Loading...
HomeMy WebLinkAbout2011 CON Project Professionals - Project Management Services - 8th Street Sewer Design - Supplemental AgreementMay 16, 2011 CALIFORNIA .-�- NA ION CJ TY L O poRA _ INCORPORATED Byron Wade President/CEO Project Professionals Corporation 656 5`h Avenue, Suite W San Diego, CA 92101 Subject: Project: SUPPLEMENTAL AGREEMENT FOR "ON -CALL" PROFESSIONAL ENGINEERING SERVICES 8TH STREET SEWER REPLACEMENT DESIGN Project Professionals Corporation is authorized to begin work on the aforementioned project in the not -to -exceed amount of $18,631.00. The services provided will be accomplished per the existing agreement dated October 5, 2010 (Resolution No. 2010- 225) between the City of National City and Project Professionals Corporation for "On - Call" Professional Engineering services. This project is considered to be within the scope of services and budget of the "On -Call" agreement. Please direct any questions and all submittals to Stephen Manganiello, Traffic Engineer (619-336-4382). Sincerely, Maryam Bai. ., .. Development Services Director / City Engineer Attachment — Scope of Work & Fee Schedule Engineering Department 1243 National City Boulevard, National City, CA 91950-4301 619/336-4380 Fax 619/336-4397 www.nationalcityca.gov PROJECT PROFESSIONALS CORPORATION May 10, 2011 Maryam Babaki, Director of Development Services/City Engineer City of National City 1243 National City Blvd. National City, CA 91950 RE: Proposal for Professional Services 8th Street Sewer Replacement Design Dear Maryam, I am submitting this proposal per your request to provide professional engineering services for the design of the replacement of the existing sewer main and laterals on 8th Street from Harbor Drive to K Street in National City. These services include: a. Field verify existing conditions in the field. b. Design the replacement main, connections and lateral connections to the Master Plan Guidelines and to maximize performance and clearances. c. Prepare specifications and bid documents. d. Ensure product availability for construction. e. Prepare an engineer's construction estimate. Deliverables: 1. 90% design for review in pdf and paper form. 2. 100% plans and specifications bid ready. 3. Engineer's Construction Estimate. 4 One set original mylars. This does not include surveying since this is an existing working sewer system. Please see attached spreadsheet for the cost estimate breakdown. Thank you for this opportunity to serve the City of National City on this project. 656 5T" AVENUE, SUITE W SAN DIEGO, CALIFORNIA 92101 ProiectProfessiona/sCoracom TELEPHONE 61 9.244.341 S FACSIMILE 61 9.794.01 80 BYRON(PROJECTPROFESSIONALSCORP.COM Pavement Management System Field Analysis and Re ort Cost Proposal for 8th Street Sewer Design from Harbor Drive to Highland Avenue for the City of National City May 10, 2011 Task/Regular Time Principal Project Manager Project Manager Principal Engineer Senior Engineer Admin. Assistant/ CAD Oper. GIS Specialist Engineering Intern TOTALS Project Management 12 Design & Specifications 8 4 72 Field Review/Meetings 18 Plan Preparation 40 Total Hours/Units 20 - 4 90 40 Rates per hour/unit 150 105 165 135 68 85 54 TOTALS 3,000 - 660 12,150 2,720 - - 18,530 Task/Regular Time Principal Project Manager Project Manager Principal Engineer Public Works Inspectors CAD Oper/ Admin. Assistant GIS Specialist Engineering Intern TOTALS Project Management Engineering Review Markout Document Preparation Total Hours - _ - Rates 150 105 165 114 68 54 TOTALS - �_ _ - - - - Estimated Reimbursable Costs: Item Type of Units Cost per Units Est. number of Units TOTALS B&W Copies/Prints 8 1/2" x 11" Each $ 0.20 100 20 Color Copies/Prints 8 1/2" x 11" Each $ 1.00 - CD Roms Each $ 5.00 1 5 D Sheet Mylars Each $ 35.00 6 Mileage Each $ 0.50 100 50 Each $ 26.00 1 26 Total Expenses Total Consulting Fee (above) Total Cost Estimate $ 101 $ 18,530 ron S. Wade $ 18,631