HomeMy WebLinkAbout2012 CON Basile Construction - Change Order #10 - 8th St Utility Undergrounding+k^ CALIFORNIA INCORPORATED ,../ 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT Specification No. 11-04 Contractor: Basile Construction, Inc. Reason/Purpose for this Change Order: [While constructing the Harbor View Condo Project on 8th Avenue and D Street in National City, the Developer 'failed to underground utilities on the southeast corner of the development per its agreement with the City. The 'City has since obtained funds from the property owner to complete this undergrounding. The current contractor will be performing similar undergrounding work on 8th Street as a part of the current project and therefore the Engineering Department recommends that this work be added to the current project. CHANGE ORDER NO. 10 August 31, 2012 The City of National City and Contractor agree to the following change to the original Contract: The Contractor shall install 68 LF of Mainline Trench, furnish and install 68 LF of 2" electric conduit, and install 68' LF of concrete encasement to the southeast of the condo development located at 8th Avenue and D Street. The ;Contractor shall be compensated for these items of work in accordance with the unit bid price for these items of 'work. The calculation for compensation under this change order is found on Attachment "A", attached hereto and/ incorporated herein. The Contractor and City agree that all costs for the work described above are included in !the price of this Change Order. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 2,386,365.49 (26,545.81) 2,359,819.68 6,126.80 New contract amount $ Working days added: 0 Working days subtracted: 0 Submitted by: /Apr ed by: C Engineer er Date 7 Date CityMana er, required for Change Orders >$2499 Date Percent change in Contract to date -0.86% 2,365,946.48 Date , By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorr.rat, d herein. Acce a freed to by Basile Construction, [Name: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 +'•� CALIFORNIA -4, xNconroRA'r8D '-' 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 10, Attachment "A" Specification #11-04 Itemized Breakdwon Qty Unit Unit Cost Item Cost 1 Mainline Trench (per line item 11(S)) 68.00 LF 79.18 2 Furnish and install Electric Conduit, 2" (per line item 16(S)) 68.00 LF 1.82 3 Concrete Encasement (per line item 28(5)) 68.00 LF 9.10 TOTAL AMOUNT OF CHANGE ORDER: 5,384.24 123.76 618.80 $ 6,126.80