8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
During the trenching for the underground dry utilities on D Avenue to the south of 8th Street. tha'
:encountered an existing abandoned asbestos cement waterline pipe (ACP) tha E
the original plans. After conducting a financial analysis, the Engineering Depar LH Psi G6 OR, Q
additional
oint trench is a
e cost effective
native
Therefore, ithe purpose of this rChange Order istoto removing, backfilland epa an addition ' s r R r r \, \�
Trench and to relocate the utility trench two feet to the west of the unmarked abl
CHANGE ORDER NO. 3
July 5, 2012
The City of National City and Contractor agree to the following change to the orig
The Contractor shall backfill and repair 40 lineal feet of Mainline Joint Trench at D Avenue, south of 8th Street.
The Contractor shall backfill and repair the Mainline Joint Trench at the same price and subject to the same
terms and conditions as line item 11(S) of the original contract. The Contractor shall provide saw cutting, traffic
,control, and install AC Pavement as required for the backfill and repair of the additional Mainline Joint Trench and:
;laterals. The Contractor shall be compensated for these additional items in accordance with negotiated prices for,
these items of work, as stated on Attachment "A" to this Change Order, attached hereto and incorporated herein.
The Contractor and City agree that all costs for the construction of the above works are included in the price of
this Change Order.
Original Contract Amount $ 2,386,365.49
Net change by previously authorized Change Orders
Subtotal
Amount of this change orde.
(44,386.97)
2,341,978.53
5,652.03
New contract amount $
Working days added: 0
Submitted tly:
Projec
Approved by:
Working days subtracted: 0
y 94 /2
City lCngineer / Date City Maager required for change orders>$24,999 Date
Percent change in Contract to date - 1.62%
2,347,630.55
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorp..te. herein.
Accel ed a dFreed to by Basile Construction, Inc.:
Name:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Utility Company Acceptance of and Agreement to this Change Order found on Page 2
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
^=^...CALIFORNIA ^^t*
NATION:. CIT
,- INCORPDIiATED .!
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 3
Specification No. 11-04
Utility Company Acceptance Declarations
Accepted and agreed to by CoxCom, Inc. d/b/a Cox Communications:
Page 2 of 2
Date ig-4/
By signing this Change Order the Utility Company confirms that it is familiar with the terms and conditions of the Change Order and that it
accepts and agrees to the fairly negotiated terms, conditions, and price for this Change Order.
Accepted and reed to by SDG&E.
-27 - IZ
`Name: ' Date
By signing this Change Order the Utility Company confirms that it is familiar with the terms and conditions of the Change Order and that it
accepts and agrees to the fairly negotiated terms, conditions, and price for this Change Order.
;Accepted and agreed to by AT&T.:
Name: W Dated? .2J—
By signing this Change Order the Utility Company confirms that it is familiar with the terms and conditions of the Change Order and that it
accepts and agrees to the fairly negotiated terms, conditions, and price for this Change Order.
Originais: City Clerk, Contractor, Utilities cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
� . CALIFORNIA
NATICONAL
I+VCORPCRA' EV
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 3, Attachment "A"
Specification #11-04
Itemized Breakdwon Qty Unit Unit Cost Item Cost
1) Saw Cut
2) Traffic Control
3) AC Pavement
4) Mainline Join Trench (Per Line Item 11)
150 LF 2.50 375.00
5% Prime Contractor mark-up 18.75
1 LS 595.00 595.00
5% Prime Contractor mark-up 29.75
150 SF 9.31 1,396.50
S% Prime Contractor mark-up 69.83
40 LF 79.18 3,167.20
TOTAL AMOUNT OF CHANGE ORDER:
$ 5,652.03
•
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0 Working days subtracted: 0
Submitted
Proect
anagel
Approved by:
City.En9ineer
+�-CALIFORNIA ^-^
NATIONAL CITY
3 'J I
tNeonnonwree
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
After approval, COX Communications representatives decided to install higher capcity Cable TV vaults than
shown on the original plans. COX Communications agrees to compensate the City of National City for the full
price of this Change Order.
CHANGE ORDER NO. 8
August 4, 2012
[The City of National City and Contractor agree to the following change to the original Contract:
The Contractor shall trench thirty (30) lineal feet for Cable TV conduit, furnish and install 180 lineal feet of Cable
TV (1) 2" conduit, furnish and install seven (7) Cable TV Vaults (2'x3'x3'), remove and replace 25 square feet of
brick sidewalk, and remove and replace pavers. Contractor shall trench for CATV at the same price and subject
to the same terms and conditions as line item 36(S) of the original contract. Contractor shall furnish and install
ECATV 2" Conduit at the same price and subject to the same terms and conditions as line item 38(S) of the
original contract. The Contractor shall be compensated in accordance with other prices for the other items of
work, as stated on Attachment "A", attached hereto and incorporated herein. The Contractor agrees that all
costs for the construction of the above works are included in the price of this Change Order.
Original Contract Amount $ 2,386,365.49
(35,289.73)
2,351,075.76
6,940.18
Percent change in Contract to date -1.19%
2,358,015.94
er Date
Date !City Manager, required for Change Orders $24.999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insur. • e, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorp• ate. herein.
IAcce ted Agreed to by Basile Construction, Inc.:
Name:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Utility Company Representatives Accept and Agree to this Change Order on Page 2 of this Change Order
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA --►
NATIONAL CITIr
:W) J =.-,
IRCo$poRAT&o -�
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Accepted and agreed to by_ CoxCom, Inc. d/b/a Cox Communications
Name:
Accepted and agreed to by SDG&E:
Name:
Ac emoted and agreed to by AT&T
Name:
CHANGE ORDER NO. 8
Page 2 of 2
D 92s' /2.
Date
Date
—a
Date
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
•'ri• CALIFORNIA .�,.
NATIONAL CITY
`. rNCOA)`OAATED
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 8, Attachment "A"
Specification #11-04
Itemized 8reakdwon Qty Unit Unit Cost Item Cost
1) Remove and Replace Pavers
5% Prime Contractor mark-up
2) Furnish and Install CATV Vault (2'x3'x3')
5% Prime Contractor mark-up
3) Remove and Replace Brick Sidewalk
5% Prime Contractor mark-up
4) Traffic Control
5% Prime Contractor mark-up
5) Credit for Trench Restoration
6) Trench for CATV Only (per Line Item 36S)
7) Furnish and Install CATV (1) 2" Conduit (per Line Item 38S)
8) Credit for CATV Double Pull Box 17"x30"x24"
1 LS 965.00 965.00
48.25
7 EA 985.00 6,895.00
344.75
25 SF 18.00 450.00
22.50
1 LS 595.00 595.00
29.75
19.5 SF (8.87) (172.97)
30 LF 62.06 1,861.80
180 LF 1.66 298.80
6 EA (732.95) (4,397.70)
TOTAL AMOUNT OF CHANGE ORDER:
$ 6,940.18
Working days subtracted: 0
Percent change in Contract to date -1.11 %
— CALIFORN;IA
NATIONAL C1iTt
(/^ 1' ,3
'\- `NCOApOAATED -'
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
CHANGE ORDER NO. 9
August 20, 2012
Reason/Purpose for this Change Order:
While excavating in an alley way to install surface improvements adjacent to 8th Street between B Avenue and C
;Avenue, the Contractor encountered unsuitable subgrade material. The Contractor and Inspector agreed in the
jfield that the existing subgrade material was unsuitable and the Contractor was instructed to remove and dispose
of the unsuitable subgrade material and import suitable subgrade.
The City of National City and Contractor agree to the following change to the original Contract:
;The Contractor removed and disposed of unsuitable subgrade material and imported 22.96 TONS of suitable
Isubgrade for the alley way adjacent to 8th Street between B Avenue and C Avenue. The work performed and the.
;quantities placed were verified by the Inspector in the field. The Contractor shall be compensated for these items'
of work in accordance with the unit bid price for Line Item 70, $78.56 per TON. The calculation for compensation
I under this change order is found on Attachment "A", attached hereto and incorporated herein. The Contractor
land City agree that all costs for the work described above are included in the price of this Change Order.
Original Contract Amount $ 2,386,365.49
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
(28,349.55)
2,358,015.94
1,803.74
New contract amount $
Working days added: 0
Submitted by
7
Pfoject/vta'ger ... Date
74...71.2... k)l-13
LCity ngineer Date LCIty Mana er required for Change Orders>$2a999 Date
2,359,819.68
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incor.. ate. herein.
Accented - d greed to by pasile Construction Inc.:
Name: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Utility Company Acceptance of and Agreement to this Change Order found on Page 2
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CAL,IF.,ORNIA -
j TTO Ctry
(/---�.'t._�
,vco Rponn'O -- �
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Utility Company Acceptance Declarations
Accepted and agreed to by CoxCom, Inc. d/bia Cox Communications:
/2-..5/ezz
Narne: Date
By signing this Change Order the Utility Company confirms`. hat it is familiar with the terms and conditions of the Change Order and that it
accept) and agrees to the fairly negotiated terms, conditions, and price for this Change Order.
CHANGE ORDER NO
Page 2 of 2
Accepted and agreed to piSDG((&E:
Name:
- Z7- /
Date
By signing this Change Order the Utility Company confirms that it is familiar with the terms and conditions of the Change Order and that it
accepts and agrees to the fairly negotiated terms, conditions, and price for this Change Order.
[Accepted and agreed to byAT&T:
Name: Date -.23-/t
By signing this Change Order the Utility Company confirms that it is familiar with the terms and conditions of the Change Order and that it
accepts and agrees to the fairly negotiated terms, conditions, and price for this Change Order.
Originals: City Clerk, Contractor Utilities cc_ Engineering project file, Project Manager)
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA
NATIONAL Cirr
kSV�1 11.
CORpORAxev
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 9, Attachment "A"
Specification #11-04
Itemized Breakdwon Qty Unit Unit Cost Item Cost
1) Remove, disposal & Replace Unsiutable Sub -grade Material (per Line Item 70) 22.96 TON
78.56 1,803,74
TOTAL AMOUNT OF CHANGE ORDER:
I $ 1,803.74
•° CALIFORNIA
NATIONAL CITv
�- �roa�o�cnreo .J
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
While excavating near manhole 265C, the Contractor encountered an electric conduit that was not shown as
:existing on the original plans. The Contractor was required to break up and remove the conduit in order to
continue excavating for the installation of manhole 265C. This resulted in additional costs to the Contractor for
labor, equipment, and materials.
CHANGE ORDER NO. 11
August 31, 2012
The City of National City and Contractor agree to the following change to the original Contract:
,The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and
confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are
specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree
that all costs for the additional labor, equipment, and materials is included in the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
2,386,365.49
(20,419.01)
2,365,946.48
2,817.69
New contract amount $
Working days added: 0
Sub
Proiec
Approved
Working days subtracted: 0
Percent change in Contract to date -0.74%
Date Ci Manager, required for Change Orders>$24,999 Date
2,368,764.17
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, incluuing but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insur .e, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incor . rate. herein.
Acce ted a . a c reed to b Basile Construction, Inc.:
7/24, (1.--
Name: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA
NATIONAL Cry
r-- 1 3J 1"i
INCORY4RATL
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 11, Attachment "A"
Specification #11-04
DATE: July 17, August 7, August 8
WORK PERFORMED BY: Basiie Construction, Inc.
DESCRIPTION OF WORK: Removal of concrete encased electical conduit
DAILY ACCOUNTING FOR TIME, EQUIPMENT AND MATERIALS
LABOR
Unit
Qty
Wage
Total
1
Foreman
Hour
3.50
42.47
148.65
2
Operator
Hour
4.00
60.08
240.32
3
Pipelayer
Hour
6.00
44.92
269.52
4
Laborer
Hour
4.00
44.08
176.32
Sub -Total Labor:
$ 834.81
Labor Burden (23.85%):
$ 199.10
Labor Markup (20%):
$ 206.78
TOTAL LABOR:
$ 1,240.69
EQUIPMENT
Unit
Qty
Rate
Total
1
Backhoe w/ Breaker
Hour
2.00
52.35
104.70
2
Komatsu Excavator
Hour
2.00
109.46
218.92
3
Utility Truck
Hour
3.50
30.70
107.45
4
Loader
Hour
2.00
74.27
148.54
5
Whacker
Hour
2.00
3.74
7.48
Sub -Total Materials:
$ 587.09
Equipment Markup (15°k):
$ 88.06
TOTAL MATERIALS:
$ 675.15
MATERIALS
Unit
Qty
Rate
Total
1
2
Traffic Control
Day
0.75
10.84
8.13
3
Sub -Total Materials:
Materials Markup (15°h):
TOTAL MATERIALS:
$ 8.13
$
1.22
$ 9.35
Subcontractor
Unit
Qty
Rate
Total
1
Lekos - 7/17 (includes 5% mark up)
LS
1.00
225.75
225.75
2
Lekos - 8/7 (includes 5% mark up)
LS
1.00
666.75
666.75
TOTAL SUBCONTRACTOR: $ 892.50
Total Labor: $ 1,240.69
Total Materials: $ 675.15
Total Equipment: $ 9.35
Subcontractor: $ 892.50
TOTAL: $ 2,817.69
•
•
=w.CALIFORNIA
NATIONA1L tarry
�._ INOORPOR ATED
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 12
Specification No. 11-04 August 31, 2012
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
On July 17, 2012, the Field Inspector advised that manhole #265C, that was to be placed in the sidewal,k should I'
have a locking manhole cover to prevent vandalism in the sidewalk area. The original contract does not call out
for a locking manhole cover.
The City of National City and Contractor agree to the following change to the original Contract:
..The Contractor shall install one M-4 locking manhole ring and cover at Manhole 265C on 8th Street. The
calculation for compensation under this change order is found on Attachment "A", attached hereto and
incorporated herein. The Contractor and City agree that all costs for the work described above are included in
;the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
*Submit#ed by:
Project nager
IlApproved by:
Working days subtracted: 0
2,386,365.49
(17,601.32)
2,368,764.17
247.83
Percent change in Contract to date -0.73%
9�2.7f/ 2.
2,369,012.00
n ineer Date CityMana er,requredforchangeorders>s24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as descrihed above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, i ran e, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are in .rporat>. herein.
reed to by Basile Construction, Inc.:
jName: u,i�_
Date _
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply :: th the contract requirements of submitting a written protest to protect your claim.
1243 National City Boulevard, National City, CA 91950
Telephone Ib19) 336-4380
CALIFORNIA
NATWNM/ ant
�? Vll %.
� - INCORiOAA'1'>±V '
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 12, Attachment "A"
Specification #11-04
Itemized Breakdwon Qty Unit Unit Cost Item Cost
1) Install Locking M-4 Manhole Cover 1.00 EA
247.83 247.83
TOTAL AMOUNT OF CHANGE ORDER:
247.83
CALIFORNIA
T.INTIONAL,
'�.-- 3NCU1tFORA'P�p -�
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
CHANGE ORDER NO. 13
August 31, 2012
Reason/Purpose for this Change Order:
On July 25, 2012, while excavating for manhole #264 on 8th Street, the Contractor encountered a concrete
encased 18" drop sewer main on the outside of the manhole that was not called out on the original plans. The
,Contractor was required to excavate additional soil to place larger box shoring shield and to remove the encased
pipe in order to continue removing and installing manhole # 264. This resulted in additional costs for labor,
[equipment, and materials.
The City of National City and Contractor agree to the following change to the original Contract:
The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and
confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are
specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree
that all costs for the additional labor, equipment, and materials is included in the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
2, 386, 365.49
(17,353.49)
2,369,012.00
3,308.78
New contract amount $
Working days added: 0 Working days subtracted: 0
Submi ted b
roject M .ger
'Approved by:
'City engineer
Percent change in Contract to date -0.59%
2,372,320.78
o - ti m a. er Date
•
Date City Manager, required for change Orders >$24,999 Date
By signing this Change Order the Corr -acts, conri-ms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. li this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represe all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, in r ran e, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are inc .Drat:dher ein.
Acc reed to by Basile Construction Inc.:
!Name: f Dat
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
�q�,;" CALIFORNIA.v-�-
N iv 1ON7 L CFF
1 j:11 Er
INCORFOAA.rEU
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 13, Attachment "A"
Specification #11-04
DATE: July 25, 2012
WORK PERFORMED BY: Basile Construction, Inc.
DESCRIPTION OF WORK: Remove unmarked drop main
DAILY ACCOUNTING FOR TIME, EQUIPMENT AND MATERIALS
LABOR
Unit
Qty
Wage
Total
1
Foreman
Hour
4.00
42.47
169.88
2
Operator (2)
Hour
8.00
60.08
480.64
3
Pipelayer (2)
Hour
8.00
44.92
359.36
4
Sub -Total Labor:
$ 1,009.88
Labor Burden (23.85%):
$ 240.86
Labor Markup (20%):
$ 250.15
TOTAL LABOR:
$ 1,500.89
EQUIPMENT
Unit
Qty
Rate
Total
1
Utility Truck
Hour
4.00
30.70
122.80
2
Komatsu 308 (Excavator)
Hour
4.00
136.82
547.28
3
Kawasaki 702 (Loader)
Hour
4.00
74.27
297.08
4
Bobcat Skid Steer
Hour
4.00
25.35
101.40
Sub -Total Materials:
$ 1,068.56
Equipment Markup (15°/u):
$ 160.28
TOTAL MATERIALS:
$ 1,228.84
MATERIALS
Unit
Qty
Rate
Total
1
Trench Box
Day
0.50
100.00
50.00
2
Stacking Pin Set
Day
0.50
89.00
44.50
3
Bridle
Day
0.50
15.00
7.50
4
Traffic Control
Hour
4.00
10.38
41.52
5
Super 10 Trucking
Hour
4.00
90.00
360.00
Sub -Total Materials:
$ 503.52
Materials Markup (15a/0):
$ 75.53
TOTAL MATERIALS:
$ 579.05
Total Labor: $ 1,500.89
Total Materials: $ 1,228.84
Total Equipment: $ 579.05
TOTAL: $ 3,308.78
-
CALIFORNIA - -
NATIONAL C "p
A'173:/ -
•
INOORPO$ATEP -�
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
`Reason/Purpose for this Change Order:
On July 26, 2012, the Contractor continued breaking and removing the drop main outside mahole #264 and
encountered an unmarked drop main outside manhole #265B. The Contractor began removing the concrete
drop sewer main. This resulted in additional costs to the Contractor for labor, equipment, and materials.
CHANGE ORDER NO. 14
August 31, 2012
The City of National City and Contractor agree to the following change to the original Contract:
The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and
confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are
specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree
,that all costs for the additional labor, equipment, and materials is included in the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
• Submitted y:
roject na9er
• Approved by:
Cit
n Ineer
Working days subtracted: 0
2,386,365.49
(14,044.71)
2,372,320.78
5,675.93
Percent change in Contract to date -0.35%
2,377,996.71
y ,� I,-)`) ---
r Date
Date 'CityManager required for Change Orders >$24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, ins :n.e, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incor..rat:. herein.
Acc-.ted reed to by Basile Construction, Inc.:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
a
CALIFORNIA''--:
NAT O AL eirr
• INCORPORATED
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 14, Attachment "A"
Specification #11-04
DATE: July 26, 2012
WORK PERFORMED BY: Basile Construction, Inc.
DESCRIPTION OF WORK: Remove unmarked drop main
DAILY ACCOUNTING FOR TIME, EQUIPMENT AND MATERIALS
LABOR
Unit
Qty
Wage
Total
1
Foreman
Hour
6.00
42.47
254.82
2
Operator (2)
Hour
12.00
60.08
720.96
3
Pipelayer (2)
Hour
12.00
44.92
539.04
4
Sub -Total Labor:
$ 1,514.82
Labor Burden (23.85%):
$ 361.28
Labor Markup (20%):
$ 375.22
TOTAL LABOR:
$ 2,251.32
EQUIPMENT
Unit
Qty
Rate
Total
1
Utility Truck
Hour
6.00
30.70
184.20
2
Komatsu 308 (Excavator)
Hour
6.00
136.82
820.92
3
Kawasaki702
Hour
6.00
74.27
445.62
4
Bobcat Backhoe w/ Breaker
Hour
6.00
35.98
215.88
5
Bobcat Skid Steer
Hour
6.00
25.35
152.10
Sub -Total Materials:
$ 1,818.72
Equipment Markup (150/0):
$ 272.81
TOTAL MATERIALS:
$ 2,091.53
MATERIALS
Unit
Qty
Rate
Total
1
Trench Box
Day
0.75
100.00
478.92
2
Stacking Pin Set of 4
Day
0.75
89.00
66.75
3
Bridle
Day
0.75
15.00
11.25
4
Traffic Control
Hour
6.00
10.38
62.28
5
Super 10 Trucking
Hour
6.00
90.00
540.00
Sub -Total Materials:
$ 1,159.20
Materials Markup (150/o):
$ 173.88
TOTAL MATERIALS:
$ 1,333.08
Total Labor: $ 2,251.32
Total Materials: $ 2,091.53
Total Equipment: $ 1,333.08
TOTAL: $ 5,675.93
August 31, 2012
CALIFORNIA
NATIONAL Iry
nyconPo$&TEo
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 15
Specification No. 11-04
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
On July 27, 2012, the Contractor finished the removal of the concrete encased sewer main drops outside the
,exisiting manholes. This resulted in additional costs to the Contractor for labor, equipment, and materials.
The City of National City and Contractor agree to the following change to the original Contract:
,The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and
confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are
;specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree
that all costs for the additional labor, equipment, and materials is included in the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 2,381,433.88
Working days added: 0
Submittgd by:
2,386,365.49
(8,368.78)
2,377,996.71
3,437.17
Project Maki er
Approved by:
City Engineer
Working days subtracted: 0 Percent change in Contract to date -0.21%
1� t
Date
Date JiCity Manager, required for Change Orders >$24909 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, ter . . conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a .mplet: work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and repr ents at osts associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, surance profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are in .rporated erein.
Accpted a greed to_by8asile Construction, Inc.:
Name:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
�-= CALIFORNIA s.
NN ONAL c
1:3<39
INCORPORAIBD -'
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 15, Attachment "A"
Specification #11-04
DATE: July 27, 2012
WORK PERFORMED BY: Basile Construction, Inc.
DESCRIPTION OF WORK: Remove unmarked drop main
DAILY ACCOUNTING FOR TIME, EQUIPMENT AND MATERIALS
LABOR
Unit
Qty
Wage
Total
1
Foreman
Hour
4.00
42.47
169.88
2
Operator (2)
Hour
8.00
60.08
480.64
3
Pipelayer (2)
Hour
8.00
44.92
359.36
4
Sub -Total Labor:
$ 1,009.88
Labor Burden (23.85%):
$ 240.86
Labor Markup (20%):
$ 250.15
TOTAL LABOR:
$ 1,500.89
EQUIPMENT
Unit
Qty
Rate
Total
1
Utility Truck
Hour
4.00
30.70
122.80
2
Komatsu 308 (Excavator)
Hour
4.00
136.82
547.28
3
Kawasaki 702 (Loader)
Hour
4.00
74.27
297.08
4
Bobcat Skid Steer
Hour
4.00
25.35
101.40
5
Bypass Pump (3)
Hour
12.00
3.29
39.48
6
Suction hose
Hour
12.00
0.11
1.32
7
Outlet hose
Hour
12.00
0.16
1.92
Sub -Total Materials:
Equipment Markup (15%):
TOTAL MATERIALS:
$ 1,111 28
$ 166.69
$ 1,277.97
MATERIALS
Unit
Qty
Rate
Total
1
Trench Box
Day
0.50
100.00
478.92
2
Stacking Pin Set of 4
Day
0.50
89.00
44.50
3
Bridle
Day
0.50
15.00
7.50
4
Traffic Control
Hour
4.00
10.38
41.52
Sub-Tota
Materials Markup
TOTAL MATERIALS:
Materials:
(15%):
$ 572.44
$ 85.87
$ 658.31
Total Labor: $ 1,500.89
Total Materials: $ 1,277.97
Total Equipment: $ 658.31
TOTAL: $ 3,437.17
(.'4CA`-i-\ti�
^..CALIFORNIA..g=�
NATIONAL CLT
... INCORPORATED
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 16
Specification No. 11-04 August 31, 2012
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
On July 30, 2012, the Contractor cutout of manhole #264 riser to accomodate the drop main re -installation and
set 18" SDR 35 PVC sewer main drop inside manhole #264. The Contractor encountered an unknown old
concrete sewer main approximately 25' east of manhole #265B, just below the flow line grade of the new pipe to
be installed, which discharged large amounts of fluid. City crews could not identify this pipe. It was determined
that this pipe was not live and was to be removed and disposed of. These items required the Contractor to
remove additional oversaturated subgrade and pump out additional fluid. This resulted in additional costs to the
Contractor for labor, equipment, and materials.
The City of National City and Contractor agree to the following change to the original Contract:
The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and
'confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are
specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree
that all costs for the additional labor, equipment, and materials is included in the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
2,386,365.49
(4,931.61)
2,381,433.88
5,381.95
New contract amount $
Working days added: 0 Working days subtracted: 0
Submitted by:
Project
Approved by:
Cit(Engineer
r i/2 /72,
Date City Manager, required for Change Orders >$24999 Date
Percent change in Contract to date 0.02%
2,386,815.83
a fe �� Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, in .. • -, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are inc. •orate. herein.
Acc
Name:
ed to byBasile Construction, Inc.:
Note to Contractor: If you do not agree ,1'itl:.i.is C`,ange Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORM IA
Tt ,,qq yy L Cf
� - MCORPORAZVID
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 16, Attachment "A"
Specification #11-04
DATE: July 30, 2012
WORK PERFORMED BY: Basile Construction, Inc.
DESCRIPTION OF WORK: Remove unmarked encases sewer main
DAILY ACCOUNTING FOR TIME, EQUIPMENT AND MATERIALS
LABOR
Unit
Qty
Wage
Total
1
Foreman
Hour
4.00
42.47
169.88
2
operator (2)
Hour
8.00
60.08
480.64
3
Pipelayer (2)
Hour
8.00
44.92
359.36
4
Sub -Total Labor:
$ 1,009.88
Labor Burden (23.85%):
$ 240.86
Labor Markup (20%):
$ 250.15
TOTAL LABOR:
$ 1,500.89
EQUIPMENT
Unit
Qty
Rate
Total
1
Utility Truck
Hour
4.00
30.70
122.80
2
Komatsu 308 (Excavator)
Hour
4.00
100.53
402.12
3
Kawasaki 702 (Loader)
Hour
4.00
74.27
297.08
4
Bobcat Skid Steer
Hour
4.00
25.35
101.40
5
Bypass Pump (3)
Hour
12.00
3.29
39.48
6
Suction hose
Hour
12.00
0.11
1.32
7
Outlet hose
Hour
12.00
0.16
1.92
Sub -Total Materials:
Materials Markup (15%):
TOTAL MATERIALS:
$ 966.12
$ 144.92
$ 1,111.04
MATERIALS
Unit
Qty
Rate
Total
1
Trench Shoring
Hour
4.00
11.37
45.48
2
Traffic Control
Hour
4.00
10.38
41.52
4
18" PVC Sewer Pipe
LF
20.00
23.95
479.00
5
18" PVC Sewer Tee
EA
1.00
780.65
780.65
6
18" PVC Sewer 90
EA
1.00
702.06
702.06
7
Super 10
Hour
4.00
90.00
360.00
Sub -Total Materials:
$ 2,408.71
Materials Markup (15%):
$ 361.31
TOTAL MATERIALS:
$ 2,770.02
Total Labor:
Total Materials:
Total Equipment:
TOTAL:
1,500.89
1,111.04
2,770.02
5,381.95
2,386,815.83
746.10
Percent change in Contract to date 0.05%
CALIFORNIA r
y ATIONAL ciy
.. INC0RPORA-T1P -.!
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
CHANGE ORDER NO. 17
August 31, 2012
Reason/Purpose for this Change Order:
On August 8, 2012, while excavating on 8th Street, it was deteremined by the Field Engineer that teh Contractor
could stop removing the an unknown existing concrete sewer main at the manhole located at station 13+10 at a
grade below our new manhole. The Contractor installed a concrete plug in order to continue with the installation
of the sewer main and manholes. This resulted in additional costs to the Contractor for labor, equipmnet, and
!materials.
The City of National City and Contractor agree to the following change to the original Contract:
'The City shall pay the Contractor for the additional labor, equipment, and materials in the amount recorded and
confirmed by the field Inspector. The worker classifications and hours worked for the additional labor are
specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree
that all costs for the additional labor, equipment, and materials is included in the price of this Change Order.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
2,386,365.49
450.34
Amount of this change order
New contract amount $
Working days added: 0 Working days subtracted: 0
Submitted by:
City'Engineer / Date 'City Manager, required for Change Orders >S24999 Date
2,387,561.93
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insur- ce, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incor..rated erein.
Acce
ed to by Basile Construction, Inc.:
!Name: Date
Note to Contractor If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
'�--� CA -II FOR IAm¢r
NATIONAL C T
'"�-- 1 :W
INCORPORATCD
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 17, Attachment "A"
Specification #11-04
DATE: August 8, 2012
WORK PERFORMED BY: Basile Construction, Inc.
DESCRIPTION OF WORK: Concrete plug and fill
DAILY ACCOUNTING FOR TIME, EQUIPMENT AND MATERIALS
LABOR
Unit
Wa
ge Wa a
Total
1
Foreman
Hour
1.00
42.47
42.47
2
Operator
Hour
1.00
60.08
60.08
3
Pipelayer
Hour
1.00
44.92
44.92
-
Sub -Total Labor:
$ 147.47
Labor Burden (23.85%):
$ 35.17
Labor Markup (20%):
$ 36.53
TOTAL LABOR:
$ 219.17
EQUIPMENT
Unit
Qty
Rate
Total
1
Utility Truck
Hour
1.00
30.70
30.70
2
Komatsu 308 (Excavator)
Hour
1.00
136.82
136.82
3
-
4
5
Sub -Total Materials:
Equipment Markup (15%):
TOTAL MATERIALS:
$ 167.52
$ 25.13
$ 192.65
MATERIALS
Unit
Qty
Rate
Total
1
Concrete
Yd
2.60
111.80
290.68
2
_
3-
_
4
Sub -Total Materials:
Materials Markup (15%/a):
TOTAL MATERIALS:
$ 290.68
$ 43.60
$ 334.28
Total Labor: $ 219.17
Total Materials: 5 192.65
Total Equipment: $ 334.28
TOTAL: $ 746.10
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 18
Specification No. 11-04 September 24, 2012
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
!While excavating for the installation of sewer on 8th Street from approximately 25 feet east of manhole 265E to
:the manhole at Roosevelt, the Contractor encountered an old abandoned concrete sewer line with oversaturated,
'unsuitable subgrade material at the flow line of the new sewer main that was progressively getting deeper. At
,the direction of the Field Engineer, the Contractor removed and disposed of the old sewer main and the
;unsuitable material and replaced it with 82 TONS of suitable import material. This removal and replacement of
!unsuitable subgrade is of similar character to the requirements of line item #70.
The City of National City and Contractor agree to the following change to the original Contract:
:The Contractor agreed to remove and dispose of the old existing sewer and the unsuitable subgrade material
land replace it with 82 TONS of suitable subgrade as directed by the Field Engineer. Although there is no line
item for this work, the Contractor and City agree that the Contractor will be compensated at the same rate as
Line Item #70, $78.56 per TON, as this item is substantially similar in nature and scope to the work actually
!completed. The itemized breakdown for compensation under this Change Order is found on Attachment "A",
which is attached hereto and incorporated herein. The Contractor and City agree that all costs for this work is
gincluded in the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
2,386,365.49
1,196.44
2,387,561.93
Amount of this change order 6,441.92
New contract amount $
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 0.32%
2,394,003.85
City Manager, required for Change Orders 424,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents al -. s associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insura r -, pro , etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorpo -ted her
Accep •d and . r1 l to by Basile Construction, Inc.:
Name:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
* CALIFORNIA
NATI f
LtaJ l
rNCO&POS4A'1'�
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 18, Attachment "A"
Specification #11-04
Itemized Breakdwon Qty Unit Unit Cost Item Cost
1) Remove, dispose of, and replace unsuitable subgrade material 82.00 TON
78.56 6,441.92
TOTAL AMOUNT OF CHANGE ORDER:
$ 6,441.92
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone / 619-336-4229 fax
BASILE CONSTRUCTION
Change Order #s 3, 8, 9, 11- 18
8th Street Utility Undergrounding
& Sewer Replacement
Judy Hernandez (Engineering) Forwarded
Copy of Change Orders to Basile Construction