HomeMy WebLinkAboutZasueta Contracting, Inc. - Shade Construction Fire Station #34 - Change Order #1NATIONAL CITY SHADE STRUCTURE FOR FIRE DEPARTMENT NO. 34 Specification No. 12-11 Contractor: Zasueta Contracting, Inc. .Reason/Purpose for this Change Order: To provide and install an additional drop down side to shade canopy structure at Fire Department Station No. 34. CHANGE ORDER NO. 1 February 23, 2013 The City of National City and Contractor agree to the following change to the original Contract: !The Contractor shall provide and install an additional drop down side to the shade canopy structure at Fire ;Department Station No. 34 that matches the southside drop down shade in size, texture, and color. The lump =sum price for this change order is a negotiated price of $6,478.00. The lump sum change order price includes all ;plans, permits, labor, materials, and equipment required to complete this work. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 5 VSlorking days subtracted: 0 Submitted . y: Date 69,714.00 69,714.00 6,478.00 Percent change in Contract to date 9.29% City grneer Date City Manage re wr for Change orders>$24999 Date 76,192.00 By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. IAccepted and agreed to jjy Zasueta Contracting Inc.: !Name: to Note to Contractor: If do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may procee under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk ZASUETA CONTRACTING Change Order #1 Fire Station #34 Shade Construction Lynn Cole (Engineering) Forwarded Copy of Change Order to Zasueta Contracting