SUPPLEMENTAL AGREEMENT FOR "ON -CALL"
PROFESSIONAL ENGINEERING SERVICES
8TH STREET SEWER REPLACEMENT DESIGN
Project Professionals Corporation is authorized to begin work on the aforementioned
project in the not -to -exceed amount of $18,631.00. The services provided will be
accomplished per the existing agreement dated October 5, 2010 (Resolution No. 2010-
225) between the City of National City and Project Professionals Corporation for "On -
Call" Professional Engineering services. This project is considered to be within the scope
of services and budget of the "On -Call" agreement.
Please direct any questions and all submittals to Stephen Manganiello, Traffic Engineer
(619-336-4382).
Sincerely,
Maryam Bai. ., ..
Development Services Director / City Engineer
Attachment — Scope of Work & Fee Schedule
Engineering Department
1243 National City Boulevard, National City, CA 91950-4301
619/336-4380 Fax 619/336-4397 www.nationalcityca.gov
PROJECT PROFESSIONALS CORPORATION
May 10, 2011
Maryam Babaki, Director of Development Services/City Engineer
City of National City
1243 National City Blvd.
National City, CA 91950
RE: Proposal for Professional Services
8th Street Sewer Replacement Design
Dear Maryam,
I am submitting this proposal per your request to provide professional engineering services for
the design of the replacement of the existing sewer main and laterals on 8th Street from Harbor
Drive to K Street in National City. These services include:
a. Field verify existing conditions in the field.
b. Design the replacement main, connections and lateral connections to the Master Plan
Guidelines and to maximize performance and clearances.
c. Prepare specifications and bid documents.
d. Ensure product availability for construction.
e. Prepare an engineer's construction estimate.
Deliverables:
1. 90% design for review in pdf and paper form.
2. 100% plans and specifications bid ready.
3. Engineer's Construction Estimate.
4 One set original mylars.
This does not include surveying since this is an existing working sewer system. Please see
attached spreadsheet for the cost estimate breakdown. Thank you for this opportunity to serve
the City of National City on this project.
656 5T" AVENUE, SUITE W
SAN DIEGO, CALIFORNIA 92101
ProiectProfessiona/sCoracom TELEPHONE 61 9.244.341 S
FACSIMILE 61 9.794.01 80
BYRON(PROJECTPROFESSIONALSCORP.COM
Pavement Management System Field Analysis and Re ort
Cost Proposal for 8th Street Sewer Design from Harbor Drive to Highland Avenue
for the City of National City
May 10, 2011
Task/Regular Time
Principal
Project
Manager
Project
Manager
Principal
Engineer
Senior
Engineer
Admin.
Assistant/
CAD Oper.
GIS
Specialist
Engineering
Intern
TOTALS
Project Management
12
Design & Specifications
8
4
72
Field Review/Meetings
18
Plan Preparation
40
Total Hours/Units
20
-
4
90
40
Rates per hour/unit
150
105
165
135
68
85
54
TOTALS
3,000
-
660
12,150
2,720
-
-
18,530
Task/Regular Time
Principal
Project
Manager
Project
Manager
Principal
Engineer
Public Works
Inspectors
CAD Oper/
Admin.
Assistant
GIS
Specialist
Engineering
Intern
TOTALS
Project Management
Engineering Review
Markout
Document Preparation
Total Hours
-
_
-
Rates
150
105
165
114
68
54
TOTALS
- �_
_
-
-
-
-
Estimated Reimbursable Costs:
Item
Type of
Units
Cost per
Units
Est. number
of Units
TOTALS
B&W Copies/Prints 8 1/2" x 11"
Each
$ 0.20
100
20
Color Copies/Prints 8 1/2" x 11"
Each
$ 1.00
-
CD Roms
Each
$ 5.00
1
5
D Sheet Mylars
Each
$ 35.00
6
Mileage
Each
$ 0.50
100
50
Each
$ 26.00
1
26
Total Expenses
Total Consulting Fee (above)
Total Cost Estimate
$ 101
$ 18,530
ron S. Wade
$ 18,631