HomeMy WebLinkAbout2013 CON Koch Armstrong - Pedestrian Crossing Project Sp 12-12 - Change Orders #12, #13, #14, #15, #16NATIQ1' CI Citywide Pedestrian Crossings Specification No. 12-12 Contractor: Koch -Armstrong COSponAT CHANGE ORDER NO. 12 June 24, 2013 Reason/Purpose for this Change Order: City reviewed the designed irrigation system at 14th and National City Blvd. and decided to have the contractor match the existing irrigation system in lieu of installing per plans. This would make future maintenance of the system more practical for city crews. The continuity between the two systems would also allow managing the irrigation water cycles more efficient. The City of National City and Contractor agree to the following change to the original Contract: The contractor design built an irrigation system to math the existing system adding an additional irrigation valve and conventional spray heads. Original Contract Amount $ 813,949.15 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 821,987.16 Working days added: 0 9,138.01 823,087.16 (1,100.00) Working days subtracted: 0 Percent change in Contract to date 0.99% Su mi ed by: ro ct Man r / Date yy r r Date App'oved by: ✓ 2 City ngineer 6/27/3 Date City Manager, required for change orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by Contractor's name): Name: C.° 3 Date Note to contractor: it you ao not agree wan mis cnange uraer you may oe airectea to proceea wim mis worK unaer me terms or the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 +- CAI/FONN►A NATIO'' CI N so Citywide Pedestrian Crossings Specification No. 12-12 Contractor: Koch -Armstrong CHANGE ORDER NO. 13 June 24, 2013 Reason/Purpose for this Change Order: The contractor had to remove existing vegetation not originally identified on the plans, excavate and install additional mainline and backfill and repair as directed. The City of National City and Contractor agree to the following change to the original Contract: Have the contractor remove existing vegetation, excavate for mainline not originally identified on the plans, install additional mainline, backfill and repair landscape as directed. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 826,342.29 Working days added: 4 $ 813,949.15 8,038.01 821,987.16 4,355.13 Working days subtracted:0 Percent change in Contract to date 1.52% Submitted by: Date • ec .. Date Project Manager 4. e ovvedd by: Cit ngineer d 7 7 Date //3_ City Manager, required for Change Orders ,$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by Contractor's name): 4.4/(f Name: Date Note to contractor: it you ao not agree wren this t,nange uraer you may oe airectea to proceea witn tilts work under tne terms or tne contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 «— CAUFORW$A -+ NATIONALCI W v U coero u.i D Citywide Pedestrian Crossings Specification No. 12-12 Contractor: Koch -Armstrong CHANGE ORDER NO. 14 June 24, 2013 Reason/Purpose for this Change Order: Contractor to procured additional signs as requested by city. The City of National City and Contractor agree to the following change to the original Contract: Provide 26 "Push to Activate Crossing Warning" pedestrian push button signs to match existing signs @ Highland and 28th for pedestrian safety. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 829,685.29 Working days added: 5 $ 813,949.15 12,393.14 826, 342.29 3,343.00 Working days subtracted: 0 Percent change in Contract to date 1.93% Sub .'tied by: gitp-z(er_1-7) -ct Manager Date City Project Manager Date ' pproved by: i/2-7/1i City and r, r red ch _-?-1 Orders>$24,999 Date Cit ngineer Date By signing this Change Order the Contractor confirms that he/she is completely familiar witWits terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor ) Accepted and agreed to by (Contractor's name): Name: 6-- -- �3 Date Note to contractor: It you oo not agree witn tms t,nange uraer you may oe airectea to proceea wan this work unaer the terms or the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 »- CAUFORNIA -• snoNAL ciry Citywide Pedestrian Crossings Specification No. 12-12 Contractor: Koch -Armstrong CHANGE ORDER NO. 15 June 24, 2013 Reason/Purpose for this Change Order: Due to an existing power pole located at the second proposed median crossing on 8th St. the 1 B pole had to be relocated requiring the installation of a separate pedestrian push button to comply with ADA specification located within four feet of the ADA ramp. The City of National City and Contractor agree to the following change to the original Contract: Contractor was requested to saw cut the existing sidewalk, remove and place a pedestrian push button footing and pole, saw cut existing roadway and install communication between the 1B pole and the new pedestrian push button. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 831,283.92 Working days added: 2 $ 813,949.15 15, 736.14 829,685.29 1,598.63 Working days subtracted: 0 Percent change in Contract to date 2.13% Sub itted by: • ct Manager 6— Date 5 °� / r_-2:- / 3 Cif e r Date Approved by: Cit ngineer� �j/ Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents al costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by (Contractor's name): -q4 0,16 Name: 6-2-G-- (3 Date N ote to ontractor: It you do not agree witn tms unange uraer you may oe airectea to proceed wan tnis work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 AUUtFORNIA -. NATIO CITY AZV INCOnielyektela Citywide Pedestrian Crossings Specification No. 12-12 Contractor: Koch -Armstrong CHANGE ORDER NO. 16 June 24, 2013 Reason/Purpose for this Change Order: Contractor to procure 12 additional Type "Q" markers as requested by city. The City of National City and Contractor agree to the following change to the original Contract: Contractor to purchase and install 12 Type "Q" marker at various median locations identified by city. Original Contract Amount $ 813,949.15 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 17, 334.77 831,283.92 778.28 $ 832,062.20 Percent change in Contract to date 2.23% Subm" e by: r ect anager Date City r jec ;Ma a Date A proved by: City ngineer Date City Manager, required for Change Orders >$24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by (Contractor's name): Name: Date Note to contractor: It you ao not agree witn tnis t,nange oraer you may oe airectea to proceea witn trim work unaer tne terms of tne contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk KOCH ARMSTRONG GENERAL ENGINEERING Change Orders #12, #13, #14, #15, #16 Pedestrian Crossing Projects July Hernandez (Engineering) Forwarded Copies of Change Orders to Koch Armstrong General Engineering