HomeMy WebLinkAbout2011 CON Harris & Associates - 8th Street Revitalization Project - Supplemental AgreementDEVELOPMENT SERVICES DEPARTMENT
ENGINEERING DIVISION
1243 NATIONAL CITY BOULEVARD, NATIONAL CITY, CA 91950
TEL:619/336-4380 FAX: 619/336-4397
August 23, 2011
Ehab Gerges, P.E.
Harris & Associates
750 B Street, Suite 1800
San Diego, CA 92101
Subject: SUPPLEMENTAL AGREEMENT FOR CIVIL ENGINEERING
SERVICES
Project: NATIONAL CITY 8TH STREET SMART GROWTH
REVITALIZATION PROJECT
This is a Supplemental Agreement to the original agreement dated March 2, 2010
(Resolution No. 2010-28) between the City of National City and Harris & Associates for
Civil Engineering Services for the National City 8th Street Smart Growth Revitalization
Project. This supplemental agreement provides for an additional not -to -exceed amount of
$12,850.00 to provide additional utility undergrounding design.
Proposed Contract Amendment: $12,850.00
Revised Contract Amount: $3601652.00
Reviewed by:
2/i, r/i.,
S ephen Mangiello Date
Traffic Engineer
Approved by:
ryam Bab
City Engineer
P.E. Date
Harris & Associates.
Shaping the Future, One Project at a Time
August 22, 2011
Mr. Stephen Manganiello
City Traffic Engineer
City of National City
1243 National City Boulevard
National City, CA 91950
Subject: Proposal for additional Design for feh Street District 24 20A Conversion, in the
City of National City
Dear Steve,
Per your request, the following is a proposal to provide additional design services to address
undergrounding of existing overhead utilities for the Harborview Condominiums, located on the
southeast corner of 8"' Street and D Avenue.
PROJECT UNDERSTANDING
This proposal is to provide additional design services to address undergrounding of existing overhead
utilities for the Harborview Condominiums.. The subject property has a pole on the corner of 9`h Street
and the alley just east of east of D Avenue. SDG&E, AT&T and Cox will be responsible for the
design of their respective facilities.
It is our understanding that this work will bid as an additive alternate bid with the 8`h Street District 24
20 A Conversion District package.
Our scope of work is limited to the items outlined in the scope of services below and our estimated
effort.
Scope of Services
1.1 Review Meetings
We will schedule and attend meetings with SDG&E, AT&T and Cox Communications to obtain each
utility's final designs and agreements. One meeting will be scheduled with each utility.
750 B'Street, Suite 1800 San Diego, California 92101 619.236.1778 FAX 619.236.1179 sandiego@harris-assoc.com
August 22, 2011
Steve Manganiello
Page 2 of 3
1.2 Base Mapping
Utilizing the Harborview CAD files provided by the City, we will prepare base maps for the
additional design. Base maps will be prepared in plan only formats.
All underground utilities shown on the Harborview plans will be verified. All base maps will be
prepared in AutoCAD.
1.3 Utility Composite & Bid Documents
1. Utilizing the SDG&E electric trench, conduit and substructure design, the AT&T design, and Cox
design, prepare a composite exhibit utilizing the base maps.
2. Re -draft the SDG&E electric Trenching Items of work design on the base maps replicating typical
SDG&E design and appearance. This re -drafted design will then be provided to SDG&E for their
approval.
3. Prepare alternate bid items descriptions to include with the 8`h Street District 24 20A Conversion
bid documents.
1.4 Preliminary Opinion of Probable Construction Cost Estimate
Separate the opinion of the probable undergrounding construction cost for the Harborview
Condominiums including the two poles on 8th Street.
FEES
Harris & Associates proposes to provide the above services for the total "not -to -exceed" fee of
$12,850. Our services would continue to be invoiced monthly based on the actual hours of work
completed. Our services would be accomplished per our existing agreement with the City, and all
terms and conditions would be as stated therein.
u
Harris & Associates.
August 22, 2011
Steve Manganiello
Page 3 of 3
ASSUMPTIONS / INFORMATION REQUESTED
• SDG&E to provide: 1) Trench, conduit, and substructure design; 2) Electric Cable and Hardware
design
• Utility composite and proposed revisions to SDG&E electric trench, conduit, and substructure
design are to be reviewed and approved by SDG&E. SDG&E will make all necessary revisions to
the cable and hardware design including voltage drop, flicker, pulling calculations to their
preliminary design plans
• Potholing of existing utilities is not included in the scope of this proposal
• City will provide CAD files needed for base mapping
• No field survey is included in this proposal
Sincerely,
Harris & Associates
Ehab Gerges, PE
Vice President
Cc: Bob Sutherlin, Harris & Associates
Dan Lee, Harris & Associates
I:\Projects\City of National City\Sth Smart Growth Stree0Administmtion Items\Contractual Items\District 24 20A Conversion Proposal dnc