HomeMy WebLinkAbout2012 CON Basile Construction - Change Order #19 and #20 - 8th St Utility Undergrounding4—, CALIFORNIA .a NATIONAL CM 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT Specification No. 11-04 Contractor: Basile Construction, Inc. Reason/Purpose for this Change Order: To adjust line item quantities to reflect actual AT&T quantities installed per the DBLs. CHANGE ORDER NO. 19 November 15, 2012 The City of National City and the Contractor agree to the following change to the original Contract: The quantities found on Attachment "A", attached hereto and incorporated herein, represent the final total quantities installed for the Project for those respective line items. Original Contract Amount $ 2,386,365.49 Net change by previously authorized Change Orders 7,638.36 2,394,003.85 Amount of this change order 81,897.96 New contract amount S 2,475,901.81 Working days added: 0 Subm' : • by: Subtotal Working days subtracted: 0 Percent change in Contract to date 3.75% let 7/3(e Z nitneer ---_.--------_.___-.— Date C Ma : r required for Chong.) order. >s24.9ee Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated Its price, terms and conditions. t this Change Order is approved. Contractor wit provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and ati .... associated with the work. including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, ice, etc. and that them will be no further compensation. All of the terms and conditions of the original contract documents are . • :led . . Contractor Approval not required. fp thy paella Construction Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 19, Attachment "A" Specification #11-04 No. Item Unit Contract Quantity Actual Quan Unit Price Total Dollar Increase 29(S) Trench for Telco Only LF 775 1,825 62.06 65,163.00 30(S) Furnish and Install Telephone 2" Conduit IF 980 2,993 1.82 3,663.66 31(S) Furnish and install Telephone 4" Conduit LF 5,220 10,311 3.42 17,411.22 32(S) Fur ishh and Install Telephone CMPH w/ Grond EA 2 0 920.20 (1,840.40) 33(S) Furnish and Install Telephone CPLM12 EA 4 0 624.88 (2,499.52) 34(S) Furnish and Install Telephone Pullbox 2' x 3 x3 EA 5 5 1,888.55 35(S) Furnish and Install Telephone Pullbox 3'x5'x4' (w/ drag off cover) EA 1 1 3,086.95 TOTAL: 81,897.96 4— CALIFORNIA 4.4 NAT ON L ) NCOH,pOR ATED 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 20 Specification No. 11-04 Contractor: Basile Construction, Inc. Reason/Purpose for this Change Order: To adjust line item quantities to reflect actual SDG&E quantities and joint mainline trench installed per the DBLs. The City of National City, SDG&E, and Contractor agree to the following change to the original Contract: The quantities found on Attachment "A", attached hereto and incorporated herein, represent the final total quantities installed for the Project for those respective line items. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitt- • by: =nglneer Date 2,386,365.49 89,536.32 2,475,901.81 136,281.27 Percent change in Contract to date 9.46% 2,612,183.08 �z-..L3-Pa_ Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a co r • •le work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and repre -nts a costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, it uranc:, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are inc rporate herein. Contractor Approval not required. Acc • pled a d ./! eed to by Basile Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFQRNIA re. NATIONAL C'irr �.- INCORPORATED 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 20 Specification No. 11-04 Utility Company Acceptance Declarations Accepted and agreed to bby_CoxCom, Inc. d/b/a Cox Communications: Page 2 of 2 Name: Date By signing this Change Order the Utility Company confirms that it is familiar with the terms and conditions of the Change Order and that it accepts and agrees to the fairly negotiated terms, conditions, and price for this Change Order. Accepted and agreed to by SDG&E: Name: Date By signing this Change Order the Utility Company confirms that it is familiar with the terms and conditions of the Change Order and that it accepts and agrees to the fairly negotiated terms, conditions, and price for this Change Order. Accepted and agreed to by AT&T. Name Date By signing this Change Order the Utility Company confirms that it is familiar with the terms and conditions of the Change Order and that it accepts and agrees to the fairly negotiated terms, conditions, and price for this Change Order. Originals._ City Clerk Contractor Utilities cc Engineering project file Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 20, Attachment "A" Specification #11-04 No. Item Unit Contract Quantity Actual Quantity Unit Price Delta 11(S) Mainline Joint Trench LF 6,250 7,759.00 79.18 119,482.62 12(S) Private Property Service Trench LF 930 787.00 28.89 (4,131.27) 13(5) Furnish and Install Electric Conduit, 5" LF 1,280 2,489.00 4.92 5,948.28 14(S) Furnish and Install Electric Conduit, 4" LF 8,550 9,709.00 4.01 4,647.59 15(S) Furnish and Install Electric Conduit, 3" LF 5,420 4,007.00 2.73 (3,857.49) 16(S) Furnish and Install Electric Conduit, 2" LF 130 117.00 1.82 (23.66) 17(S) Furnish And Install Electric Handhole Equipment Enclosure 3312 HH EA 6 6.00 251.45 18(S) Furnish And Install Electric Handhole Equipment Enclosure 3313 HH with Traffic Cover EA 5 5.00 1,578.25 - 19(5) Furnish And Install Electric Handhole Equipment Enclosure 3313 HH with Parkway Cover EA 2 2.00 1,535.45 - 20(S) Furnish And Install Electric Handhole Equipment Enclosure 3314 HH with Parkway Cover EA 1 1.00 6,896.15 - 21(S) Furnish And Install Electric Handhole Equipment Enclosure 3315 HH with Parkway Cover EA 1 1.00 9,399.95 - 22(S) Furnish and Install Electric Transformer 3427 Concrete Pad EA 1 1.00 2,819.45 23(S) Furnish And Install Electric 3316 HH with Traffic Cover EA 3 4.00 11,984.00 11,984.00 24(S) Furnish and Install Electric Handhole Equipment Enclosure 3309.2 HH EA 14 14.00 770.40 25(S) Furnish And Install Electric 3316 HH with Parkway Cover EA 1 1.00 12,385.25 26(S) Furnish And Install Electric Transformer 3421 Concrete Pad EA 19 19.00 572.45 27(S) Adjust Handhole to Finished Grade EA 6 7.00 802.50 802.50 28(S) Concrete Encasement LF 6,950 7,107.00 9.10 1,428.70 TOTAL: 136,281.27 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone / 619-336-4229 fax BASILE CONSTRUCTION Change Order #19 and #20 8th Street Utility Undergrounding and Sewer Replacement Judy Hernandez (Engineering) Forwarded Copy of Change Orders to Basile Construction