HomeMy WebLinkAbout2012 CON Sadie Construction - Change Order #1 - Bus Bench Shelter Project+>^ CALIFORNIA - NATIONAL Crry l'3`J�7 �. INCORPORATE CITYWIDE BUS BENCH -SHELTER INSTALLATIONS PROJECT FY 11-12 CHANGE ORDER NO. 1 Specification No. 11-05 Contractor: Sadie Construction, Inc. Reason/Purpose for this Change Order: As a result of the unit prices bid by the Contractor, there are additional funds remaining for this Project. The Engineering Department recommends expending these funds for the installation of 4 additional solar powered bus -shelters. March 19, 2012 The City of National City and Contractor agree to the following change to the original Contract: The Contractor agrees to install 4 additional solar powered bus -shelter units (each unit includes one bench and trash receptacles per the contract) at the bid unit price in the manner specified in the contract documents at locations to be determined by the Enigeerng Department. The Contractor and City agree that the Contractor shall be paid the unit price for each bus -shelter installation. The Contractor and City agree that the Contractor shall receive an additional $2,000.00 in compensation for traffic control. The Contractor and City agree that all costs included and requirements of the original bid shall apply and there shall be no other additional costs or ;deductions. **Special Note: This Change Order requires Council approval before it can become part of the contract. Original Contract Amount $ 84,475.00 Net change by previously authorized Change Orders Subtotal 84,475.00 Amount of this change order 30,900.00 New contract amount . $ Working days added: 10 Submitted by: Pro City Engineer Percent change in Contract to date 36.58% Working days subtracted: 0 Date Y/3hz ILL; 115, 375.00 Date 414)», Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, . and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated her Accepted an reed to b Sadie Co tru ' n, Inc.: � 3 /� Nape: T/eUei /44 r i P_ /ci5 Date Note to Contractor If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 RESOLUTION NO. 2012 — 81 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 1 WITH SADIE CONSTRUCTION IN THE NOT TO EXCEED AMOUNT OF $30,900 TO PROVIDE AND INSTALL FOUR ADDITIONAL BUS SHELTER UNITS AND TRAFFIC CONTROL FOR EACH LOCATION FOR THE CITYWIDE BUS BENCH -SHELTER INSTALLATION PROJECT WHEREAS, on February 7, 2012, the City Council adopted Resolution No. 2012-38, awarding a contract in the amount of $84,475 to Sadie Construction, Inc., to provide and install 11 bus shelter units and traffic control for each location for the National City Citywide Bus Bench -Shelter Project; and WHEREAS, due to the lower than expected bid price, the City desires to increase the number of solar -powered bus shelter units with benches and trash receptacles from 11, the original contract amount, to 15; and WHEREAS, a change order to the contract is appropriate because the additional cost for the four additional bus shelter units is $30,900, which exceeds 25% of the original contract amount, bringing the total not to exceed amount of the contract to $115,375. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the Mayor to execute Change Order No. 1 to the contract with Sadie Construction in the not to exceed amount of $30,900 to provide and install four additional bus shelter units and traffic control for each location for the Citywide Bus Bench -Shelter Installation Project. Said Change Order is on file in the office of the City Clerk. PASSED and ADOPTED this 3rd day of April, 201 Ron Morrison, Mayor ATTEST: PPROVED AS TO FORM: C udia G7 itua Silva City Attorn Passed and adopted by the Council of the City of National City, California, on April 3, 2012 by the following vote, to -wit: Ayes: Councilmembers Morrison, Natividad, Rios, Sotelo-Solis, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California di City erk of the City o14National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2012-81 the City of National City, California, passed and adopted by the Council of said City on April 3, 2012. City Clerk of the City of National City, California By: Deputy CITY OF NATIONAL CITY, CALIFORNIA COUNCIL AGENDA STATEMENT MEETING DATE: April 3, 2012 AGENDA ITEM NO. 11 ITEM TITLE: Resolution of the City Council of the City of National City approving a Change Order #1 to Sadie Construction in the amount not -to -exceed $30,900 to provide and install 4 additional bus shelter units (with benches and trash receptacles) and traffic control for each location for the Citywide Bus Bench - Shelter Installation Project, Specification 11-05 and authorizing the City Manager to execute the Change Order (Funded by Prop 113) PREPARED BY: Barby Tipton PHONE: 336-4583 EXPLANATION: See attached. DEPARTMENT: Development Services -Engineering Division APPROVED BY: FINANCIAL STATEMENT: APPROVED: ACCOUNT NO. APPROVED: J MIS Funds are available in expenditure account 346-409-500-598-6574 (Public Transportation Modernization, Improvement, and Service Enhancement Program — Prop 1B) in the amount of $30,900 ENVIRONMENTAL REVIEW: N/A ORDINANCE: INTRODUCTION: FINAL ADOPTION: Finance STAFF RECOMMENDATION: Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION: N/A ATTACHMENTS: 1. Resolution 2. Explanation Explanation On January 23, 2012, nine bids were received and opened for the National City Citywide Bus Bench -Shelter Project, Specification 11-05. The lowest responsive bidder was Sadie Construction, Inc. with a proposed bid amount of $84,475. On February 7, 2012, Council awarded the project to Sadie Construction via Resolution 2012- 38. The original contract was for 11 solar -powered bus shelter units with benches and trash receptacles. Due to the lower than expected bid price, budget is available to purchase and install new shelter units at 4 additional locations. The Contractor has agreed to purchase and install the new shelter units at the bid unit price of $7,225 per unit, plus $2,000 for additional traffic control associated with the four new locations, for a total cost of $30,900. Because the amount for additional shelter units exceeds 25% of the original contract amount, we are seeking Council approval for this Change Order #1. As included in the contract, the eleven original locations identified for installation of the shelter units are: • Euclid Ave @ Plaza Blvd (NB) • Euclid Ave @ Plaza Blvd (SB) • Euclid Ave @ 9th St (SB) • Euclid Ave @ 8th St (NB) • Euclid Ave @ 4th St (SB) • Euclid Ave @ 4th St (NB) • Highland Ave @ 24th St (SB) • Highland Ave, 2600 Block (NB) • Highland Ave @ 28th St (NB) • Highland Ave @ 30th St (SB) • Highland Ave @ 30th St (NB) These eleven locations were presented to City Council on September 27, 2011 and ultimately selected for the contract based on the following criteria: 1) Ridership 2) Proximity to hospitals, senior housing, schools, retail / shopping centers 3) Existing amenities 4) Corridor consistency 5) Requests from residents Using this same criteria, staff recommends that Council approve the Change Order #1 to Sadie Construction, to install four additional shelter units at the following locations (see attached detail sheets with photos for each location): • Highland Ave @ 8th St (NB) • Highland Ave @ 8th St (SB) • Highland Ave @ 24th St (NB) • 30`h St @ Highland Ave (EB) 1 LOCATION: HIGHLAND AVE @ 8TH ST (ORIENTATION: NORTHBOUND ! FARSIDE) • Ridership o Rank: 7 o Weekly Average Boarding/Alighting: 1,300 • Red Curb: Yes o Existing: N/A o Additional Required: 44' • Adjacent Land Use: Commercial • ADA Compliant: Yes o Sidewalk: 5' o Parkway Strip: No o Concrete Access Pad Required: No • Bench: No o Bench Count: 0 o Type: N/A o Condition: N/A • Shelter: No • Trash Receptacle: No • Lighting: Yes 2 LOCATION: HIGHLAND AVE @ 8TH ST (ORIENTATION: SOUTHBOUND / FARSIDE) • Ridership o Rank: 11 o Weekly Average Boarding/Alighting: 1,179 • Red Curb: Yes o Existing: +120' o Additional Required: 0' • Adjacent Land Use: Commercial • ADA Compliant: Yes o Sidewalk: 5-8' o Parkway Strip: No o Concrete Access Pad Required: No • Bench: Yes o Bench Count: 1 o Type: Multi o Condition: Good • Shelter: No • Trash Receptacle: No • Lighting: Yes 3 LOCATION: HIGHLAND AVE @ 24TH ST (ORIENTATION: NORTHBOUND / FARSIDE) • Ridership o Rank: 36 o Weekly Average Boarding/Alighting: 715 • Red Curb: Yes o Existing: +120' o Additional Required: 0' • Adjacent Land Use: Commercial • ADA Compliant: Yes o Sidewalk: 5' o Parkway Strip: No o Concrete Access Pad Required: No • Bench: No o Bench Count: 0 o Type: N/A o Condition: N/A • Shelter: No • Trash Receptacle: Yes • Lighting: Yes 4 LOCATION: 30TH ST @ HIGHLAND AVE (ORIENTATION: EASTBOUND / FARSIDE) • Ridership o Rank: 19 o Weekly Average Boarding/Alighting: 933 • Red Curb: Yes o Existing: +120' o Additional Required: 0' • Adjacent Land Use: Commercial • ADA Compliant: Yes o Sidewalk: 5-8' o Parkway Strip: No o Concrete Access Pad Required: No • Bench: Yes o Bench Count: 1 o Type: Multi o Condition: Good • Shelter: No • Trash Receptacle: Yes • Lighting: Yes 5 r CITYWIDE BUS BENCH -SHELTER INSTALLATIONS PROJECT FY 11-12 Specification No. 11-05 Contractor: Sadie Construction, Inc. CHANGE ORDER NO. 1 March 19, 2012 Reason/Purpose for this Change Order: As a result of the unit prices bid by the Contractor, there are additional funds remaining for this Project. The Engineering Department recommends expending these funds for the installation of 4 additional solar powered bus -shelters. The City of National City and Contractor agree to the following change to the original Contract: The Contractor agrees to install 4 additional solar powered bus -shelter units (each unit includes one bench and trash receptacles per the contract) at the bid unit price in the manner specified in the contract documents at locations to be determined by the Eningeering Department. The Contractor and City agree that the Contractor shall be paid the unit price for each bus -shelter installation. The Contractor and City agree that the Contractor shall receive an additional $2,000.00 in compensation for traffic control. The Contractor and City agree that all costs included and requirements of the original bid shall apply and there shall be no other additional costs or deductions. **Special Note: This Change Order requires Council approval before it can become part of the contract. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 84,475.00 84,475.00 30,900.00 New contract amount $ Working days added: 10 Working days subtracted: 0 Percent change in Contract to date 36.58% 115,375.00 Submitted by: Project Manager Date City Project Manager Date Approved by: City Engineer Date City Manager, required for change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Sadie Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 (19 Telephone (619) 336-4380 RESOLUTION NO. 2012 — RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 1 WITH SADIE CONSTRUCTION IN THE NOT TO EXCEED AMOUNT OF $30,900 TO PROVIDE AND INSTALL FOUR ADDITIONAL BUS SHELTER UNITS AND TRAFFIC CONTROL FOR EACH LOCATION FOR THE CITYWIDE BUS BENCH -SHELTER INSTALLATION PROJECT WHEREAS, on February 7, 2012, the City Council adopted Resolution No. 2012-38, awarding a contract in the amount of $84,475 to Sadie Construction, Inc., to provide and install 11 bus shelter units and traffic control for each location for the National City Citywide Bus Bench -Shelter Project; and WHEREAS, due to the lower than expected bid price, the City desires to increase the number of solar -powered bus shelter units with benches and trash receptacles from 11, the original contract amount, to 15; and WHEREAS, a change order to the contract is appropriate because the additional cost for the four additional bus shelter units is $30,900, which exceeds 25% of the original contract amount, bringing the total not to exceed amount of the contract to $115,375. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the Mayor to execute Change Order No. 1 to the contract with Sadie Construction in the not to exceed amount of $30,900 to provide and install four additional bus shelter units and traffic control for each location for the Citywide Bus Bench -Shelter Installation Project. Said Change Order is on file in the office of the City Clerk. PASSED and ADOPTED this 3rd day of April, 2012. ATTEST: Michael R. Dalla, City Clerk APPROVED AS TO FORM: Claudia Gacitua Silva City Attorney Ron Morrison, Mayor 1 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone / 619-336-4229 fax April 9, 2012 Mr. Steven Fields Sadie Construction 1414 Samp Lane Placentia, CA 92870 Dear Mr. Fields, On April 3rd, 2012, Resolution No. 2012-81 was passed and adopted by the City Council of the City of National City, authorizing execution of Change Order No. 1 to a Contract with Sadie Construction. We are enclosing for your records a certified copy of the above Resolution and a fully executed original Change Order. Michael R. Dalla, CMC City Clerk Enclosures cc: Engineering Dept.