HomeMy WebLinkAbout2012 CON Palm Engineering - Change Order #1, #2, #3 - Safe Routes to Schools Phase 3 Pedestrian CrossingCitywide Safe Routes to School, Phase III - Pedestrian Crossing Project
Specification No. 12-03
Contractor: Palm Engineering
CHANGE ORDER NO. 1
August 21, 2012
Reason/Purpose for this Change Order:
Modify driveway design to address driveway step not shown on the original plans.
The City of National City and Contractor agree to the following change to the original Contract:
Remove and replace driveway at the north east corner of Palmer Way and Palmer St. to facilitate reduced
driveway design and saw cut existing sidewalk in order to ensure safe pedestrian path of travel. (See
contractor proposal attached dated 8/16/2012 identified as RFQ#1.)
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
$ 556,132.00
556,132.00
1,147.01
New contract amount $ 557,279.01
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 0.21 %
Subm" ed by:
Proj ct Manage D yq,
0-11
1Appybved by:
t
City Manager, rered for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agree b tor's name):
r- )
Name:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
Palm Engineering Construction Company, Inc.
Proposal for Extra Work for City of National City
Job Name: City Wide Safe Routs to School
Proposal Date: 8/16/12
Description of Work: Remove and Replace Driveway and Curb and Gutter
E102
Bobcat
2
35.41
70.82
EE103
Breaker Attacment
2
4.22
8.44
V1003
Saw Truck
2
30.70
61.40
T408
Saw
2
7.22
14.44
Concrete 560-C-3200
1.28
90.20
115.456
Concrete 520-C-2500
0.74
87.85
65.01
335.57
ctor's Representative's Signature
er s Signature
Option:
lob # 1202
RFQ#1
Operator - Group 3
Cement Mason
Laboror - Group 4
Laboror - Group 1
REG
OT
REG
OT
REG
OT
REG
OT
2
6
2
4
59.16
42.85
44.28
42.57
118.32
257.10
88.56
170.28
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
A
634.26
335.57
+ 20 % Markup on Labor Cost
+ 15 % Markup on Equip, Matrl, & Work
+ _15_ % Markup on Subcontracted Work
SUBTOTAL
+ % Bond & Liability Insurance
TOTAL
(A)
126.85
(B)
50.33
(C)
1,147.01
(D)
1,147.01
Citywide Safe Routes to School, Phase III - Pedestrian Crossing Project
Specification No. 12-03
Contractor: Palm Engineering
CHANGE ORDER NO. 2
August 31, 2012
Reason/Purpose for this Change Order:
Provide Flagman during school drop off and pick up hours as requested by school district and National City.
The City of National City and Contractor agree to the following change to the original Contract:
Compensation on T&M basis for flagman at Earle and Palmer Way for week ending 8/3/2012 and 8/10/2012
per ticket 1470 and 1475 attached.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 559,624.77
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 0.63%
$ 556,132.00
1,147.01
557, 279.01
2,345.76
Submi,by:
Date
oved by:
.440, 91(AbZ
City ngineer Date
CityManager, required for Change Orders
rs>$zasss Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to b(� name):
Name:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
Work Order No:
Palm Engineering Construction Company, Inc. Ticket 14 7 0
Daily Extra Work Report Authorization
Date Performed: Af s -- g j/o//ypate of Report:
Description of Work: PA- FL01/4:7A4, ./
Comments: ah5f5-7rv4 541-/,„/ Pex 7/1&, . /2r=cGv Sri
To .S Ly �i.. z= p6-vcs.7L/.aov5 /E7--16�Gc �znA
tt-II;� / I3,.is€s •77�.et' i':7/,I AD;.,,r,—,e_1.. -77 '4J ?.�.1-'c-•S
Equip.
No.
Equipment
Hours
Hourly
Rate
Extended
Amounts
Material and/or Approved Work done by Specialists (Subs)
Description
# Units
Unit Cost
Extended
Total Cost of Equipment, Materials, & Work
Contractor's Representative's Signature
Resident Engineer's Signature (Work done under Greenbook Section 3-3 & 3-5)
resident Engineer's Signature (All other Work)
C.C.O. No: Report No:
Job # t/
Laboror / Description
Hours
c�/�-Tyrj
:r-✓e-
REG
*Hourly
Rate
gS-
Extended
Amounts
OT
REG
/0
0,13
OT
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
TOTAL LABOR
A
9PC. 64
B
+ -2 % Markup on Labor Cost
+ I S % Markup on Equip, Matrl, & Work
+ % Markup on Subcontracted Work
SUBTOTAL
+ 1 ' ' % Bond & Liability Insurance
TOTAL
(A)
(B)
(C)
l/ 7/.
(D)
l 4-4 7
irf.79
Palm Engineering Construction Company, Inc.
Daily Extra Work Report Authorization
Work Order No: Date Performed: /3 ° --1/3%2 Date of Report: i° / 2- C.C.O. No: Report No:
Description of Work: j�1 ov ,�, [ job # / 2 1!
Comments: Qs 7i S 7 17 Sc-k, (- Pe--i-L.ti i-
4- �t.,,z/ s , vim" 6 ./e L c�i,t c Le_? ecleaJ�«Z 1
} 11
v.e G t4 , (}JY` b c.LS£S TL1-43 u_1 c .' SoLl h(.I.G if�O to '
7.ane S 1
Equip.
No.
Equipment
Hours
Hourly
Rate
Extended
Amounts
Material and/or Approved Work done by Specialists (Subs)
Description
# Units
Unit Cost
Extended
Total Cost of Equipment, Materials, & Work
Contractor's Representative's Signature
Resident Engineer's Signature (Work done under Greenbook Section 3-3 & 3.5)
t C,U:, 'fillY1C ve_v INCt�}1�fN LIEU
Resident Engineer's Signature (All other Work)
Ticket N ° 14 7 5
Laboror / Description
Hours
*Hourly
Rate
Extended
Amounts
Cic! �eF-_T ritA
REG
OT
REG
/v
<«g9
Ykir Yo
OT
REG
F
`1�&3
390.E y
OT
REG
99.46
OT
REG
OT
REG
OT
REG
OT
REG
0T
REG
0"1'
TOTAL LABOR
A
B
+ O % Markup on Labor Cost
% Markup on Equip, Matrl, & Work
+ % Markup on Subcontracted Work
+ % Bond & Liability lnsurance
SUBTOTAL
TOTAL
(A)
(B)
(C)
>�l73�Y
(D)
f6.7a
Citywide Safe Routes to School, Phase III - Pedestrian Crossing Project
Specification No. 12-03
Contractor: Palm Engineering
CHANGE ORDER NO. 3
September 4, 2012
Reason/Purpose for this Change Order:
Per city's request to remove and replace driveway at 2437 Highland Ave.
The City of National City and Contractor agree to the following change to the original Contract:
Remove existing concrete driveway, curb & gutter, sidewalk, portion of asphalt driveway and connect existing
drain at 2437 Highland Ave. and replace with a modified driveway configuration that complies with ADA
standards at an agreed cost per the attached proposal dated 9/4/2012 identified as RFQ #2.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 564,714.40
Working days added: 1 Working days subtracted: 0 Percent change in Contract to date 1.54%
$ 556,132.00
3,492.77
559, 624.77
5,089.63
Submjttgd by:
oved by:
roj cEa t Manager
City ngineer
Date
Date
City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to b
Name:
rarr of r>arne�
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
Palm Engineering Construction Company, Inc.
Proposal for Extra Work for City of National City
lob Name: City of National City. Modified Driveway Proposal Date: 9/4/12
Description of Work: Remove and Replace Driveway
CO
Eta.' �1 r
o tx
14burl Rate
E102
Bobcat
3
35.41
106.23
EE103
BreakerAttacment
3
4.22
12.66
V1003
Saw Truck
2
30.70
61.40
T408
Saw
2
7.22
14.44
E116
Roller D24
2
38.07
76.14
T409
Wacker Compactor
4
8.82
35.28
V1000
10 Wheeler
8
66.43
531.44
V1002
Foremans Truck
11
30.70
337.70
1 5 11pti<i'.i. 5: y +�.iftUtift
`
C
d^'
Concrete
5
115.00
575.00
Asphalt
2
15.00
30.00
Dump Fee
1
100.00
100.00
Traffic Control
1
500.00
500.00
Clear and Grub
1
100.00
100.00
! °�
f)Ti
2,480.29
Contract's Representative's Signature
Resident Engineer's Signature
lob # 1211
Option:
RFQ # 2
ride
Laboror - Group 4 (saw cut)
REG
2
44.28
88.56
OT
Laboror - Group 1 (saw cut)
Operator- Group 3 (demo)
REG
2
42.57
85.14
OT
REG
3
59.16
177.48
OT
Laboror - Group 1 (demo)
REG
3
42.57
127.71
OT
Truck Driver G3 (dump)
REG
8
44.19
353.52
OT
Laboror - Group 3 (Compact)
REG
4
43.44
173.76
OT
Laboror - Group 1 (Compact)
REG
4
42.57
170.28
OT
Cement Mason (form, 2men)
REG
4
42.85
171.40
01'
Cement Mason (pour, finish 4men)
REG
8
42.85
342.80
OT
Laboror - Group 3 (Ashpalt, 2men)
REG
4
43.44
173.76
OT
A
1,864.41
2,480.29
+ 20 % Markup on Labor Cost
+ 15 % Markup on Equip, Matrl, & Work
+ _15 % Markup on Subcontracted Work
SUBTOTAL
+ % Bond & Liability Insurance
TOTAL
(A)
372.88
(B)
372.04
(C)
5,089.63
(D)
5,089.63
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone / 619-336-4229 fax
Palm Engineering Construction
Change Order #1, #2, #3
Citywide Safe Routes to School
Phase III, Pedestrian Crossing Project
Lynn Cole (Engineering) Forwarded
Copies of Change Orders to Palm Engineering