HomeMy WebLinkAbout2012 CON Cox Communications - Joint Trench Agreement Underground District #24AGREEMENT
BY AND BETWEEN
THE CITY OF NATIONAL CITY
AND
COX COMMUNICATIONS
THIS AGREEMENT is entered into this 5th day of June, 2012, by and between
the CITY OF NATIONAL CITY, a municipal corporation (the "CITY"), and COX
COMMUNICATIONS, (Cox).
RECITALS
WHEREAS, Cox desires to enter into a Joint Trench Agreement for installation
of facilities in the trenches of Underground District No. 24 (20A Conversion 8th Street) COX
project No. 24008, and
WHEREAS, Cox has submitted a Joint Trench Agreement Offer in the not -to -
exceed amount of $91,265.35 (attached Exhibit A),
NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS
FOLLOWS:
1. The CITY shall furnish trench, backfill, installation of conduit system with pull string and
street repair.
2. Trench, backfill, installation of conduit system with pull string shall be accomplished to
Cox governing agency specficiatons.
3. All increases to costs (Change Orders) must be agreed upon by both parties, in writing,
prior to the City approving any change orders. Such approval shall not be unreasonably
withheld.
4. Cox will provide and deliver all Cox materials for said project. Delivery of Cox materials
shall not be unreasonably delayed.
5. Cox will provide onsight inspection for CATV conduit system.
6. The CITY shall provide the as-builts drawings to Cox.
7. The City shall collect payment from Cox as follows: $45,632.68 due within 30 days of
executing agreement and $45,632.67 due within 30 days of the City deliverying final As-
builts for the project for a total consideration of $91,265.35. Any agreed upon changes
shall be paid within 30 days of execution of a Change Order.
8. Cox agrees to indemnify, defend, and hold harmless, the City of National City and its
officers and employees against and from any and all liability, loss, damage to property,
injuries to, or death of any person or persons, and all claims, demands, suits, actions,
proceedings, reasonable attorney's fees, and defense costs, of any kind or nature,
including worker's compensation claims of or by anyone whomsoever, resulting from or
arising out of Cox's negligent performance of construction under this agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on
the date and year first above written.
CITY OF NATIONAL CITY
B
on Morrison, Mayor
OVED AS. O FORM:
CI G.
G.
Ci ttorney
COX COMMUNIC NS
(Corporation — signatur:. of o corporate officers)
(Partnership — one sig .lure)
(Sole proprie ship one.ignature)
By:
By:
2
(Print)
(Title)
(Name)
2-4 TzTNEl_
(Print)
zo, 1
(Title)
Citys Standard Agreement — June 2008 revision
Company Name
Project Name
Location
JOINT TRENCH OFFER
EXHIBIT"A"
COX COMMUNICATIONS, INC.
8th Street 20A
8th St from NC Blvd to Ilighland Ave.
Project Job Numbers
COX 24008
COX PO# 0
cox.
National City NC District 24 20A
SDGBE Design # 0
la) EXCAVATION - Jointly occupied trench
DESCRIPTION QUANTITY PRICE
Hard digging. 12" section Q )Q
(without once)
Outside Conversion, Hard digging, 12" section
(without won)
x-Hard digging, 12' section
*mow woe)
Outside Conversion, x-Hard digging, 12" section
(without Wag
Hard digging, 12" section
(with Ntl.34 relm turd m tea /»
)mining a Joint Trench Proposal; a Joint Trench Offer
eOf copies atun drawing gushed. he proposed bunch nothing.
x-Hard digging, 12" section
(with Moe based on 21.71 /»
Outside Conversion, x-Hard digging, 12" section
(wlm won aead en 21.17 a)
Hard digging, 12' section
(wdn woo a and cvela P-o id.r bayed 00 nee ten)
Outside Conversion, Hard digging, 12" section
(wen won a avi cable proridrhead on amain)
s-Hard digging, 12" section
(prim Mon 4 ale cabs pros" boat on Meg
Outside Conversion, x-Hard digging, 12" section
(with Mon a Ind cabs proySWrbased on 20.71n)
Service Trench, l6" a 12"
(web Male4 Tareae 4vS tpeye...dad LS n)
Outside Conversion, Service Trench, 10' x Ir
(.we erw.a on ydrr•roprtyMood rr {Slur»
Additional vertical space (18"x 18' window)
Hard digging 0 68.62
x-Hard rigging 0
100.78
EXT
9 ma 299
2 3Ji 222
2 21_77 29
IS I Main
2 2.219 292
9 1222 209
Q 122 22
9 272 222
2 £:z 922
2 in LW
2 L22 22.12
HE an 1813.37
22 Ili 9934
0.00
0.00
1b) EXCAVATION • Communication only trench
30' vertical occupancy space in french, 18" wide communications
Easy digging, 18" x 30' trench Q 2.222
(unpaved residential dirt ant. fight Memo)
Outside Conversion, Easy digging, 18" x 30' trench
(unpaved rs5Wn1Y dot Nit light honk)
Average digging. 18" x 30' trench
(wpmd dirt ry n** hwric)
Outside Conversion, Average digging, 18" x 30" trench
(unpaved dirt rM motto -sty traffic)
Hard digging, 18" x 30' trench
( Ytwer drwwwel
Outside Conversion, Hard digging, 18" x 30" trench
(without dnr repair)
Hard digging. 18' x 30' trench
(dim Urlas bead ona474R1
Outside Conversion, Hard digging, 18" x 30. trench
04nMM.34 To. bead ona471/»
x•Hard digging, 18" x 30' trench
With. Ong repair)
Outside Conversion, x-Hard digging, 18" x 30' trench
(enema dew nose)
x-Hard digging. 18" x 30" trench
(with flow repaid
Outside Conversion, x-Hard digging, 18" x 30" trench
(web final repair)
SpeGal condition (in addition t0 selected benches)
Concrete cutting and breaking Q
2
2
Q
9
9
9
2
9
9
132.1Q
132.1Q
143,7Q
14.22.2
Final repair, concrete streets 9 194.22
1a) JT TOTAL VALUE
$35,915.13
222
222
922
.22
x:r.[
Q:QQ
143t.95
26974.94
2.99
222
222
9.92
9.QQ
9.99
lb) CATV ONLY TOTAL VALUE $28,457.88
2a) MATERIAL 8 INSTALLATION - jointly occupied trench
All materials will be provided and delivered t0 job site or location by Telecom
DESCRIPTION QUANTITY PRICE EXT
9' Round Handhole (FL-8) Q I.399 Q.QQ
1730 HH Single Body 17 31a.94 54x1.98
1730 HH Double Body is 482.20 gialM
2x3x2HH Q lotas2 2.QQ
21)2 a4a3 2 101649 ¢QQ
TELCO,CATV CONDUIT & MATERIAL INSTALLED BY SDGE
Asy conduit Installation - up to 4" mg Q.¢2 12212/1
Any conduit bend • up to 24" radius
Any conduit bend - up to 36" radius
3.5 Sk sluury encasement
(radius conduits only)
6. warning tape
Pull rape
9
10063
Ig li21 DAR
22 us 2$ 99
2 19.39 9.44
9.99
9.22 4.92
0.10 3007.41
2b) MATERIAL 8 INSTALLATION • communication only trench
Miscellaneews material, labor, equipment and add-ons
These costs are adders to Me base bench costs, where appropriate
Asphalt cm 8 break Q 292 9„tt
Final Repair Q 222 122
Concrete encasement Q Qg9 ALI
Shading Q 222 222
Pedestal installation 1432 Q 2,122 223.4�
Pedestal installation 1010 Q 222 138.28
Slurry Q 222 18.13
Grinding 0 9,99 13.82
222
292
949
9:94
9.22
9.09
212
0.22
2a) JT MATERIAL B INSTALLATION 626.892.3.4
1. Excavation.
a) Joint Trench Total
b) CATV Only Trench Total
2. Material & Installation:
al Joint Trench Material & Installation Total
bl CATV Only Material & Installation Total
3. Outside Conversion:
a) Joint Trench Total
b) CATV Only Trench Total
4. Material Supplied by CATV : Vaults. peas, handholes, conduit, sweeps, couplers, jet line
21:1) CATV ONLY MATERIAL 8 INSTALLATION
$35,915.13
$28,457.88
$28,892.34
$0.00
$80.50
$26,974.93
Outside Conversion Total $27,055.43
5. Material Supplied by Contractor'. None
$0.00
6. Other / Notes : None
TOTAL VALUE OF JOINT TRENCH OFFER :
$91,265.35 I
March 15, 2012
20A JOINT TRENCH PROPOSAL
cox.
COX agrees to pay the National City or its contractor the sum of $91,265.35 for the
construction of a conduit system in accordance with the plans and specifications attached hereto,
incorporated herein and described as follows:
Job Name : 8th Street 20A
Location : 8th St from NC Blvd to Highland Ave.
COX Project No.: 24008
Offeree Project No.: NC District 24 20A
National City to furnish:
1) Trench, backfill, installation of conduit system with pull string and street repair.
2) All of the above item no. 1 to be done to COX governing agency specifications.
3) All changes or additions must be approved by a COX representative.
4) Cox will provide and deliver all Cox materials for said project
5) COX will provide onsight inspection for CATV conduit system.
6) Cox is to be provided as -built drawings once joint trench is complete
See attached cost estimate of separate trench EXHIBIT " to correspond with above itemized
requirements.
On Behalf ' Co Co' m nicat
Signature :
Name:
Title : ��%"fj�
Date :
On Behalf of National City
Signature :
Name:
Title :
Date :
cox*
March 15, 2012
National City
Barby Tipton
1243 National City Blvd
National City, CA
91950
SUBJECT: 8th Street 20A
Cox Communications Project No.: 24008
Municipality/Utility Project No. : NC District 24 20A
To Whom It May Concern:
Cox Communications, Incorporated., (COX) desires to enter into a Joint Trench Agreement with
National City for the subject project.
As a Joint Trench applicant, COX is submitting a Joint Trench Proposal; a Joint Trench Offer
identified as Exhibit "A", and three (3) copies of our drawing illustrating the proposed trench routing.
Upon acceptance of this proposal, please return the executed copy to Cox Communications, Inc. These
copies are used to facilitate compensation to the entity performing the work.
Please contact the undersigned, upon awarding the job, with the name and address of the work performing
entity , in order to ensure that contractual obligations are agreed upon between COX and said entity
prior to the commencement of this project.
If I can be of further assistance, or if you should have any questions, please contact me at
619 266 5589
Sincerely,
COX COMMUNICATIONS, INC.
Brendan Fennelly
System -Development Project Planner
Attachment
RESOLUTION NO. 2012 — 110
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
AUTHORIZING THE MAYOR TO EXECUTE A JOINT TRENCH OFFER
AGREEMENT WITH COX COMMUNICATIONS, INC., WHEREIN COX
PAYS THE CITY UP TO THE NOT TO EXCEED AMOUNT OF $91,265.35
FOR THE AERIAL TO UNDERGROUND CONVERSION OF UTILITIES
IN CONJUNCTION WITH UNDERGROUND DISTRICT NO. 24
WHEREAS, on December 20, 2005, City Council adopted Resolution No. 2005-
256 to establish Underground Utility District No. 24 on 8th Street from National City Boulevard to
Highland Avenue for the purposes of replacing overhead wires, structures, and poles with an
underground system for electric and communications services to benefit public safety, health, and
welfare; and
WHEREAS California Public Utility Commission (CPUC) Rule 20A allows for an
allocation of utility funds to municipalities for the purpose of undergrounding conversions; and
WHEREAS, SDG&E is authorized by the CPUC to convert overhead facilities to
underground in accordance with Rule 20A. Rule 20A also allows municipalities to bid portions of
the work, such as trenching, conduit, backfill, substructures, and pavement repair in an effort to
better control costs and schedule; and
WHEREAS, the City Council approved staff's recommendation to bid the project,
which included revising SDG&E's schematic design to provide detailed engineering plans and
construction documents, in an effort to generate more competitive bidding and reduce the amount
of change orders during construction; and
WHEREAS, on March 20, 2012 Council awarded the contract to Basile
Construction Inc., in the not to exceed amount of $2,386,365.49, and authorized a 25%
contingency; and
WHEREAS, the cost of the dry utility work is $1,058,640.52, and the cost of the
sewer work is $1,327,724.97. The dry utility costs for the SDG&E portion of the work will be
reimbursed with the 20A conversion funds. Cox Cable shall pay its cost to the City per conditions
of the Joint Trench Offer Agreements; and
WHEREAS, Cox submitted a Joint Trench Offer (JTO) with the not to exceed
amount of $91,265.35 wherein Cox pays the City half of the offer within 30 days of executing this
Agreement, and the final half within 30 days of the City providing the as-builts for the Project.
Any changes to this limit shall be pre -approved by Cox, and Cox shall then pay for actual services
rendered should the amount exceed the offer.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National
City hereby authorizes the Mayor to execute a Joint Trench Offer Agreement with Cox
Communications, Inc., wherein Cox pays the City up to the not to exceed amount of $91,265.35
for the aerial to underground conversion of utilities in conjunction with Underground District No.
24.
--- Signature Page to Follow ---
Resolution No. 2012 — 110
Page Two
PASSED and ADOPTED this 5th day of June, 201
ATTEST:
N 1
Mi ael R. Dalla, City Clerk
PPROVED AS TO FORM:
a
C(y Attor
va
Ron Morrison, Mayor
Passed and adopted by the Council of the City of National City, California, on June 5,
2012 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Natividad, Rios, Sotelo-Solis, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
evAt,
ierk
City of the City f National City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2012-110 the City of National City, California, passed and adopted
by the Council of said City on June 5, 2012.
City Clerk of the City of National City, California
By:
Deputy
CITY OF NATIONAL CITY, CALIFORNIA
COUNCIL AGENDA STATEMENT
`Aoo,i • -a ,1„
AG.\--\0
MEETING DATE: June 5, 2012
AGENDA ITEM NO. 4
ITEM TITLE:
Resolution of the City Council of National City approving a Joint Trench Offer Agreement with Cox
Communications (COX) wherein COX shall pay the City up to the not to exceed amount of $91,265.35
and authorizing the mayor to execute agreement in conjunction with Underground District 24 (20A
Conversion 8'h Street) aerial to underground conversion of utilities
PREPARED BY: Barby Tipton
PHONE: 336-4583
EXPLANATION:
See attached
DEPARTMENT: Development Services -Engineering
Division
APPROVED BY:
FINANCIAL STATEMENT: APPROVED:
ACCOUNT NO. APPROVED:
Funds to be deposited into account 001-409-500-598-3918
ENVIRONMENTAL REVIEW:
N/A
ORDINANCE: INTRODUCTION:
FINAL ADOPTION:
Finance
MIS
STAFF RECOMMENDATION:
Adopt the Resolution.
BOARD / COMMISSION RECOMMENDATION:
N/A
ATTACHMENTS:
1. Explanation
2. Joint Trench Offer Agreement
3. Resolution
On December 20, 2005, City Council adopted Resolution No. 2005-256 to establish
Underground Utility District No. 24 on 8th Street from National City Boulevard to
Highland Avenue for the purposes of replacing overhead wires, structures and poles
with an underground system for electric and communications services to benefit public
safety, health and welfare. California Public Utility Commission (CPUC) Rule 20A allows
for an allocation of utility funds to municipalities for the purpose of undergrounding
conversions. The City's allocation balance as of March 31, 2012 was $3,019,844.
SDG&E is authorized by the CPUC to convert overhead facilities to underground in
accordance with Rule 20A. However, Rule 20A also allows municipalities to bid portions
of the work, such as trenching, conduit, backfill, substructures, pavement repair, etc. in
an effort to better control costs and schedule.
Council supported staff's recommendation to bid the project, which included revising
SDG&E's schematic design to provide detailed engineering plans and construction
documents, in an effort to generate more competitive bidding and reduce the amount
of change orders during construction. The 20A conversion of 8th Street between
National City Boulevard and Highland Avenue was also combined with the sewer
replacement along 8th Street in an effort to solicit more competitive bids.
On March 20, 2012 Council awarded the contract to Basile Construction Inc. in the not
to exceed amount of $2,386,365.49 and authorized a 25% contingency.
Ultimately, by electing to bid the project as a municipal trench job (rather than allowing
SDG&E to bid the job), by preparing detailed plans and specifications, and by combining
the utility undergrounding with the sewer replacement as one contract, the City has
realized a significant cost savings. Basile Construction's bid was $613,634.51 lower
than staff's Engineer's Estimate, while the dry utility portion of the bid was $612,274.48
lower than SDG&E's preliminary engineering estimate.
The cost of the dry utility work is $1,058,640.52 and the cost of the sewer work is
$1,327,724.97. The dry utility costs for the SDG&E portion of the work will be
reimbursed with the 20A conversion funds. AT&T, Cox Cable and Access Cable shall pay
their cost to the City per conditions of the Joint Trench Offer Agreements.
Cox submitted the Joint Trench Offer (JTO) with the not to exceed amount of
$91,265.35 where Cox will pay the City 1/2 of the offer within 30 days of executing this
agreement and the final 1/2 within 30 days of the City providing the as-builts for the
project. Any changes to this limit shall be pre -approved by Cox and Cox shall then pay
for actual services rendered should the amount exceed the offer.
Staff recommends that Council approve the JTO agreement.
RESOLUTION NO. 2012 —
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
AUTHORIZING THE MAYOR TO EXECUTE A JOINT TRENCH OFFER
AGREEMENT WITH COX COMMUNICATIONS, INC., WHEREIN COX
PAYS THE CITY UP TO THE NOT TO EXCEED AMOUNT OF $91,265.35
FOR THE AERIAL TO UNDERGROUND CONVERSION OF UTILITIES
IN CONJUNCTION WITH UNDERGROUND DISTRICT NO. 24
WHEREAS, on December 20, 2005, City Council adopted Resolution No. 2005-
256 to establish Underground Utility District No. 24 on 8th Street from National City Boulevard to
Highland Avenue for the purposes of replacing overhead wires, structures, and poles with an
underground system for electric and communications services to benefit public safety, health, and
welfare; and
WHEREAS California Public Utility Commission (CPUC) Rule 20A allows for an
allocation of utility funds to municipalities for the purpose of undergrounding conversions; and
WHEREAS, SDG&E is authorized by the CPUC to convert overhead facilities to
underground in accordance with Rule 20A. Rule 20A also allows municipalities to bid portions of
the work, such as trenching, conduit, backfill, substructures, and pavement repair in an effort to
better control costs and schedule; and
WHEREAS, the City Council approved staff's recommendation to bid the project,
which included revising SDG&E's schematic design to provide detailed engineering plans and
construction documents, in an effort to generate more competitive bidding and reduce the amount
of change orders during construction; and
WHEREAS, on March 20, 2012 Council awarded the contract to Basile
Construction Inc., in the not to exceed amount of $2,386,365.49, and authorized a 25%
contingency; and
WHEREAS, the cost of the dry utility work is $1,058,640.52, and the cost of the
sewer work is $1,327,724.97. The dry utility costs for the SDG&E portion of the work will be
reimbursed with the 20A conversion funds. Cox Cable shall pay its cost to the City per conditions
of the Joint Trench Offer Agreements; and
WHEREAS, Cox submitted a Joint Trench Offer (JTO) with the not to exceed
amount of $91,265.35 wherein Cox pays the City half of the offer within 30 days of executing this
Agreement, and the final half within 30 days of the City providing the as-builts for the Project.
Any changes to this limit shall be pre -approved by Cox, and Cox shall then pay for actual services
rendered should the amount exceed the offer.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National
City hereby authorizes the Mayor to execute a Joint Trench Offer Agreement with Cox
Communications, Inc., wherein Cox pays the City up to the not to exceed amount of $91,265.35
for the aerial to underground conversion of utilities in conjunction with Underground District No.
24.
--- Signature Page to Follow ---
Resolution No. 2012 —
Page Two
PASSED and ADOPTED this 5th day of June, 2012.
Ron Morrison, Mayor
ATTEST:
Michael R. Dalla, City Clerk
APPROVED AS TO FORM:
Claudia Gacitua Silva
City Attorney
AGREEMENT
BY AND BETWEEN
THE CITY OF NATIONAL CITY
AND
COX COMMUNICATIONS
THIS AGREEMENT is entered into this 5t° day of June, 2012, by and between
the CITY OF NATIONAL CITY, a municipal corporation (the "CITY"), and COX
COMMUNICATIONS, (Cox).
RECITALS
WHEREAS, Cox desires to enter into a Joint Trench Agreement for installation
of facilities in the trenches of Underground District No. 24 (20A Conversion 8`" Street) COX
project No. 24008, and
WHEREAS, Cox has submitted a Joint Trench Agreement Offer in the not -to -
exceed amount of $91,265.35 (attached Exhibit A),
NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS
FOLLOWS:
1. The CITY shall furnish trench, backfill, installation of conduit system with pull string and
street repair.
2. Trench, backfill, installation of conduit system with pull string shall be accomplished to
Cox governing agency specficiatons.
3. All increases to costs (Change Orders) must be agreed upon by both parties, in writing,
prior to the City approving any change orders. Such approval shall not be unreasonably
withheld.
4. Cox will provide and deliver all Cox materials for said project. Delivery of Cox materials
shall not be unreasonably delayed.
5. Cox will provide onsight inspection for CATV conduit system.
6. The CITY shall provide the as-builts drawings to Cox.
7. The City shall collect payment from Cox as follows: $45,632.68 due within 30 days of
executing agreement and $45,632.67 due within 30 days of the City deliverying final As-
builts for the project for a total consideration of $91,265.35. Any agreed upon changes
shall be paid within 30 days of execution of a Change Order.
8. Cox agrees to indemnify, defend, and hold harmless, the City of National City and its
officers and employees against and from any and all liability, loss, damage to property,
injuries to, or death of any person or persons, and all claims, demands, suits, actions,
proceedings, reasonable attorney's fees, and defense costs, of any kind or nature,
including worker's compensation claims of or by anyone whomsoever, resulting from or
arising out of Cox's negligent performance of construction under this agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on
the date and year first above written.
CITY OF NATIONAL CITY
COX COMMUNIC IQNS
(Corporation — signatur of o corporate officers)
(Partnership — one s'. turn)
(Sole proprio rship ono .ignature)
By: By:
Ron Morrison, Mayor (Name)
APPROVED AS TO FORM:
Claudia G. Silva
City Attorney
By:
2
(Print)
(Title)
(Name)
(Print)
(Title)
City's Standard Agreement — June 2008 revision
cox.
March 15, 2012
National City
Barby Tipton
1243 National City Blvd
National City, CA
91950
SUBJECT: 8th Street 20A
Cox Communications Project No. : 24008
Municipality/Utility Project No. : NC District 24.20A
To Whom It May Concern:
Cox Communications, Incorporated., (COX) desires to enter into a Joint Trench Agreement with
National City for the subject project.
As a Joint Trench applicant, COX is submitting a Joint Trench Proposal; a Joint Trench Offer
identified as Exhibit "A", and three (3) copies of our drawing illustrating the proposed trench routing.
Upon acceptance of this proposal, please return the executed copy to Cox Communications, Inc. These
copies are used to facilitate compensation to the entity performing the work.
Please contact the undersigned, upon awarding the job, with the name and address of the work performing
entity , in order to ensure that contractual obligations are agreed upon between COX and said entity
prior to the commencement of this project.
If I can be of further assistance, or if you should have any questions, please contact me at
619 266 5589
Sincerely,
�, /4'Yil�(�'� c r.�G-7l
COX COMMUNICATIONS, INC.
Brendan Fennelly
System -Development Project Planner
Attachment
JOINT TRENCH OFFER
EXHIBIT "A"
Company Name : COX COMMUNICATIONS, INC.
Project Name : 8th Street 20A
Location : 8th St from NC Blvd to Highland Ave.
Project Job Numbers.
COX 24008
COX PO # 0
cox,
National City NC District 24 20A
SDG&E Design # 0
1a) EXCAVATION- Jointly occupied trench
DESCRIPTION OUANTITY PRICE
Hard digging. 12" section Q 17_30
(xireeur Nicol
Outside Conversion, Hard digging, 12" section
(.;mast arm)
x•iiard digging, 12^ section 0
(.ilba ulm)
0
Outside Conversion, x-Hard digging, 12" section
(vents kko)
Hard digging, 12" section
(with M.6a 3 a Taw boa aa )lea 721
omitting a Joint Trench Proposal; a Joint Trench Offer 0
r (3) copes erwv drawing asialing the ryopos.d hen. routine.
x-Hard digging. 12" section
(wile lace Naad en 3333 l2)
Outside Conversion, x-Hard digging. 12" section
. (win Moo Wad a 21.71 /2)
Hard digging. 12" section
(.its takes 2nd caw. previdr eased an 16.1an)
Outside Conversion, Hard digging, 12" section
(wialeke4 fin cable prowdrb.asda Aran)
x-Hard digging. 12" section
(with taco 4 Zwdcab'e par* boa on man)
Outside Conversion, x-Hard digging, 12" section
(wren Woo 4 2n80.bkproridw band on AnI3)
Service Trench. 1r x 12"
(.era, Mina a It rake en ma. Ptspy large en LMM 13)
Outside Conversion, Service Trench, lr
(w'a Mr. 3 a Priam Prepay basal a ULIZJ
Additional vertical space (18" x 18' window)
Hard digging 0
x-Hard digging
0
211.22
0
0
0
0
0
Q
2448e
a
EXT
O40
]LA2 2 2
21_77 Lgg
21_77 2,22
8_03 34021.26
LOO O:QO
tug
10.89
ZZ
099
QAQ
122
LZQ 09Q
11
12,4
68.62
122
0 100.7$ 0.012.
ALUE $35,915.13
gal JT TOTAL V
1b) EXCAVATION - Communication only trench
30" vertical occupancy space in trench, 18' adde communications
Easy digging. 18" x 30" trench Q 60_93 O.S9
(urp00 d ,edalm.I dire lea Oka Ira.)
Outside Conversion, Easy digging. 18" x 30" trench 0 OQ:QQ 0.00
(unpaved naidmdr diel r.., light traffic)
Average digging, 18" x 30" trench 0 65_12 2.22
(lamad ,6.l - tons. 8.0 )
Outside Conversion, Average digging, 18" x 30" trench 0 65.12 0.00
Nnlaa al ea, mare, bamc)
Ham digging, 18" x 30" trench Q 96_29 0.90
ow.. (mr.ep*)
Outside Conversion, Hard digging, 18" a 30" trench Q BM 0.00
(wimwe Rai repair)
Hard digging, 1 r x 30" trench 20 4242=37 1482.9Q
(Mp M.d4.36aas21 on M74 i3)
Outside Conversion. Hard digging. 16" x 30" trench 255 22.25 26974.93
(win Main 3 a Tartu Neal a SA7lq)
x-Hard digging, 18" x 30" trench 0 132.16 9.00
(withal hr rap*)
Outside Conversion, x-Hard digging, 18" x 30" trench 0 132.16 0.90
(wilier rxr repair)
x-Hard digging. 18" x 30" trench 0 143.70 000
Manor .lip*)
Outside Conversion, x-Hard digging, 18" x 30" trench Q 143.7Q 0.00
Mtn ant rear)
Special cmWeons (In additron to selected trenches)
Concrete cubing and breaking Q 1L93. 2:92
Final repair, concrete streets 0 104.36
0.00
lb) CATV ONLY TOTAL VALUE 528,457.88
2a) MATERIAL & INSTALLATION - joinUy occupied trench
All materials will be provided and delivered to job site or location by Telecom
DESCRIPTION QUANTITY PRICE EXT
9" Round Handhote (FL-e) Q 21.22 UM
1730 HH Single Body 17 21.424 9 21ri4
1730 HH Double Body 1Q 492.20 4¢2330
2.3x 2HH Q 161L9 QQQ
212x4x3 2 imtat QQQ
TELCOA;ATV CONDUIT & MATERIAL INSTALLED BY SDGE
Any conduit Installation • up to 4" j222 j' 2Q2 12329.92
Any conduit bend - up to 24" radius 740 1.80 1332.00
Any conduit bend - up to36"radius 58 MO 9900
3.5 Sk slimly encasement 2 19.11 QQQ
(nerve m.rrts eat) 222
6" warning Tape Q 2.22 9:90
Pull rope 19685. 0.16 3087.41
2a) JT MATERIAL & INSTALLATION. `$26892.34
1. Excavation
a) Joint Trench Total
b) CAN Only Trench Total
2. Material & Installation:
a) Joint Trench Material & Installation Total
b) CAN Only Material & Installation Total
3. Outside Conversion:
e) Joint Trench Total
0) CATV Only Trench Total
2b) MATERIAL & INSTALLATION - communication only trench
Miscellaneous material, labor, equipment and add-ons
These costs are adders to the base trench costs, where appropriate
Asphalt cut & break 0 0.9g
Final Repay Q QQO
Concrete encasement 0 122 122
Shading 0 9.Q2 19
Pedestal Installation 1432 Q QQQ zwil
Pedestal Installation 1010 2 2A1 136.56
Slurry 2 QQQ ttli
Grinding 0 0.00 13.82
4, Material Supplied by CAN: Vaults, peels, handholes, conduit, sweeps, couplers, let Ilne
222
tag
MIL
Qa92
9.22
0.0Q
2h) CATV ONLY. MATERIAL & INSTALLATION $09Q,
535,915.13
$28,457.88
526,892.34
$0.00
580.50
526,974.93
Outside Conversion Total $27,055.43
5. Material Supplied by Contractor: None
6. Other ( Notes : None
$0.00
TOTAL VALUE OF JOINT TRENCH OFFER :
$91,265.35 1
Signature :
March 15, 2012
20A JOINT TRENCH PROPOSAL
COX agrees to pay the National City or its contractor the sum of $91,265.35 for the
construction of a conduit system in accordance with the plans and specifications attached hereto,
incorporated herein and described as follows:
Job Name : 8th Street 20A
Location : 8th St from NC Blvd to Highland Ave.
COX Project No.: 24008
Offeree Project No.: NC District 24 20A
National City to furnish:
1) Trench, backfill, installation of conduit system with pull string and street repair.
2) All of the above item no. 1 to be done to COX governing agency specifications.
3) All changes or additions must be approved by a COX representative.
4) Cox will provide and deliver all Cox materials for said project
5) COX will provide onsight inspection for CATV conduit system.
6) Cox is to be provided as -built drawings once joint trench is complete
See attached cost estimate of separate trench EXHIBIT to correspond with above itemized
requirements.
On Behalf ' Co Co ' m nicat'+
vow
d ���r
Name: 410
Title : (%r
Date :
On Behalf of National City
Signature :
Name:
Title :
Date :
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
xa�coAaRr� J Michael R. Dalla, CMC - City Clerk
619-336-4228 phone / 619-336-4229 fax
June 12, 2012
Brendan Fennelly
Cox Communications, Inc.
5159 Federal Blvd.
San Diego, CA 92105
Dear Brendan,
On June 5`h, 2012, Resolution No. 2012-110 was passed and adopted by the City Council
of the City of National City, authorizing execution of a Joint Trench Offer Agreement
with Cox Communications, Inc.
We are enclosing for your records a certified copy of the above Resolution and a fully
executed original Agreement.
Michael R. Dalla, CMC
City Clerk
Enclosures
cc: Engineering Dept.