CIVIC CENTER DATA CENTER REDUNDANT AIR CONDITIONING
Specification No. 11-02
Contractor: Quality Mechanical Professionals, Inc.
CHANGE ORDER NO. 2
August 13, 2012
Reason/Purpose for this Change Order:
The Public Works Department has requested that the Contractor connect the Trane 4 ton, 13 SEER split NC
system ("Unit") to an electrical panel ("alternate panel") other than the one originally contemplated for installation.
In order to connect the unit to alternate panel, the Contractor will be required to provide additional materials and
labor.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor agrees to connect the Unit to the electrical panel located in a closet on the north side of the 2nd
floor of the Police Departement. The Change Order includes all amps, wiring, breakers, transformers, bonding,
conduit, hangers, and clips required to connect the unit to the alternate panel. An itemized breakdown of the
labor and materials to be provided under this change order can be found on Attachment "A", which is attached
hereto and incorporated herein. The Contractor agrees to provide an additional one-year warranty for the
change order materials commencing at the time the unit is accepted by the City. The Contractor and City agree
that all costs included and the requirements of the original bid shall apply and there shall be no other additional
costs to the City for this change order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
38,000.00
28,451.43
66,451.43
6,735.55
New contract amount $
Working days added: 10 Working days subtracted: 0
Percent change in Contract to date 92.60%
73,186.98
Submi ed
Proje ana
r
el.›./ 2_
Date
Date
LC
Ci c
Approved by:
Date
City Manager, required for Change orders>$24,999
Date
Cit nqineer
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Quality Mei anical Professionals, Inc.:
Name:
$�t6IZ02
Date
Note to Contractor: If you do not agree wi ange Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
- GAi.IF0RNIA- ,
NATION C
atftv
C. INCORPORATED
CIVIC CENTER DATA CENTER REDUNDANT AIR CONDITIONING CHANGE ORDER NO. 2, Attachment "A"
Specification #11-02
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
Electrician
Hour
20.00
52.30
Sub -Total Labor:
Labor Burden (15%):
TOTAL LABOR:
1,046.00
$ 1,046.00
$ 156.90
$ 1,202.90
MATERIALS
Unit
Qty
Rate
Total
1)
Copper 100 Amp #8 - CU/FT 140'
LS
1.00
4,811.00
4,811.00
4 Wire PNL Feed 100 Amp - CU/FT 140'
PNL C new SQ-D 480 V 60 Amp Main Breaker
Transformer 30 kVA
Cold Water Bond
Conduit and Fittings - 140'
Hangers and Clips
Sub -Total Materials:
Materials Markup (15%):
TOTAL MATERIALS:
$ 4,811.00
$ 721.65
$ 5,532.65
EQUIPMENT
Unit
Qty
Rate
Total
1)
Sub -Total Materials:
Materials Markup:
TOTAL MATERIALS:
Total Labor: $ 1,202.90
Total Materials: $ 5,532.65
Total Equipment: $ -
TOTAL: $ 6,735.55
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
INCORPdiir T -- Michael R. Dalla, CMC - City Clerk
619-336-4228 phone / 619-336-4229 fax
Quality Mechanical Professionals
Change Order #2
Civic Center Data Center Redundant
Air Conditioning Project
Judy Hernandez (Engineering) Forwarded
Copy of Change Order to Quality Mechanical