Loading...
HomeMy WebLinkAbout2013 CON Basile Construction - 8th St Utility Undergrounding - Notice of CompletionPLEASE COMPLETE THIS INFOR1'IATION RECORDING REQUESTED BY: CITY ENGINEER CITY OF NATIONAL -CITY 1243 National City Blvd. National City, CA 91950 AND WHEN RECORDED MAIL TO: CITY CLERK OF NATIONAL CITY 1243 National City Blvd. National City, CA 91950 DOC # 2013-0138610 11111111011111111111111111111111111111111111111101111 MAR 04, 2013 11:28 AM OFFICIAL RECORDS SAN DIEGO COUNTY RECORDER'S OFFICE Ernest J. Dronenburg, Jr , COUNTY RECORDER FEES: 0.00 PAGES 2 1 IIIIII IIIII III1I IIIII IIIII III0I IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII I111 THIS SPACE FOR RECORDER'S USE ONLY (Note: This document is recorded on behalf of the City of National City, a municipal corporation, and is exempt from Recorder's fees pursuant to Government Code Section 27383) NOTICE OF COMPLETION: National City 8`i' Street Utility Undergrounding and Sewer Replacement Project, FY 11-12, Specification No. 11-04 THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Additional recording fee applies) RECORDING REQUESTED BY WHEN RECORD;D MAIL. 1O: CITY OF NATIONAL CITY 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950-4301 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on February 14, 2013, of: Sth Street Utility Underrounding and Sewer Replacement Project, FY I 1-12, Specification No. 11-04 Work of improvement or portion of work of improvement under construction or alteration. East 8th Street National City, CA Street address City State 91950 Zip Code The undersigned owns the following interest or estate in said property: Owner -in -Fee Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with Basile Construction, Inc. Name of Original Contractor - The following work and material were supplied: Preparation of utility infrastructure, PVC piping, portland cement concrete, asphalt concrete. Labor groups include laborers, operators, and pipe installers. General statement of kind of labor, services, equipment or materials The names and addresses of co -ow ers are: N/A Joint tenants, tenants in common, or oth rs Dated: February 14, 2013 R orrison, Mayor City of ational City, 1243 National City Blvd., National City, CA 91950-4301 I, the undersigned, say: I have read the foregoing Notice of Completion, and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on February 14, 2013, at National City, California. Signatur ON MORRISON, MAYOR NDC I1-OA RESOLUTION NO. 2013 — 73 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING THE WORK PERFORMED BY BASILE CONSTRUCTION FOR THE TOTAL FINAL CONTRACT AMOUNT OF $2,599,924.99, RATIFYING THE NOTICE OF COMPLETION FILED WITH THE COUNTY RECORDER ON MARCH 4, 2013, AND AUTHORIZING THE RELEASE OF THE RETENTION IN THE AMOUNT OF $129,424.57 FOR THE 8TH STREET UNDERGROUNDING AND SEWER REPLACEMENT PROJECT BE IT RESOLVED by the City Council of the City of National City as follows: It appearing to the satisfaction of the Engineering Department that all work required to be done by Quality Mechanical for the total final contract amount of $2,599,924.99 for the 8th Street Undergrounding and Sewer Replacement Project has been completed, the City Council of National City hereby accepts said work, ratifies the Notice of Completion filed with the County Recorder on March 4, 2013, and orders that payment for said work be made in accordance with said Contract, including release of the retention in the amount of $129,424.57. PASSED and ADOPTED this 4th day of June, 2 ATTEST: /r .V h el R. Della, , ity Clerk OVED AS TO FORM: G-4 a Silva City Attor on Morrison, Mayor Passed and adopted by the Council of the City of National City, California, on June 4, 2013 by the following vote, to -wit: Ayes: Councilmembers Cano, Morrison, Natividad, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California h �I City Jerk of the City National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2013-73 of the City of National City, California, passed and adopted by the Council of said City on June 4, 2013. City Clerk of the City of National City, California By: Deputy CITY OF NATIONAL CITY, CALIFORNIA COUNCIL AGENDA STATEMENT PREPARED BY: PHONE: EXPLANATION: See attached MEETING DATE: June 4, 2013 AGENDA ITEM NO. 3 ITEM TITLE: A Resolution of the City Council of National City accepting the work of Basile Construction, approving the final contract amount of $2,599,924.99, authorizing the release of retention and ratify the filing of a Notice of Completion for thee Street Utility Undergrounding and Sewer Replacement Project, Specification No. 11-04. Funded by General Fund (reimbursed by the 20A Utility Conversion Fund), and Sewer Fund. Barby Tipton FINANCIAL STATEMENT: ACCOUNT NO. DEPARTMENT: Engineering APPROVED BY: APPROVED: 7/7 APPROVED: Retention is encumbered on Purchase Order 75864 and will be release upon Council approval. ENVIRONMENTAL REVIEW: N/A ORDINANCE: INTRODUCTION: FINAL ADOPTION: Finance MIS STAFF RECOMMENDATION: Adopt Resolution BOARD / COMMISSION RECOMMENDATION: N/A 1TTACHMENTS: 1. Explanation 2. Notice of Completion 3. Final Contract Balance Sheet 4 Resolution h,. On March 6, 2012, six bids were received and opened for the 8th Street Undergrounding and Sewer Replacement Project, Specification No. 11-04. The lowest responsive bidder was Basile Construction, Inc., with a proposed bid amount of $2,386,365.49. Staff checked the provided references and found that Basile Construction, Inc. was qualified to perform the work as detail in the specification. The City Council adopted Resolution No. 2012-67 awarding the contract to Basile Construction, Inc. on March 20, 2012. The Notice to Proceed with construction was issued for April 23, 2012. The Notice of Completion was issued on February 14, 2013, and filed with the San Diego County Recorder's Office on March 4, 2013. The 30 change orders issued for this project are detailed in the Final Contract Balance Report (attached). The 30 change orders increased the contract by $305,309.56 and line item changes decreased the contract by $91,750.06, for a net increase of $213,559.50 to the contract. This results in a nine percent contract increase for a final contract balance of $2,599,924.99. Staff recommends that Council approve the final contract amount, authorize the release of retention in the amount of $129,424.57 and ratify the filing of the Notice of Completion. PLEASE CUMYLE'1E THIS INFORMATION RECORDING REQUESTED BY: CITY ENGINEER CITY OF NATIONAL CITY 1243 National City Blvd. National City, CA 91950 AND WHEN RECORDED MAIL TO: CITY CLERK OF NATIONAL CITY 1243 National City Blvd. National City, CA 91950 pC oocu 2013-0138610 IVllllltllll IIIII Vql Iltll Ilnlllll INI Ilfl I�IIIIIIII IIII MAR oe, 2018 11:28 AM OFFICIAL RECORDS SAN DIEGO COUNTY RECORDER'S OFFICE Ernest J. Dronenburg. Jr., COUNTY RECORDER FEES: 0.,00 PAGES: 2 I IIIIII (INI IIII III (IIII IIIII IIII IIIII IIIII IIIII IIIII Till IIIII II11III• llI THIS SPACE FOR RECORDER S USE ONLY (Note: This document is recorded on behalf of the City of National City, a municipal corporation, and is exempt from Recorder's fees pursuant to Government Code Section 27383) NOTICE OF COMPLETION: National City 8th Street Utility Undergrounding and Sewer Replacement Project, FY 11-12, Specification No. 11-04 THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Additional recording fee applies) -1- RECORDING REQUESTED BY WHEN RECORDgD MAIL TO: CITY OF NATIONAL CITY 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950-4301 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on February 14, 2013, of: 8th Street Utility Undergrounding and Sewer Replacement Project,_FY 11-12, Specification No. 11-04 Work of improvement or portion of work of improvement under construction or alteration. East 8th Street National City, CA Street address City State 91950 Zip Code The undersigned owns the following interest or estate in said property: Owner -in -Fee Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with Basile Construction, Inc. Name of Original Contractor The following work and material were supplied: Preparation of utility infrastructure, PVC piping, portland cement concrete, asphalt concrete. Labor groups include laborers, operators, and pipe installers. General statement of kind of labor, services, equipment or materials The names and addresses of co-o .ers are: N/A. Joint tenants, tenants in common, or oth rs Dated: February 14, 2013 R iTorrison, Mayor City o 1ational City, 1243 National City Blvd., National City, CA 91950-4301 I, the undersigned, say: I have read the foregoing Notice of Completion, and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on February 14, 2013, at National City, California. Signatur ON MORRISON, MAYOR NOC I1-04 -2- FINAL CONTRACT BALANCE RETENTION REDUCTION DATE: May 13, 2013 PROJECT: TO: 8`1, Street Undergrounding and Sewer Replacement, Specification No. 11-04 Basile Construction, Inc 7952 Armour Street San Diego, CA 92111 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION: $2,386,365.49 May 7, 2012 January 28, 2013 (includes downtime due to multiple change orders, correctional work, clean-up, inspection, and document delays) 180 working days 0 working days 180 working days This Final Contract Balance reports final line item amounts and summarizes all changes to produce a final contract amount. Please see Attachment "A" to this Final Contract Balance. CHANGE ORDERS AND LINE ITEM ADJUSTMENTS: Change Order #1 provided for the removal of line items for Media 3 utility company as they were removed from the utility undergrounding project. This Change Order removed Media 3 Line Items from the original contract. This is a zero sum change order the decrease for which is reflected in line items 41(S)-44(S) below. Change Order #2 provided for the undergrounding of Access Cable utilities by furnishing and installing 2" CATV conduit in a trench under D Avenue from the south side of the 8th Street to the north side of 8th Street which was not included in the original plans. This Change Order increased the total contract amount by $2,304.28. Change Order #3 provided for the installation additional joint trench due to an existing abandoned asbestos cement waterline pipe (ACP) that was not shown on the original plans. This Change Order increased the total contract amount by $5,652.03. -3- FINAL CONTRACT BALANCE 8`h Street Undergrounding and Sewer Replacement Specification No. 11-04 Change Order #4 provided for hand excavations not calculated in the Contractor's bid price due to unmarked abandoned utility conduits not shown as existing on the original plans. This Change Order increased the total contract amount by $398.07. Change Order #5 provided for the relocation of an angled sewer lateral to be installed perpendicular to the sewer main connection point in order to comply with the City's sewer lateral installation standard. This Change Order increased the total contract amount by $707.76. Change Order #6 provided for potholing at multiple locations to determine the location of sewer lateral that did not comply with the City's sewer lateral installation standard. This Change Order increased the total contract amount by $1,618.49. Change Order #7 provided for hand excavations not calculated in the Contractor's bid price due to an unmarked abandoned utility conduit that was not shown as existing on the original plans. This Change Order increased the total contract amount by $720.89. Change Order #8 provided for the installation of higher capacity Cable TV vaults at the request of COX Communications and COX agreed to fully compensate the City for the cost of this change order. The Change Order increased the total contract amount by $6,940.18. Change Order #9 provided for the removal and disposal of unsuitable subgrade and the importation of suitable subgrade. This Change Order increased the total contract amount by $1,803.74. Change Order #10 provided for the installation of underground utilities on the southeast corner of the Harbor View Condo Project on 8`h Avenue and D Street. This Change Order increased the total contract amount by $6,126.80. Change Order #11 provided for the removal of additional existing electrical conduit that was not shown as existing on the original plans. This Change Order increased the total contract amount by $2,817.69. Change Order #12 provided for a locking manhole cover required by City safety standards but not called for in the original contract. This Change Order increased the total contract amount by $247.83. Change Order #13 provided for additional soil excavation and placement of a larger shoring box to remove an encased 18" drop sewer main not shown as existing on the original plans. The Change Order increased the total contract amount by $3,308.78. Page 2 -4- FINAL CONTRACT BALANCE 8th Street Undergrounding and Sewer Replacement Specification No. 11-04 Change Order #14 provided for time and materials for breaking and removing of unmarked concrete encased drop sewer mains. This Change Order increased the total contract amount by $5,675.93. Change Order #15 provided for time and materials for the completion of the removal of unmarked concrete encased drop sewer mains. This Change Order increased the total contract amount by $3,437.17. Change Order #16 provided for the removal of additional oversaturated subgrade and the pumping out of additional fluid due to an unmarked old concrete sewer main. This Change Order increased the total contract amount by $5,381.95. Change Order #17 provided for the installation of a concrete plug in the unmarked existing sewer main. This Change Order increased the total contract by $746.10. Change Order #18 provided for the removal and disposal of an unmarked existing sewer main and unsuitable subgrade and replacement with 82 tons of suitable import material. This Change Order increased the total contract by $6,441.92. Change Order #19 provided for the adjustment of AT&T line item quantities to reflect actual quantities installed. This Change Order increased the total contract by $81,897.96. Change Order #20 provided for the adjustment of SDG&E line item quantities to reflect actual quantities installed. This Change Order increased the total contract by $136,281.27. Change Order #21 provided for the installation of three (3) additional lighting units in the lighted crosswalk at 8th Street and E Avenue to restore crosswalk to fully functioning condition. This Change Order increased the total contract by $13,649.55. Change Order #22 provided for the removal and reconnection of sewer laterals not shown as existing on the original plans. This Change Order increased the total contract by $2,943.03. Change Order #23 provided for the Contractor to locate an unknown "Y" connection at the private property line so a perpendicular lateral could be installed. This Change Order increased the total contract by $362.23. Change Order #24 provided for the removal and reconnection of a sewer lateral from the private property connection to the sewer main. This Change Order increased the total contract of $893.39. Page 3 -5- FINAL CONTRACT BALANCE 8th Street Undergrounding and Sewer Replacement Specification No. 11-04 Change Order #25 provided for the installation of the SS Straps, SS Anchor Bolts, and application of epoxy to maintain the sewer pipe installed inside manholes MH264, 60, & 60A to accommodate the elevation changes at these manholes. This Change Order increased the total contract by $3,346.46. Change Order #26 provided for the removal of five (5) 3312 handholes and the installation of one (1) 3311 handhole (single) and four (4) 3311 handholes (double). This Change Order increased the total contract by $2,467.50. Change Order #27 provided for the installation of 3' x 5' pull boxes at 2 locations instead of 2' x 3' pull boxes called for in the contract. This Change Order increased the total contract by $4,032.00. Change Order #28 provided for an additional move on to complete Change Order #10 due to a delay by SDG&E in setting a utility pole. This Change Order increased the total contract by $525.00. Change Order #29 provided for an adjustment in bond costs incurred by the Contractor due to additional work. This Change Order increased the total contract by $2,089.78. Change Order #30 provided for additional excavations and the installation of four sewer sleeves due to conflicts with proposed dry utilities. This Change Order increased the total contract by $2,491.78. Line Item #4, "Remove and replace sidewalk repairs", was decreased by 1,000 SF for a decrease in the total contract of $12, 310.00. Line Item #7, "Protection post installation per SDRSD", was increased by 7 EA for an increase in the total contract amount of $2,471.70. Line Item #36(S), "Trench for CATV only", was decreased by 224 LF for a decrease in the total contract amount of $13,901.44. Line Item #37(S), "Furnish and install CATV(1)-3" conduit", was decreased by 896 LF for a decrease in the total contract amount of $2,204.16. Line Item #38(S), "Furnish and install CATV(1)-2" conduit", was decreased by 1,566 LF for an increase in the total contract amount of $2,599.56. Line Item #41(S), "Furnish and install CATV(1)-3" conduit", was decreased by 60 LF for a decrease in the total contract amount of $147.60. Line Item #42(S), "Furnish and install CATV(1)-2" conduit", was decreased by 18,390 LF for a decrease in the total contract amount of $30,527.40. Page 4 -6- FINAL CONTRACT BALANCE 8th Street Undergrounding and Sewer Replacement Specification No. 11-04 Line Item #43(S), "Furnish and Install CATV SGL 17"x30"x12"", was decreased by 15 EA for a decrease in the total contract amount of $9,469.50. Line Item #44(S), "Furnish and Install CATV DBL 17"x30"x24", was decreased by 9 EA for a decrease in the total contract amount of $6,596.55. Line Item #48, "Replace 10" PVC Sewer Main (less than 6' depth)", was decreased by 92 LF for a decrease in the total contract amount of $12,731.88. Line Item #49, "Replace 8" PVC Sewer Main (6'-10' depth)", was decreased by 16 LF for a decrease in the total contract amount of 1,820.16. Line Item #50, "Replace 10" PVC Sewer Main (6-10' depth)", was increased by 65 LF for an increase in the total contract amount of $6,777.55. Line Item #52, "Replace 15" PVC Sewer Main (6-10' depth)", was decreased by 23 LF for a decrease in the total contract amount of $2,555.76. Line Item #53, "Replace 15" PVC Sewer Main (10-20' depth)", was increased by 5 LF for an increase in the total contract amount of $851.35. Line Item #54, "Replace 21" PVC Sewer Main (10-20' depth)", was decreased by 13 LF for a decrease in the total contract amount of $7,638.96. Line Item #55, "Install 6" PVC Sewer Laterals SDARSD SS-01", was increased by 47 LF for an increase in the total contract amount of $5,266.35. Line Item #57, "Install Sewer Manhole SDARSD SM-02 (6'-10' depth) with Manhole Cover M-3", was increased by 1 EA for an increase in the total contract amount of $9,162.29. Line Item #60, "Sewer Main Concrete Encasement, SDARSD SP-03", was increased by 20 LF for an increase in the total contract amount of $951.20. Line Item #61, "Remove and Replace Cross Gutter SDARSD G-12", was increased by 224 SF for an increase in the total contract amount of $299.52. Line Item #62, "Replace Survey Monument SDARSD M-10", was increased by 1 EA for an increase in the total contract amount of $1,248.00. Line Item #65, "Remove, Dispose & Replace Unsuitable Backfill Material", was increased by 916.37 for an increase in the total contract amount by $26,070.73. Line Item #66, "Remove and Replace Sidewalk, SDARSD G-7", was increased by 282 SF for an increase in the total contract amount of $2,089.62. Page 5 -7- FINAL CONTRACT BALANCE 8`h Street Undergrounding and Sewer Replacement Specification No. 11-04 Line Item #68, "Asphalt Rubber Hot Mix Overlay", was decreased by 55.52 TONs for a decrease in the total contract amount of $7,820.34. Line Item #69, "Asphalt Concrete Dig -outs and Replacement", was decreased by 174.74 TONs for a decrease in the total contract amount of $28,971.89. Line Item #70, "Remove, Disposal & Replace Unsuitable Sub -grade Material", was decreased by 100 TONs for a decrease in the total contract amount of $7,856.00. Line Item #72, "Remove & Replace 6"-8" Curb and Gutter, SDARSD G-2", was decreased by 19 LF for a decrease in the total contract amount of $823.08. Line Item #73, "Remove & Replace Drive Way, SDARSD G-14", was increased by 20 SF for an increase in the total contract amount of $273.60. Line Item #74, "Remove & Replace Cross Gutter, SDARSD G-12", was increased by 59 SF for an increase in the total contract amount of $807.12. Line Item #75, "Remove & Replace Pedestrian Ramps (all types as required)", was decreased by 2 EA for a decrease in the total contract amount of $5,244.00. CONTRACT ADJUSTMENT: As a result of the above change orders, the contract price is adjusted as follows: 1. The final contract price is adjusted to $2,599,924.99. 2. As a result of the satisfactory completion of said project, a retention amount of $129,424.57 is set for payment upon the City Council's authorization to release the retention. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for perfonning the work described above. Basile Construction, Inc. will not be entitled to damages or additional payment for delays as described in the 2010 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 6 -8- City of National City 8th Street Utility Undergrounding and Sewer Replacement Specification No. 11-04 Final Contract Balance, Attachment "A" May 13, 2013 Original Contract To Date Delta" No. Item Unit Quantity Unit Price Amount Quantity Amount GENERAL WORK FOR DRY UTILITY WORK 1 Mobilization/Demobilization LS 1 5,671.00 5,671.00 1.00 5,671.00 - 2 SWPPP Implementation LS 1 5,344.65 5,344.65 1.00 5,344.65 - 3 Traffic Control LS 1 12,759.75 12,759.75 1.00 12,759.75 - 4 Remove and Replace Sidewalk Repairs Outside of Construction Limits SF 1,000 12.31 12,310.00 - - (12,310.00) 5 Protection and Restoration of Private Improvements LS 1 16,756.20 16,756.20 1.00 16,756.20 - 6 Shoring and Bracing LS 1 4,815.00 4,815.00 1.00 4,815.00 - 7 Protection Post Installation per SDRSD WM-04 EA 20 353.10 7,062.00 27.00 9,533.70 2,471.70 8 Construction Staking LS 1 8,881.00 8,881.00 1.00 8,881.00 - 9 Replace Traffic Signal Loop EA 50 251.45 12,572.50 50.00 12,572.50 - 10 Replace Signing, Striping and Pavement Markings LS 1 9,737.00 9,737.00 1.00 9,737.00 - ELECTRIC UNDERGROUNDING (SDG&E) 11(S) Mainline Joint Trench LF 6,250 79.18 494,875.00 6,250.00 494,875.00 - 12(S) Private Property Service Trench LF 930 28.89 26,867.70 930.00 26,867.70 - 13(S) Furnish and Install Electric Conduit, 5" LF 1,280 4.92 6,297.60 1,280.00 6,297.60 14(S) Furnish and Install Electric Conduit, 4" LF 8,550 4.01 34,285.50 8,550.00 34,285.50 - 15(S) Furnish and Install Electric Conduit, 3" LF 5,420 2.73 14,796.60 5,420.00 14,796.60 - 16(S) Furnish and Install Electric Conduit, 2" LF 130 1.82 236.60 130.00 236.60 - 17(S) Furnish And Install Electric Handhole Equipment Enclosure 3312 HH EA 6 251.45 1,508.70 8.00 1,508.70 - 18(S) Furnish And Install Electric Handhole Equipment Enclosure 3313 HH with Traffic Cover EA 5 1,578.25 7,891.25 5.00 7,891.25 - 19(S) Furnish And Install Electric Handhole Equipment Enclosure 3313 HH with Parkway Cover EA 2 1,535.45 3,070.90 2.00 3,070.90 - 20(5) Furnish And Install Electric Handhole Equipment Enclosure 3314 HH with Parkway Cover EA 1 6,896.15 6,896.15 1.00 6,896.15 - 21(S) Furnish And Install Electric Handhole Equipment Enclosure 3315 HH with Parkway Cover EA 1 9,399.95 9,399.95 1.00 9,399.95 - 22(S) Furnish and Install Electric Transformer 3427 Concrete Pad EA 1 2,819.45 2,819.45 1.00 2,819.45 23(S) Furnish And Install Electric 3316 HH with Traffic Cover EA 3 11,984.00 35,952.00 3.00 35,952.00 - 24(S) Furnish and Install Electric Handhole Equipment Enclosure 3309.2 HH EA 14 770.40 10,785.60 14.00 10,785.60 - 25(S) Furnish And Install Electric 3316 HH with Parkway Cover EA 1 12,385.25 12,385.25 1.00 12,385.25 - 26(S) Furnish And Install Electric Transformer 3421 Concrete Pad EA 19 572.45 10,876.55 19.00 10,876.55 - 27(S) Adjust Handhole to Finished Grade EA 6 802.50 4,815.00 6.00 4,815.00 - 28(S) Concrete Encasement LF 6,950 9.10 63,245.00 6,950.00 63,245.00 - COMMUNICATIONS (ATS7) UNDERGROUNDING 29(S) Trench for Telco Only LF 775 62.06 48,096.50 775.00 48,096.50 - 30(S) Furnish and Install Telephone 2" Conduit LF 980 1.82 1,783.60 980.00 1,783.60 - 31(S) Furnish and Install Telephone 4" Conduit LF 5,220 3.42 17,852.40 5,220.00 17,852.40 - 32(S) Furnish and Install Telephone CMPH w/ Ground EA 2 920.20 1,840.40 2.00 1,840.40 33(S) Furnish and Install Telephone CPLM12 EA 4 624.88 2,499.52 4.00 2,499.52 - 34(S) Furnish and Install Telephone Pullbox 2' x 3' x EA 5 1,888.55 9,442.75 5.00 9,442.75 - 35(S) Furnish and Install Telephone Pullbox 3'x5'x4' (wl drag off cover) EA 1 3,086.95 3,086.95 1.00 3,086.95 - COMUNICAT/ONS (COX) UNDERGROUNDING 36(S) Trench for CAN Only LF 500 62.06 31,030.00 276.00 17,128.56 (13,901.44) 37(S) Furnish and Install CATV (1)-3" Conduit LF 980 2.46 2,410.80 84.00 206.64 (2,204.16) -9- 38(S) Furnish and Install CATV (1)-2" Conduit LF 20,650 1.66 34,279.00 22,216.00 36,878.56 2,599.56 39(S) Furnish and Install CATV SGL 17"x30"x12" EA 15 631.30 9,469.50 15.00 9,469.50 - 40(S) Furnish and Install CATV DBL 17"x30"x24" EA 9 732.95 6,596.55 9.00 6,596,55 - COMMUNICATIONS (MEDIA 3) UNDERGROUNDING 41(S) L.F 60 2-.16 17660 (147.60) 42(S) Furnish and Install CATV (1)- 2" Conduit LF 18,750 1.66 31,125.00 360.00 597.60 (30,527.40) 43(S) Furaid%a 46 631.30 9,460.50 44(S) Furnich and Inctall CATV DBL 17"x30"x21" EA 9 732.06 6,696.56 (9,469.50) GENERAL WORK FOR STREET IMPROVEMENTS BETWEEN HIGHLAND AVENUE & K ST AND ALL SEWER WORK (6,596.55) 45 Mobilization/Demobilization LS 1 104,615.89 104,615.89 1.00 104,615.89 - 46 Traffic Control LS 1 14,945.25 14,945.25 1.00 14,945.25 - SEWER REPLACEMENT 47 Shoring and Bracing LS 1 16,370.07 16,370.07 1.00 16,370.07 - 48 Replace 10" PVC Sewer Main (less than 6' depth) LF 202 138.39 27,954.78 110.00 15,222.90 (12,731.88) 49 Replace 8" PVC Sewer Main (6'-10' depth) LF 995 113.76 113,191.20 979.00 111,371.04 (1,820.16) 50 Replace 10" PVC Sewer Main (6-10' depth) LF 1,193 104.27 124,394.11 1,258.00 131,171.66 6,777.55 51 Replace 15" PVC Sewer Main (less than 6' depth) LF 330 140.13 46,242.90 330.00 46,242.90 - 52 Replace 15" PVC Sewer Main (6-10' depth) LF 464 111.12 51,559.68 441.00 49,003.92 (2,555.76) 53 Replace 15" PVC Sewer Main (10-20' depth) LF 240 170.27 40,864.80 245.00 41,716.15 851.35 54 Replace 21" PVC Sewer Main (10-20' depth) LF 67 545.64 36,557.88 53.00 28,918.92 (7,638.96) 55 Install 6" PVC Sewer Laterals SDARSD SS-01 LF 1,750 112.05 196,087.50 1,797.00 201,353.85 5,266.35 56 Install Sewer Manhole SDARSD SM-02 (less than 6' depth) EA 3 9,377.56 28,132,68 3.00 28,132.68 - 57 Install Sewer Manhole SDARSD SM-02 (6'-10' depth) with Manhole Cover M-3 EA 9 9,162.29 82,460.61 10.00 91,622.90 9,162.29 58 Install Sewer Manhole SDARSD SM-02 (greater than 10' depth) with Manhole Cover M- 3 EA 3 12,381.19 37,143.57 3.00 37,143.57 - 59 Install 6" PVC Sewer Lateral Cleanouts SDARSD SC-01 Type B with PVC cap and Connection to Existing Sewer Lateral EA 43 574.80 24,716.40 43.00 24,716.40 - 60 Sewer Main Concrete Encasement, SDARSD SP-03 LF 60 47.56 2,853.60 80.00 3,804.80 951.20 61 Remove and Replace Cross Gutter SDARSD G-12 SF 200 12.48 2,496.00 224.00 2,795.52 299.52 62 Replace Survey Monument SDARSD M-10 EA 5 1,248.00 6,240.00 6.00 7,488.00 1,248.00 63 Replace Traffic Loop EA 40 312.00 12,480.00 - 40.00 12,480.00 - 64 Remove, Salvage and Replace In -Pavement In Roadway Lighted Crosswalk at 8th & E Street LS 1 15,080.00 15,080.00 1.00 15,080.00 - 65 Remove, Dispose & Replace Unsuitable Backfill Materiel TON 500 28.45 14,225.00 1,416.37 40,295.73 26,070.73 STREET IMPROVEMENTS HIGHLAND AVENUE TO K STREET 66 Remove and Replace Sidewalk, SDARSD G-7 SF 725 7.41 5,372.25 1,007.00 7,461.87 2,089.62 67 Asphalt Concrete Cold Milling SF 9,500 0.48 4,560.00 9,500.00 4,560.00 - 68 Asphalt Rubber Hot Mix Overlay TON 800 171.80 137,440.00 754.48 129,619.66 (7,820.34) (28,971.89) 69 Asphalt Concrete Dig -outs and Replacement TON 750 165.80 124,350.00 575.26 95,378.11 70 Remove, Disposal & Replace Unsuitable Sub- grade Materlal TON 100 78.56 7,856.00 - - (7,856.00 ) 71 Asphalt Roadway Crack Filling SY 6,240 0.89 5,553.60 6,240.00 5,553.60 - 72 Remove & Replace 6"-8" Curb and Gutter, SDARSD G-2 LF 60 43.32 2,599.20 41.00 1,776.12 (823.08) 73 Remove & Replace Drive Way, SDARSD G-14 SF 400 13.68 5,472.00 420.00 5,745.60 273.60 74 Remove & Replace Cross Gutter, SDARSD G- SF 200 13.68 2,736.00 259.00 3,543.12 807.12 75 Remove & Replace Pedestrian Ramps (all types as required) EA 10 2,622.00 26,220.00 8.00 20,976.00 (5,244.00) 76 Replace Traffic Loop EA 10 342.00 3,420.00 10.00 3,420.00 - 77 Traffic Striping and Marking LS 1 3,534.00 3,534.00 1.00 3,534.00 - TOTAL ORIGINAL CONTRACT AMOUNT: 2,386,365.49 -10- CHANGE ORDERS 1 Remove Media 3 from Project' LS 1 (46,691.25) (46,691.25) - - 46,691.25 2 Furnish and Install 2" CATV Conduit (Access Cable) LS 1 2,304.28 2,304.28 1.00 2,304.28 - 3 Backfill existing and install additional trench due to location of ACP pipe LS 1 5,652.03 5,652.03 1.00 5,652.03 - 4 T&M - Unmarked Utilites at Highland LS 1 398.07 398.07 1.00 398.07 - 5 T&M - Angled Lateral LS 1 707.76 707.76 1.00 707.76 - 6 T&M - Edgarton Potholing LS 1 1,618.49 1,618.49 1.00 1,618.49 - 7 T&M - Handdig and mini ex excavation LS 1 720.89 720.89 1.00 720.89 - 8 Install higher capacity Cox Cable vaults LS 1 6,940.18 6,940.18 1.00 6,940.18 - 9 Place Unsuitable sub -grade in alley LS 1 1,803.74 1,803.74 1.00 1,803.74 - 10 Harbor View undergrounding LS 1 6,126.80 6,126.80 1.00 6,126.80 - 11 Remove and dispose of electric conduit . LS 1 2,817.69 2,817.69 1.00 2,817.69 - 12 Install locking manhole cover LS 1 247.83 247.83 1.00 247.83 - 13 Remove and dispose of Drop Main (7/25) LS 1 3,308.78 3,308.78 1.00 3,308.78 - 14 Remove and dispose of Drop Main (7/26) LS 1 5,675.93 5,675.93 1.00 5,675.93 - 15 Remove and dispose of Drop Main (7/27) LS 1 3,437.17 3,437.17 1.00 3,437.17 16 Remove concrete encases sewer main LS 1 5,381.95 5,381.95 1.00 5,381.95 - 17 Concrete plug and fill LS 1 746.10 746.10 1.00 746.10 18 Remove unsuitable material and place suitable material LS 1 6,441.92 6,441.92 1.00 6,441.92 - 19 AT&T Line Item Certification LS 1 81,897.96 81,897.96 1.00 81,897.96 - 20 SDG&E Line Item Certification LS 1 136,281.27 136,281.27 1.00 136,281.27 - 21 In -pavement Lights LS 1 13,649.55 13,649.55 1.00 13,649.55 - 22 West End Lateral LS 1 2,943.03 2,943.03 1.00 2,943.03 - 23 "Y" at Edgarton LS 1 362.23 362.23 1.00 362.23 - 24 Unknown Lateral at MH &1 LS 1 893.39 893.39 1.00 893.39 - 25 Manhole Straps, Anchors LS 1 3,346.46 3,346.46 1.00 3,346.46 - 26 SDG&E Hand Holes LS 1 2,467.50 2,467.50 1.00 2,467.50 - 27 AT&T Pull Boxes LS 1 4,032.00 4,032.00 1.00 4,032.00 - 28 Re -Mobilization for Change Order No. 10 LS 1 525.00 525.00 1.00 525.00 - 29 Bond Change Order LS 1 2,089.78 2,089.78 1.00 2,089.78 - 30 Installation of Sewer Sleeves LS 1 2,491.78 2,491.78 1.00 2,491.78 - * COt Is not reflected In "To Date" amount because It Is already reflected "To Date' In Line Items 41-44. It CO1 were drawn across it would be reflected twice: once in Line Items 41-44 and again In C01. TOTAL CONTRACT AMOUNT INCLUDING CHANGE ORDERS: 2,644,983.80 TOTAL AMOUNT EARNED: 2,599,924.99 (45,058.81) -71- RESOLUTION NO. 2013 — RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING THE WORK PERFORMED BY BASILE CONSTRUCTION FOR THE TOTAL FINAL CONTRACT AMOUNT OF $2,599,924.99, RATIFYING THE NOTICE OF COMPLETION FILED WITH THE COUNTY RECORDER ON MARCH 4, 2013, AND AUTHORIZING THE RELEASE OF THE RETENTION IN THE AMOUNT OF $129,424.57 FOR THE 8TH STREET UNDERGROUNDING AND SEWER REPLACEMENT PROJECT BE IT RESOLVED by the City Council of the City of National City as follows: It appearing to the satisfaction of the Engineering Department that all work required to be done by Quality Mechanical for the total final contract amount of $2,599,924.99 for the 8th Street Undergrounding and Sewer Replacement Project has been completed, the City Council of National City hereby accepts said work, ratifies the Notice of Completion filed with the County Recorder on March 4, 2013, and orders that payment for said work be made in accordance with said Contract, including release of the retention in the amount of $129,424.57. PASSED and ADOPTED this 4th day of June, 2013. Ron Morrison, Mayor ATTEST: Michael R. Dalla, City Clerk APPROVED AS TO FORM: Claudia Gacitua Silva City Attorney