HomeMy WebLinkAbout2013 CON Basile Construction - 8th St Utility Undergrounding - Change Order #29CALIFORNIA
ATIOAAL CITY
tmconroRATto
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT
Specification No. 11-04
Contractor: Basile Construction, Inc.
CHANGE ORDER NO. 29
April 14, 2013
Reason/Purpose for this Change Order:
The Contractor's bid for bond expenses was based on the original line items of work and the original contract
amount. As actual work performed exceeded the bid amounts, the Contractor has incurred further bonding
costs. The additional line items and change order resulted in $208,977.94 in additional dollar amounts earned
for this contract. This Change Order reflects the Contractor's actual cost and is less than the industry standard.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor's cost for additional bonding is specified on Attachment "A", which is attached hereto and
incorporated herein. The Contractor and City agree that all costs for any additional bonding on the entirety of the
project is included in the price of this Change Order.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
2,386,365.49
254,036.75
2,640,402.24
2,089.78
New contract amount $
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 10.73%
Submitt=. by:
Cit n ineer
--/3
Date
NA
2,642,492.02
Date (City Manager, required for Change Orders >$24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insur rofit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are inco rated herein.
Acc pted and agreed lo byBasile Construction, Inc.:
Name:
Date
Note to Contractor: If you do not agree with this Change Order';w may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA
NATIONALyc''a
/'�,, �JI:J� ,
\.. INCORPORATED
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 29, Attachment "A"
Specification #11-04
Itemized Breakdwon
Qty Unit Unit Cost Item Cost
1)
Additions to Contract
1.00
LS
208,977.94
Bond (1%):
TOTAL AMOUNT OF CHANGE ORDER:
208,977.94
2,089.78
$ 2,089.78
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
BASILE CONSTRUCTION
Change Order #29
8th Street Utility Undergrounding
and Sewer Replacement
Lynn Cole (Engineering) Forwarded Copy
of Change Order to Basile Construction