HomeMy WebLinkAbout2013 CON Basile Construction - 8th St Utility Undergrounding - Change Order #28ITCALIFORNIA: >.*
ONL C 1
INOOIIPOAATED i
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
Reason/Purpose for this Change Order:
Upon mobilizing to complete Change Order No. 10, SDG&E instructed the Contractor to cease work on the
change order until SDG&E was able to seta utility pole at 9th and D. This resulted in an approximately three
month delay. Due to the delay, the Contractor was required to remove all equipment from the work site and to re
mobilize their equipment in order to complete Change Order No. 10. This resulted in additional costs to the
Contractor.
CHANGE ORDER NO. 28
April 14, 2013
The City of National City and Contractor agree to the following change to the original Contract:
The cost for the additional mobilization is specified on Attachment "A", which is attached hereto and incorporated
herein. The Contractor and City agree that all costs for any additional labor, equipment, materials, or other costs '!
is included in the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
2,386,365.49
253, 511.75
2,639,877.24
525.00
New contract amount $
Working days added: 0
Submit, d by:
Cit n ineer
Working days subtracted: 0
Percent change in Contract to date 10.65%
2,640,402.24
Date City Manager, required for Change Orders>$24.999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insur• • e, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorp ate. herein.
Acce. ed a . agreed to by 8 iiF t✓cnotruction, Inc.:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORMIA:+n*
$ATI AL �i,
�.. INCORPORATED
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 28, Attachment "A"
Specification #11-04
Itemized Breakdwon
Qty Unit Unit Cost Item Cost
1)
Re -mobilization to complete Change Order No. 10
1.00
EA
500.00
Subtotal:
Contractor Markup (5%):
TOTAL AMOUNT OF CHANGE ORDER:
500.00
500.00
25.00
525.00
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
BASILE CONSTRUCTION
8th Street Utility Undergrounding
and Sewer Replacement
Change Order #28
Lynn Cole (Engineering) Forwarded Copy
of Change Order to Basile Construction