HomeMy WebLinkAbout2012 CON Palm Engineering - Change Order #2- Drainage Improvements Project+- CALIFORNIA -4- 1,800.00 189, 012.90 1,200.00 NTIONAL cif `-- INCORPORATE - DRAINAGE PROJECT, FY 11-12 Specification No. 11-07 Contractor: Palm Engineering and Construction, Inc. Reason/Purpose for this Change Order: In accordance with Change Order No. 1, the Contractor, SDG&E, and the inspector determined in the field that one hundred lineal feet of concrete cover was required for the uncovered gas main on D Avenue and 5th Street. :As Change Order No. 1 provided only for sixty (60) lineal feet of concrete cover, this Change Order is necessary to reflect the additional 40 lineal feet of concrete cover required to be installed. The City of National City and Contractor agree to the following change to the original Contract: The Contractor agrees to install an additional 40 feet of concrete cover over the top of the existing high pressure gas main on D Avenue at 5th Street in conformance with the SDG&E specifications, procedures and the drawings attached to Change Order No. 1. The Contractor shall coordinate all work with SDG&E and document all work and utilities on their As -Built drawings. The price shall be $30 per lineal foot of concrete cover placed and shall include the costs for all work, overhead and profit involved in placing the concrete cap and preparing each location to accept the final improvements. Original Contract Amount $ 187,212.90 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 5- Working days subtracted: 0 Percent change in Contract to date 1.60% Submitt9d by: City ngineer Date ,City Manager, required for Change Orders 424,999 CHANGE ORDER NO. 2 July 2, 2012 190,212.90 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to Py Palm-Eglneerincsnd Construction, Inc.: Name a._._ Date7/3o/r; Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone / 619-336-4229 fax Palm Engineering Change Order #2 Drainage Improvements Project, FY 11-12 Judy Hernandez (Engineering) Forwarded Copy of Change Order to Palm Engineering