EMERGENCY REMOVAL & REPLACEMENT OF GROVE STREET STORM DRAIN CHANGE ORDER NO. 1
Specification No. (Emergency Work) February 25, 2013
Contractor: MJC Construction
Reason/Purpose for this Change Order:
-The existing storm drain was found to make a 45 degree angle bend at the property right of way line on Grove
'Street and not a large radius sweep. For standard design and maintenance purposes an A-4 clean out will be
added at the angle point in the right of way.
'The City of National City and Contractor agree to the following change to the original Contract:
!The Contractor and the City agree that the Contractor shall install an A-4 clean -out per SDRSD D-9 in the new
18" storm drain system in the public right of way adjacent to the property line on Grove Street and the manhole
?cover shall be set at the future sidewalk grade for the lump sum price of six thousand dollars ($6,000).
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 4 Working days subtracted: 0
Submisted by:
Date
43,125.00
43,125.00
6,000.00
Percent change in Contract to date 13.91 %
ty• %�,.,rf %lam -a /Y -,[, 9 .
•Ci Ln ;Weer Date Ci Mana r,requldf rc ngeOrders>324,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
49,125.00
;Accepted and a. reed to by MJC Construction:
3/ 7 i.3
'Name Da
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
MJC CONSTRUCTION
Change Order #1
Removal & Replacement of Pipe
Judy Hernandez (Engineering) Forwarded Copy
of Change Order to MJC Construction