dokken's Plaza Boulevard improvement plans, and the findings from the field conditions. 1.3 Utility Composite 1. Utilizing the current SDG&E electric trench, conduit and substructure design, the AT&T design, and Cox design, Butsko Utility will prepare a composite exhibit utilizing the base maps. 2. Butsko Utility will Re -draft the current SDG&E electric Trenching Items of Work design on the base maps replicating typical SDG&E design and appearance. This re -drafted design will then be provided to SDG&E for their approval and use to have SDG&E's design conform to the current base map and Plaza Boulevard Improvements plans. 3. Butsko Utility will coordinate with SDG&E for their final engineering modifications to the electric Trenching Items of Work design, and cable and hardware design, DBL material listing and quantity sheets, and Rule 20A agreements. 4. Utilizing the pictures taken during our site review, Butsko Utility will create an exhibit that can be attached to the utility composite reflecting the locations and description of the potential issues associated to the private property impacts that are likely to occur during the installation of the utility services and new meter locations. 1.4 Preliminary Construction Cost Estimate Butsko Utility will prepare one dry utility probable construction cost estimate taking into consideration Trenching Items of Work, with the assumptions as determined or directed by the City. 1.5 SDG&E, AT&T, Cox Communications Reimbursement Agreement Coordination Butsko Utility will coordinate with SDG&E, AT&T and Cox Communications and the City of National City to review reimbursement agreements for the value of the joint Trenching Items of Work. Butsko Utility will conduct meetings and discussions with each utility with the goal of achieving an acceptable reimbursement agreement and amount with each utility based upon our cost estimates and the proposals received from the bidding trenching contractor. 1.6 Bidding Assistance Butsko Utility will remain available during -biddi ig to assist the City with attendance of pre -bidding meeting; address contractors' RFI's and prepare Addendums. The services are limited to the estimated fee for this task. Services provided during construction are not included in the scope of this proposal. 1.7 Cable Television Planning and Design Butsko Utility will provide planning and design for the cable television trench, conduit and substructure system. The design and engineering for the cable and/or fiber systems will be completed by the cable system operator separately. 1.8 City Improvement Plan Ujpdate Dokken Engineering will update the Plaza Boulevard City Plans to reflect the improvements in the Butsko Utility Composite. 1.9 Coordination and Project Management Dokken Engineering will provide the existing Plaza Boulevard design and base mapping and coordinate all roadway design requirements with Butsko Utility. Dokken Engineering will provide additional project management required for Butsko Utility's work. ASSUMPTIONS / INFORMATION REQUESTED • SDG&E to provide: 1) Trench, conduit, and substructure design; 2) Electric Cable and Hardware design. • Utility composite and proposed revisions to SDG&E electric trench, conduit, and substructure design are to be reviewed and approved by SDG&E. SDG&E will make all necessary revisions to the cable and hardware design including voltage drop, flicker, pulling calculations to their preliminary design plans. • Potholing of existing utilities is not included in the scope of this proposal. Proposed Scope of Work — Supplemental Work Fee Summary Butsko Utility Design, Inc. Hours Per Task Principal Project In Charge Manager Designer $135/hr $110/hr $90/hr Cost Task 1.1 Review Meetings 10 15 - $3,000 Task 1.2 Site Analysis 40 - $4,400 Task 1.3 Utility Composite 15 75 5 $10,725 Task 1.4 Preliminary Construction Estimate 30 18 $6,030 Task 1.5 Reimbursement Agreement 44 - - $5,940 Task 1.6 Bidding Assistance 6 15 - $2,460 Task 1.7 Cable TV Planning and Design Included Reimbursables $2,000 TOTAL, NOT TO EXCEED $34,555 Dokken Engineering Task 1.1 Review Meetings $2,700 Task 1.8 City Improvement Plan Update $2,700 Task 1.9 Coordination and Project Management $2,700 TOTAL, NOT TO EXCEED $8,100 Sincerely, DOKKEN ENGINEERING TOTAL, NOT TO EXCEED $42,655 Accepted and Approved by: Mark Tarrall, P.E. Din Daneshfar, P.E. Consultant Project Manager City Project Manager FEE PROPOSAL - Plaza Blvd Widening - Amendment 5 Dokken Engineering DIRECT COSTS (LABOR NAME FUNCTION HOURS RATE AMOUNT Mark Tarrall, PE Project Manager 30 $50.00 $1,500.00 Mark Firger, PE Design Manager (Roadway) 30 $45.00 $1,350.00 TOTAL HOURS INDIRECT COSTS (OVERHEAD) OVERHEAD 60 TOTAL 158.00% $2,850.00 T COSTS Billed at Actual Cost TOTAL OVERHEAD $4,503.00 ITEM QUANTITY UNIT UNIT COST AMOUNT Reproduction 1 LS - - FEE (PROFIT) PERCENTAGE 10% $0.00 FEE $735.30 DOKKEN ENGINEERING TOTAL COST $8,100.00 DOKKEN E NC t N E•r:n TN xnn ao L).on.•_;1 �t: rin C.com Plaza Blvd Widening - Amendment 5 (FY 10/11) Dokken Engineering Project Manager Design Manager (Roadway) o Iii Task 1.1 Review Meetings 10 10 20 Task 1.8 City Improvement Plan Update 10 10 20 Task 1.9 Coordination and Project Management 10 10 20 TOTAL HOURS - TASK 9 301 30 0 60 HOURLY RATE $50.00 $45.00 $0.00 TOTAL DIRECT LABOR $1.500.00 $1,350.00 $0.00 $0.00 $2,850.00 TOTAL MULTIPLIERS $2 370 A0 $2,133.00 $4,503.00 TOTAL FEES $387.00 $348.30 $0.00 $735.30 DIRECT COSTS TOTAL COST - TASK 9 $4,257.00 $3,831.30 $0.00 $8,088.30 TOTAL PROJECT HOURS 30 30 0 60 TOTAL DIRECT LABOR $1,500.00 $1,350.00 $0.00 $2.850.00 TOTAL MULTIPLIERS $2,370.00 $2,133.00 $0.00 $4.503.00 DIRECT COSTS $0.00 TOTAL, NOT TO EXCEED PROJECT COST $4,257.00 $3.831.30 $0.00 $8,088.30 EXHIBIT B ESTIMATED PROJECT PLANNING SCHEDULE PLAZA BOULEVARD RULE 20A PROJECT - CITY OF NATIONAL CITY DOKKEN ENGINEERING Weeks hj Tusk 1 I I 3 I 4 I 5 I 6 1 7 I 8 9 1 10 Task I . I Review Meetings (6) AT REQUEST OF CLIENT Task 12 Site Analysis I week Task 13 Utility Composne Exhibit/SDG&E Drafting Niodications 3 weeks Task 1.4 Preliminary Cost Estimate and Summary Report 2 weeks Task 1.5 S DCi&E. AT&T, and Cos Communication Coordination i Reimbursement Agreement Coordination . . 6 weeks Task 1.6 Bidding Assistance Included within Task 3.5schedule Task 1.7 Cable Television Planning & Design Concurrent with "task 1.3 TOTAL ESTIMATED PROJECT DURATION: In weeks *This schedule assumes timely receipt of project base drawings, utility compan> AutoCAD base tile availability and client meetin_s. D1:E010°01 (REV21 Pape ' of G Pebruan- la. 201I OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone / 619-336-4229 fax DOKKEN ENGINEERING Amendment #6 Plaza Blvd. Widening Judy Hernandez (Engineering) Forwarded Copy of Agreement to Consultant