Loading...
HomeMy WebLinkAbout2012 CON Basile Construction - Change Order #4, #5, #6 and #7 - 8th St Utility UndergroundingWorking days subtracted: 0 CALIFORNtA'.` &TUL^cft INCOIipoRATEP 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT Specification No. 11-04 Contractor: Basile Construction, Inc. CHANGE ORDER NO. 4 August 1, 2012 : Reason/Purpose for this Change Order: !During the trenching for the underground wet utilities on 8th Street and Highland Avenue, the Contractor `encountered additional unmarked abandoned utility conduits that were not shown as existing on the original plans. Due to the location of the conduits, the Contractor was unable to excavate using an Excavator, as calculated in its bid price, and was required to excavate this location by hand resulting in additional labor costs. The City of National City and Contractor agree to the following change to the original Contract: 'The City shall pay the Contractor for the additional labor outlined above in the amount recorded and confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are specified on :Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree that all costs for the additional labor is included in the price of this Change Order. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 2,386,365.49 (38,734.94) 2,347,630.55 398.07 New contract amount $ Working days added: 0 Submitted bvi Projec Approved by: anager City.Engineer / Date Percent change in Contract to date -1.61 % 2,348,028.62 Date City Manager, required for Change Orders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represes all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, i r. ce, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are inc oor-ted herein. Ac.-ptes ar�� agreed to by Basile Construction, Inc.: ame: ' Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc: Engineering project file, Project Manager Telephone (619) 336-4380 CALIFORNIA ,--, TIoN L +14.r 13,11 <_= tNCORYOskTD 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 4, Attachment "A" Specification #11-04 Itemized Breakdwon Qty Unit Unit Cost Item Cost 1) Pipe Layer 2) Pipe Layer 3) Laborer 23.85% Labor Burden 20% Prime Contractor mark-up 23.85% Labor Burden 20% Prime Contractor mark-up 23.85% Labor Burden 20°/o Prime Contractor mark-up 2 EA 44.92 89.84 21.43 22.25 2 EA 44.92 89.84 21.43 22.25 2 EA 44.08 88.16 21.03 21.84 TOTAL AMOUNT OF CHANGE ORDER: 398.07 r • y CALIFORNIA.^ coCfr ram= '.wJ / .-�- INCOR3+ORA"f$D ... 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT Specification No. 11-04 Contractor: Basile Construction, Inc. ;Reason/Purpose for this Change Order: `On June 1, 2012, while trenching for underground wet utilities on 8th Street, the Contractor encountered an )angled sewer lateral that did not comply with City's sewer lateral installation standard requiring laterals to be installed in a perpendicular manner from the sewer main to the property connection point. To comply with the City's sewer lateral installation standard, the Contractor was required to relocate the angled lateral to a different :location than that which resulted in additional costs for labor, materials, and equipment. CHANGE ORDER NO. 5 August 3, 2012 The City of National City and Contractor agree to the following change to the original Contract: 'The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and :confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are 'specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree that all costs for the additional labor, equipment, and materials is included in the price of this Change Order. Original Contract Amount $ 2,386,365.49 Net change by previously authorized Change Orders Subtotal Amount of this change order (38,336.87) 2,348,028.62 707.76 New contract amount $ Working days added: 0 Sub Project ;Approved by: Working days subtracted: 0 Percent change in Contract to date -1.58% cr/1/z Engineer � Date ICity Manag Br, required for change orders>$2a999 Date 2,348,736.38 By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, ins u . nc= profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incor..rated erein. dtoby by Construction, Inc Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 1`•-..CALIFORNIA .-- NATIONAL OTT TNCARP6AATED 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 5, Attachment "A" Specification #11-04 DATE: June 1, 2012 WORK PERFORMED BY: Basile Construction, Inc. DESCRIPTION OF WORK: Lateral @ 10+35, next to power pole DAILY ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman Hour 2.00 42.47 84.94 2) Laborer Hour 2.00 44.08 88.16 3) Operator Hour 2.00 60.08 120,16 Sub -Total Labor: $ 293.26 Labor Burden (23.85%): $ 69.94 Labor Markup (20%): $ 72.64 TOTAL LABOR: $ 435.84 MATERIALS Unit Qty Rate Total 1) Steel Plates Day 3.00 4.13 12.39 2) Shoring Day 2.00 2.57 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: 5.14 $ 17.53 $ 2.63 $ 20.16 EQUIPMENT Unit Qty Rate Total 1) Komatsu Ex 228 Hour 2.00 109.46 218.92 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: 218.92 $ 32.84 $ 251.76 Total Labor: $ 435.84 Total Materials: S 20.16 Total Equipment: $ 251.76 TOTAL: $ 707.76 CALIFORNIA NATION. ei INCORPORATED —� 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 6 Specification No. 11-04 August 3, 2012 Contractor: Basile Construction, Inc. Reason/Purpose for this Change Order: On June 25th, July 2nd, and July 3rd, while installing sewer laterals on 8th Street, the Contractor encountered angled sewer laterals that did not comply with City's sewer lateral installation standard requiring laterals to be installed in a perpendicular manner from the sewer main to the property connection point. To comply with the City's sewer lateral installation standard, the Contractor was required to pothole at multiple locations to determine,', the location where each lateral crossed the private property line. The City of National City and Contractor agree to the following change to the original Contract: 'The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree that all costs for the additional labor, equipment, and materials is included in the price of this Change Order. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order 2,386,365.49 (37,629.11) 2,348,736.38 1,618.49 New contract amount $ Working days added: 0 Subm tte b : Approved by: Working days subtracted: 0 Percent change in Contract to date -1.51 % 2,350,354.87 Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, p •fit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorpora Accepter and agr �d lofiy..Basile Construction Inc.: Name: Date Note to Contractor: If you do not agree with this ChangeOrder you may be directed with to proceed this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc: Engineering project file, Project Manager Telephone (619) 336-4380 CALIFORNIA N T N L Cflp `-- INCORYOAATi':O 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 8, Attachment "A" Specification #11-04 DATE: June 25, July 2, and July 3 WORK PERFORMED BY: Basile Construction, Inc. DESCRIPTION OF WORK: Pothole Unknown laterals DAILY ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman Hour 5.50 44.08 242.44 2) Operator Hour 2.00 60.08 120.16 3) Laborer Hour 2.00 44.08 88.16 4) Pipelayer (2) Hour 5.00 44.92 224.60 5) Laborer Hour 4.00 44.08 176.32 6) Saw Cutter Hour 1.00 44.92 44.92 Sub -Total Labor: Labor Burden (23.85%): Labor Markup (20%): TOTAL LABOR: 5 896.60 $ 213.84 $ 222.09 $ 1,332.53 MATERIALS Unit Qty Rate Total 1) 90 LB Readymix EA 10.00 4.88 48.80 2) Sub -Total Materials: Materials Markup (150/0): TOTAL MATERIALS: 48.80 $ 7.32 $ 56.12 EQUIPMENT Unit Qty Rate Total 1) Compressor 185 Cubic Ft/Min Hour 3.50 20.01 70.04 2) Case Mini Excavator Hour 2.00 49.56 99.12 3) Equipment Truck (Saw Cutter) Hour 1.00 30.70 30.70 Sub -Total Materials: $ 199.86 Materials Markup (15%): $ 29.98 TOTAL MATERIALS: $ 229.84 Total Labor: $ 1,332.53 Total Materials: $ 56.12 Total Equipment: $ 229.84 TOTAL: $ 1,618.49 • CALIFORNIA - N ,TIOClint 1NCOR ORATED -. 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 7 Specification No. 11-04 August 3, 2012 Contractor: Basile Construction, Inc. Reason/Purpose for this Change Order: On June 28, 2012, while installing sewer on 8th Street, the Contractor encountered unmarked abandoned utility !conduits that were not shown as existing on the original plans. Due to the location of the conduits, the Contractor ;was not permitted to excavate the location with and Excavaot per its bid and was required excavate this location by hand and with a mini excavator resulting in additional labor and equipment costs. The City of National City and Contractor agree to the following change to the original Contract: The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and :confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are ;specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree that all costs for the additional labor, equipment, and materials is included in the price of this Change Order. Original Contract Amount $ 2,386,365.49 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Submii ted)y Projeanage`r Approved by: CI Engineer (36,010.62) 2,350,354.87 720.89 $ 2,351,075.76 Percent change in Contract to date -1.48% Working days subtracted: 0 Date Date City Manager, required for Change Orders >$24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, in • a e, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are inc • oorah d herein. Acgreed to by Basile Construction, Inc.: 5 1 Z--. Name: Ddte Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc: Engineering project file, Project Manager Telephone (619) 336-4380 CALIFORNIA.*�� NATIONAL Orr LJ J / 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 7, Attachment "A" Specification #11-04 DATE: June 28, 2012 WORK PERFORMED BY: Basile Construction, Inc. DESCRIPTION OF WORK: Excavate by hand and mini excavator DAILY ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman Hour 1.00 44.08 44.08 2) Operator Hour 2.00 60.08 120.16 3) Pipelayer Hour 2.00 44.92 89.84 4) Laborer Hour 3.50 44.08 154.28 Sub -Total Labor: $ 408.36 Labor Burden (23.85%): $ 97.39 Labor Markup (20a/0): $ 101.15 TOTAL LABOR: $ 606.90 MATERIALS Unit Qty Rate Total 1) 2) Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) Case Mini Excavator Hour 2.00 49.56 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: 99.12 99.12 $ 14.87 $ 113.99 Total Labor: $ Total Materials: $ Total Equipment: $ 606.90 113.99 TOTAL: $ 720.89 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 INCORX' t A ' Michael R. Dalia, CMC - City Clerk 619-336-4228 phone / 619-336-4229 fax Basile Construction Change Order #4, #5, #6 and #7 8th Street Utility Undergrounding & Sewer Replacement Judy Hernandez (Engineering) Forwarded Copies of Change Orders to Basile Construction