HomeMy WebLinkAboutQuality Mechanical Professionals - Civic Police Department Computer Room Air Conditioning - Change Order No. 1*— CALIFORNIA —0- NATION L car Aav ZNCORPORATSD CIVIC CENTER DATA CENTER REDUNDANT AIR CONDITIONING Specification No. 11-02 Contractor: Quality Mechanical Professionals, Inc. Reason/Purpose for this Change Order: The Police Department requires a back up split air conditioning (A/C) system that is substantially similar in kind and complexity to the A/C unit installed by the Contactor in the Data Center room of City Hall for this project. Due to the Contractor's expertise in A/C installations, the satisfactory installation of the Data Center A/C unit, and the favorably negotiated price for this change order, the Engineering Department recommends this change order be approved for the installation of a Trane 4 ton, 13 SEER split A/C system at the National City Police Department. CHANGE ORDER NO. 1 April 26, 2012 The City of National City and Contractor agree to the following change to the original Contract: The Contractor agrees to install a Trane 4 ton 13 SEER split A/C system at the National City Police Department. The installation includes the high voltage electrical supply for the outside condenser, an inside coil fan, a condensation drain line, a refrigeration line set, supports and hangers, a wall mount programmable thermostat and control wiring, a start up test, and a warranty. In addition to the manufacturer's warranty, the Contractor agrees to provide an additional one-year warranty commencing at the time the unit is accepted by the City. The Contractor and City agree that all costs included and requirements of the original bid shall apply and there shall be no other additional costs or deductions for the installation of the Trane 4 ton 13 SEER split NC system. **Special Note: This Change Order requires Council approval before it can become part of the contract. Original Contract Amount $ 38,000.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 38,000.00 28,451.43 New contract amount $ Working days adde10 Working days subtracted: 0 Percent change in Contract to date 74.87% Submitted Proje Approved by: er 66, 451.43 Date......__.__.__.�._.. En ineer Date City Mana er, required for Change Orders $24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by_ QualltyMechanical Professionals Inc ,. ..h ..Q>lie .... ,._ ..._ .. .. ,a6VZ--o4 Z j Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 RESOLUTION NO. 2012 —100 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY RATIFYING CHANGE ORDER NO. 1 BETWEEN THE CITY OF NATIONAL CITY AND QUALITY MECHANICAL PROFESSIONALS, INC., IN THE NOT TO EXCEED AMOUNT OF $28,451.43 TO PROVIDE AND INSTALL A NEW TRANE FOUR -TON SPLIT AIR CONDITIONING SYSTEM IN THE POLICE DEPARTMENT COMPUTER SERVER ROOM IN CONJUNCTION WITH THE CIVIC CENTER DATA CENTER REDUNDANT AIR CONDITIONING PROJECT WHEREAS, the air conditioning for the Police Department computer server room is unable to consistently cool the room to the required temperature for the heat and humidity sensitive equipment; and WHEREAS, the cooling system has unexpectedly failed two times in the past two months, jeopardizing the equipment; and WHEREAS, because there is no backup cooling system for this room, it is necessary to install a backup cooling system to protect the City's investment in the computer systems; and WHEREAS, Quality Mechanical Professionals, Inc., is currently replacing the redundant air conditioning system at the Civic Center Data Center for the not to exceed amount of $38,000. They inspected the Police Department Computer Room cooling system and determined that they can provide and install a new Trane four -ton split Air Conditioning System for the computer room by executing a change order for the current Civic Center contract in the not to exceed amount of $28,451.43; and WHEREAS. on May 9, 2012, the City Manager executed Change Order No.1 to the contract with Quality Mechanical Professionals, Inc., to expedite the ordering of the air conditioning system as any further delays in getting this equipment installed could jeopardize the computer systems contained within the Police Department computer server room, which includes the 911 Computer Aided Dispatch System; and WHEREAS, staff requests that the City Council ratify the City Manager's execution of Change Order No. 1 to the contract with Quality Mechanical Professionals, Inc., to provide and install a new Trane 4 ton split Air Conditioning System in the Police Department Computer Server Room, in an amount not to exceed $28,451.43 NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby ratifies Change Order No. 1 to the contract with Quality Mechanical Professionals, Inc., in the not to exceed amount of $28,451.43 to provide and install a new Trane four -ton split Air Conditioning System for the Police Department computer server room, bringing the total contract amount to $66,451.43. --- Signature Page to Follow --- Resolution No. 2012 — 100 Page Two PASSED and ADOPTED this 15th day of M 2012. on Morrison, ayur ATTEST: Michael R. Daly City Clerk PROVED AS TO FORM: Ilia G City Attor a Silva Passed and adopted by the Council of the City of National City, California, on May 15, 2012 by the following vote, to -wit: Ayes: Councilmembers Morrison, Natividad, Rios, Sotelo-Solis, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California ZIA) j,d‘CityClerk of the Citytional City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2012-100 the City of National City, California, passed and adopted by the Council of said City on May 15, 2012. City Clerk of the City of National City, California By: Deputy CITY OF NATIONAL CITY, CALIFORNIA COUNCIL AGENDA STATEMENT MEETING DATE: May 15, 2012 AGENDA ITEM NO. 6 ITEM TITLE: Resolution of the City Council of the City of National City ratifying Change Order No. 1 between the City of National City and Quality Mechanical Professionals, Inc. in the not to exceed amount of $28,451.43 to provide and install a new Trane Four -Ton Split Air Conditioning System in the Police Department Computer Server Room in conjunction with the Civic Center Data Center Redundant Air Conditioning Project, Specification 11-02. (Funded by Information Systems Maintenance Fund)) PREPARED BY: Barby Tipton PHONE: 336-4583 EXPLANATION: J� L�✓" `�� See attached DEPARTMENT: Development Services -Engineering Division APPROVED BY: FINANCIAL STATEMENT: ACCOUNT NO. APPROVED: APPROVED: Funds are available in expenditure account 629-409-500-598-8037 ENVIRONMENTAL REVIEW: N/A ORDINANCE: INTRODUCTION: FINAL ADOPTION: Finance MIS STAFF RECOMMENDATION: Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION: N/A ATTACHMENTS: 1. Explanation 2. Change Order 3. Resolution EXPLANATION: Recently the air conditioning for the Police Department computer server room was unable to cool the room to the required temperature for the heat and humidity sensitive equipment. There is no back up cooling system for this room. To protect the City's investment in the computer systems within this area, a back-up cooling system is needed. On May 9, 2012, the City Manager signed Change Order No.1, to Quality Mechanical Professionals, Inc. to expedite the ordering of the air conditioning system as any further delays in getting this equipment installed could jeopardize the computer systems contained within the Police Department computer server room, which includes the 911 Computer Aided Dispatch system. Lead time for this equipment is approximately 2 to 3 weeks. Staff is requesting that the City Council ratify the City Manager's execution of a Change Order to Quality Mechanical Professionals, Inc., to provide and install a new Trane 4 ton split Air Conditioning System in the Police Department Computer Server Room, in the amount not to exceed $28,451.43. Currently, Quality Mechanical Professionals, Inc. is replacing the Civic Center Data Center redundant air conditioning. On October 4, 2011, three bids were received and opened for the National City Civic Center Data Center Redundant Air Conditioning Project, Specification 11-02. The lowest responsive bidder was Quality Mechanical Professionals, Inc., with a proposed bid amount of $38,000. This project was awarded to Quality Mechanical Professionals Inc., with the City Manager's signature due to the bid amount. The second lowest bidder was more than $20,000 higher. Quality Mechanical Professionals, Inc. inspected the site and can provide the necessary air conditioning equipment for the Police Department computer server room at a price of $28,451.43, using their current contract with an executed change order. This price is competitive, and installation of the air conditioning system is of essence with summer quickly approaching. This change order exceeds 25% of the original contract amount therefore, City Council approval is required. Funds are available in the Information Systems Maintenance Fund, Account No. 629- 409-500-598-8037. CALIFORNIA -- TI CI( �._ INCORPORATED CIVIC CENTER DATA CENTER REDUNDANT AIR CONDITIONING Specification No. 11-02 Contractor: Quality Mechanical Professionals, Inc. CHANGE ORDER NO. 1 April 26, 2012 Reason/Purpose for this Change Order: The Police Department requires a back up split air conditioning (A/C) system that is substantially similar in kind and complexity to the NC unit installed by the Contactor in the Data Center room of City Hall for this project. Due to the Contractor's expertise in NC installations, the satisfactory installation of the Data Center A/C unit, and the favorably negotiated price for this change order, the Engineering Department recommends this change order be approved for the installation of a Trane 4 ton, 13 SEER split A/C system at the National City Police Department. The City of National City and Contractor agree to the following change to the original Contract: The Contractor agrees to install a Trane 4 ton 13 SEER split A/C system at the National City Police Department. The installation includes the high voltage electrical supply for the outside condenser, an inside coil fan, a condensation drain line, a refrigeration line set, supports and hangers, a wall mount programmable thermostat and control wiring, a start up test, and a warranty. ln addition to the manufacturer's warranty, the Contractor agrees to provide an additional one-year warranty commencing at the time the unit is accepted by the City. The Contractor and City agree that all costs included and requirements of the original bid shall apply and there shall be no other additional costs or deductions for the installation of the Trane 4 ton 13 SEER split A/C system. **Special Note: This Change Order requires Council approval before it can become part of the contract. Original Contract Amount $ 38,000.00 Net change by previously authorized Change Orders......... Subtotal Amount of this change order New contract amount 38,000.00 28,451.43 Working days adde•10 Working days subtracted: 0 Percent change in Contract to date 74.87% Sub it ad Proje landder Gate Date Approved by 66,451.43 sdz Engineer / Date City Manager, required for Change Orders >szas9s Date By signing this Change Order the Contractor confirms that he/she -is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and tabor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Quality _Mechanical Professionals, Inc.: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 RESOLUTION NO. 2012 — RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY RATIFYING CHANGE ORDER NO. 1 BETWEEN THE CITY OF NATIONAL CITY AND QUALITY MECHANICAL PROFESSIONALS, INC., IN THE NOT TO EXCEED AMOUNT OF $28,451.43 TO PROVIDE AND INSTALL A NEW TRANE FOUR -TON SPLIT AIR CONDITIONING SYSTEM IN THE POLICE DEPARTMENT COMPUTER SERVER ROOM IN CONJUNCTION WITH THE CIVIC CENTER DATA CENTER REDUNDANT AIR CONDITIONING PROJECT WHEREAS, the air conditioning for the Police Department computer server room is unable to consistently cool the room to the required temperature for the heat and humidity sensitive equipment; and WHEREAS, the cooling system has unexpectedly failed two times in the past two months, jeopardizing the equipment; and WHEREAS, because there is no backup cooling system for this room, it is necessary to install a backup cooling system to protect the City's investment in the computer systems; and WHEREAS, Quality Mechanical Professionals, Inc., is currently replacing the redundant air conditioning system at the Civic Center Data Center for the not to exceed amount of $38,000. They inspected the Police Department Computer Room cooling system and determined that they can provide and install a new Trane four -ton split Air Conditioning System for the computer room by executing a change order for the current Civic Center contract in the not to exceed amount of $28,451.43; and WHEREAS. on May 9, 2012, the City Manager executed Change Order No.1 to the contract with Quality Mechanical Professionals, Inc., to expedite the ordering of the air conditioning system as any further delays in getting this equipment installed could jeopardize the computer systems contained within the Police Department computer server room, which includes the 911 Computer Aided Dispatch System; and WHEREAS, staff requests that the City Council ratify the City Manager's execution of Change Order No. 1 to the contract with Quality Mechanical Professionals, Inc., to provide and install a new Trane 4 ton split Air Conditioning System in the Police Department Computer Server Room, in an amount not to exceed $28,451.43 NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby ratifies Change Order No. 1 to the contract with Quality Mechanical Professionals, Inc., in the not to exceed amount of $28,451.43 to provide and install a new Trane four -ton split Air Conditioning System for the Police Department computer server room, bringing the total contract amount to $66,451.43. --- Signature Page to Follow --- Resolution No. 2012 — Page Two PASSED and ADOPTED this 15th day of May, 2012. Ron Morrison, Mayor ATTEST: Michael R. Dalla, City Clerk APPROVED AS TO FORM: Claudia Gacitua Silva City Attorney v OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 niTC{jgpd'p,TtD J Michael R. Dalla, CMC - City Clerk 619-336-4228 phone / 619-336-4229 fax Quality Mechanical Professionals Resolution No. 2012-100 Change Order No. 1 Civic Center Data Center Redundant Air Conditioning Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor