8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 1
Specification No. 11-04
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
As of the date of this change order Media 3 is no longer a part of this utility undergrounding project. Currently
390 lineal feet of 2" conduit has been installed for Media 3.
The City of National City and Contractor agree to the following change to the original Contract:
;The Contractor and the City agree to delete the following line items: COMMUNICATIONS (MEDIA 3)
UNDERGROUNDING, #41(S) 60 If of 3" conduit at $2.46/If=$147.60, #42 (S)18,360 If of 2" conduit at
$1.66/If=$30,477.60, #43 (S) 15 SGL's at 631.30 each=$9,469.50 and #44(S) 9 DBL's at 732.95 each=$6,596.55''
;for a total reduction in the contract amount of $46,691.25. These deductions do not effect any other line items
since they were only for Media 3 conduit in joint trenches and Media appurtenances.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 2,339,674.24
Working days add0 Working days subtracted: 0 Percent change in Contract to date -1.96%
'Sub
7/ 1°
Prole anatEjer ` ate
iAppr ved by:
Date `pit Manager, required for Change Orders>$24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepte..� a reed to by Basile Construction, Inc.:
May 22, 2012
2,386,365.49
2,386,365.49
(46,691.25)
-7 it° z--
:Name: Date
Note to Contractor. If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract .
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
RCDA:p,AT
8TH STREET UTILITY UNDERGROUNDINb AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
CHANGE ORDER NO. 2
June 28, 2012
Reason/Purpose for this Change Order:
IThe purpose of this Change Order is provide undergrounding of Access Cable utilities by furnishing and installing
:2" CATV conduit in a trench under D Avenue from the south side of the 8th Street to the north side of 8th Street
;which was not included in the original plans. See Attachment "A", attached hereto and incorporated herein, for a
visual plan of the works to be provided by this Change Order.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor and the City agree that the Contractor shall furnish and install 305 lineal feet of CATV 2" Conduit
'sin the D Avenue trench from the south side of 8th Street to the north side of 8th Street. 290 feet of this conduit
shall be furnished and installed at the same price and conditions as line item 38(S) of the original contract and 15
feet of trench on D Avenue north of 8th Street shall be at same price and conditions as Line Item 36(S) of the
original contract. Compensate for extra traffic control, curb, gutter and sidewalk shall be per Attachment "B",
attached hereto and incorporated herein. The Contractor and City agree that all costs for the construction of the
above works are included of the price of this Change Order.
Original Contract Amount $ 2,386,365.49
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 2,341,978.52
Working days added: 0
Subrrjitte
(46,691.25)
2,339, 674.24
2,304.28
Proje
Approved by:
Working days subtracted: 0
t*
Percent change in Contract to date -1.86%
7-..1 -1
Date
n ineer Date Cit Mana er, required for Change Orders>$24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporate lSerein.
1 Acceptednd awe to b Basile Construction, Inc.:
;Name: ate
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
CHANGE ORDER NO. 2, ATTACHMENT "A"
NAB..
r%OXi'dRhT$-
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 2, Attachment "B"
Specification #11-04
Itemized Breakdwon Qty Unit Unit Cost Item Cost
1) Trench for CATV only per price and conditions in Line Item 36(S) 15 LF 62.06 930.90
2) Furnish and Install CATV 2" Conduit per price and conditions in Line Item 38(S) 290 LF 1.66 481.40
3) Traffic Control 1 LS 275.00 275.00
5% mark-up 13.75 13.75
4) Premium Concrete Replacement* 1 LS 574.50 574.50
5'/a mark-up 28.73 28.73
TOTAL AMOUNT OF CHANGE ORDER:
$ 2,304.28
* Includes replacement of all sidewalk, curb and gutter, and other concrete improvments necessary for conduit installation
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone / 619-336-4229 fax
Basile Construction
Change Order #1 and #2
8th Street Utility Undergrounding &
Sewer Replacement
Judy Hernandez (Engineering) Forwarded Copy of
Change Orders to Contractor