HomeMy WebLinkAbout2013 CON Basile Construction - 8th St Utility Undergrounding - Change Order #29CALIFORNIA ATIOAAL CITY tmconroRATto 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT Specification No. 11-04 Contractor: Basile Construction, Inc. CHANGE ORDER NO. 29 April 14, 2013 Reason/Purpose for this Change Order: The Contractor's bid for bond expenses was based on the original line items of work and the original contract amount. As actual work performed exceeded the bid amounts, the Contractor has incurred further bonding costs. The additional line items and change order resulted in $208,977.94 in additional dollar amounts earned for this contract. This Change Order reflects the Contractor's actual cost and is less than the industry standard. The City of National City and Contractor agree to the following change to the original Contract: The Contractor's cost for additional bonding is specified on Attachment "A", which is attached hereto and incorporated herein. The Contractor and City agree that all costs for any additional bonding on the entirety of the project is included in the price of this Change Order. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 2,386,365.49 254,036.75 2,640,402.24 2,089.78 New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 10.73% Submitt=. by: Cit n ineer --/3 Date NA 2,642,492.02 Date (City Manager, required for Change Orders >$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insur rofit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are inco rated herein. Acc pted and agreed lo byBasile Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order';w may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONALyc''a /'�,, �JI:J� , \.. INCORPORATED 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 29, Attachment "A" Specification #11-04 Itemized Breakdwon Qty Unit Unit Cost Item Cost 1) Additions to Contract 1.00 LS 208,977.94 Bond (1%): TOTAL AMOUNT OF CHANGE ORDER: 208,977.94 2,089.78 $ 2,089.78 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk BASILE CONSTRUCTION Change Order #29 8th Street Utility Undergrounding and Sewer Replacement Lynn Cole (Engineering) Forwarded Copy of Change Order to Basile Construction