Loading...
HomeMy WebLinkAbout2012 CON Koch Armstrong - Change Order #3 - Street Resurfacing Project FY 12-13CALIFORNIA ^0^ NATIONAL airy IcatV 1 CORPORATf%D NATIONAL CITY STREET RESURFACING AND CONCRETE IMPROVEMENTS CHANGE ORDER NO. 3 Specification No. 12-06 December 6, 2012 Contractor. Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: This change order shall add the removal and replacment of 272 SF of concrete driveway at 30th Street, west of Harding Avenue. The City of National City and Contractor agree to the following change to the original Contract: The Contractor shall remove and replace 272 SF of driveway at the end of 30th Street at 30th Street, west of Harding Avenue, in the same manner and subject to the same requirements as line item 24, Remove and Replace PCC Driveway. The Contractor shall be compensated for these additional items in accordance with negotiated prices for these items of work, as stated on Attachment "A" to this Change Order, attached hereto and incorporated herein. The Contractor and City agree that all costs for the construction of the above works are included of the price of this Change Order. Original Contract Amount $ 730,609.24 Net change by previously authorized Change Orders (72,930.00) Subtotal 657,679.24 Amount of this change order 3,944.00 New contract amount ................................. $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date -9.44% Submjtted Project arfa Approved by: lamale/ 6` U2 D 661,623.24 Date City ngineer % Date City Manager, required for Change Orders >a24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, teens and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Koch -Armstrong General Engineering, Inc.: eoref �,( 6,-rZ Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 +r- CALIFORNIA �* NATIONAL CITY �- txooaeoRAT>4D --1 NATIONAL CITY STREET RESURFACING AND CONCRETE IMPROVEMENTS CHANGE ORDER NO. 3, Attachment "A" Specification No. 12-06 Itemized Breakdwon Qty Unit Unit Cost Item Cost 1) Remove and replace driveway 272.00 SF 14.50 3,944.00 GRAND TOTAL: $ 3,944.00 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone / 619-336-4229 fax KOCH ARMSTRONG GENERAL ENGINEERING Change Order #3 Street Resurfacing Project, FY 12-13 Judy Hernandez (Engineering) Forwarded Copy of Change Order to Koch Armstrong