CHANGE ORDER NO. 12
June 24, 2013
Reason/Purpose for this Change Order:
City reviewed the designed irrigation system at 14th and National City Blvd. and decided to have the
contractor match the existing irrigation system in lieu of installing per plans. This would make future
maintenance of the system more practical for city crews. The continuity between the two systems would also
allow managing the irrigation water cycles more efficient.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor design built an irrigation system to math the existing system adding an additional irrigation
valve and conventional spray heads.
Original Contract Amount $ 813,949.15
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 821,987.16
Working days added: 0
9,138.01
823,087.16
(1,100.00)
Working days subtracted: 0
Percent change in Contract to date 0.99%
Su mi ed by:
ro ct
Man
r
/
Date
yy r r
Date
App'oved by:
✓ 2
City ngineer
6/27/3
Date
City Manager, required for change orders >$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by Contractor's name):
Name:
C.° 3
Date
Note to contractor: it you ao not agree wan mis cnange uraer you may oe airectea to proceea wim mis worK unaer me terms or the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
+- CAI/FONN►A
NATIO'' CI
N so
Citywide Pedestrian Crossings
Specification No. 12-12
Contractor: Koch -Armstrong
CHANGE ORDER NO. 13
June 24, 2013
Reason/Purpose for this Change Order:
The contractor had to remove existing vegetation not originally identified on the plans, excavate and install
additional mainline and backfill and repair as directed.
The City of National City and Contractor agree to the following change to the original Contract:
Have the contractor remove existing vegetation, excavate for mainline not originally identified on the plans,
install additional mainline, backfill and repair landscape as directed.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 826,342.29
Working days added: 4
$ 813,949.15
8,038.01
821,987.16
4,355.13
Working days subtracted:0
Percent change in Contract to date 1.52%
Submitted by:
Date
• ec ..
Date
Project Manager
4. e ovvedd by:
Cit ngineer
d 7 7
Date
//3_
City Manager, required for Change Orders ,$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by Contractor's name):
4.4/(f
Name:
Date
Note to contractor: it you ao not agree wren this t,nange uraer you may oe airectea to proceea witn tilts work under tne terms or tne
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
«— CAUFORW$A -+
NATIONALCI
W v
U coero u.i D
Citywide Pedestrian Crossings
Specification No. 12-12
Contractor: Koch -Armstrong
CHANGE ORDER NO. 14
June 24, 2013
Reason/Purpose for this Change Order:
Contractor to procured additional signs as requested by city.
The City of National City and Contractor agree to the following change to the original Contract:
Provide 26 "Push to Activate Crossing Warning" pedestrian push button signs to match existing signs @
Highland and 28th for pedestrian safety.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 829,685.29
Working days added: 5
$ 813,949.15
12,393.14
826, 342.29
3,343.00
Working days subtracted: 0
Percent change in Contract to date 1.93%
Sub .'tied by:
gitp-z(er_1-7)
-ct Manager
Date
City Project Manager
Date
' pproved by:
i/2-7/1i
City and r, r red ch
_-?-1
Orders>$24,999 Date
Cit ngineer
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar witWits terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor )
Accepted and agreed to by (Contractor's name):
Name:
6-- -- �3
Date
Note to contractor: It you oo not agree witn tms t,nange uraer you may oe airectea to proceea wan this work unaer the terms or the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
»- CAUFORNIA -•
snoNAL ciry
Citywide Pedestrian Crossings
Specification No. 12-12
Contractor: Koch -Armstrong
CHANGE ORDER NO. 15
June 24, 2013
Reason/Purpose for this Change Order:
Due to an existing power pole located at the second proposed median crossing on 8th St. the 1 B pole had to
be relocated requiring the installation of a separate pedestrian push button to comply with ADA specification
located within four feet of the ADA ramp.
The City of National City and Contractor agree to the following change to the original Contract:
Contractor was requested to saw cut the existing sidewalk, remove and place a pedestrian push button
footing and pole, saw cut existing roadway and install communication between the 1B pole and the new
pedestrian push button.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 831,283.92
Working days added: 2
$ 813,949.15
15, 736.14
829,685.29
1,598.63
Working days subtracted: 0
Percent change in Contract to date 2.13%
Sub itted by:
• ct Manager
6—
Date
5
°� / r_-2:- / 3
Cif e r Date
Approved by:
Cit ngineer�
�j/
Date
City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents al costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by (Contractor's name):
-q4 0,16
Name:
6-2-G-- (3
Date
N
ote to ontractor: It you do not agree witn tms unange uraer you may oe airectea to proceed wan tnis work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
AUUtFORNIA -.
NATIO CITY
AZV
INCOnielyektela
Citywide Pedestrian Crossings
Specification No. 12-12
Contractor: Koch -Armstrong
CHANGE ORDER NO. 16
June 24, 2013
Reason/Purpose for this Change Order:
Contractor to procure 12 additional Type "Q" markers as requested by city.
The City of National City and Contractor agree to the following change to the original Contract:
Contractor to purchase and install 12 Type "Q" marker at various median locations identified by city.
Original Contract Amount $ 813,949.15
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
Working days subtracted: 0
17, 334.77
831,283.92
778.28
$ 832,062.20
Percent change in Contract to date 2.23%
Subm" e by:
r ect anager
Date
City r jec ;Ma a
Date
A proved by:
City ngineer
Date
City Manager, required for Change Orders >$24.999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by (Contractor's name):
Name:
Date
Note to contractor: It you ao not agree witn tnis t,nange oraer you may oe airectea to proceea witn trim work unaer tne terms of tne
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
KOCH ARMSTRONG GENERAL ENGINEERING
Change Orders #12, #13, #14, #15, #16
Pedestrian Crossing Projects
July Hernandez (Engineering) Forwarded Copies of
Change Orders to Koch Armstrong General Engineering