8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 30
Specification No. 11-04 May 6, 2013
Contractor: Basile Construction, Inc.
s Reason/Purpose for this Change Order:
Upon installation of dry utilities, the contractor encountered a conflict between proposed dry utilities and storm
drain systems. This requied the Contractor to conduct additional excavations and to install four sewer sleeves at
;stations 31+48, 29+95, 30+36, and 44+19.
The City of National City and Contractor agree to the following change to the original Contract:
The cost for all labor, equipment, and materials for this change order are found on Attachment "A", which is
!attached hereto and incorporated herein. The Contractor and City agree that all costs for any additional labor,
lequipment, materials, or other costs is included in the price of this Change Order.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $ 2,644,983.80
Working days added: 0
$ 2,386,365.49
256,126.53
2,642,492.02
2,491.78
[SubnK
Project
Approt ed by:
Date CI
Working days subtracted: 0
Percent change in Contract to date 10.84%
V / Ci.) 1.3. '�G :..
tect Manalger
Date
Engineer/ Date City Manager,required for Change Oe dam 424,999 Date
By signing This Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are inco ted erein.
Accefed an - agreed to by Basile Construction, Inc.:
.N
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
...CALIFORNIA
NATIONAL
Or
ataii
IMnnee..s.etfl�
8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 30, Attachment "A"
Specification #11-04
DATE: May 6, 2013
WORK PERFORMED BY: AM ORTEGA
DESCRIPTION OF WORK: Excavation and Installation of Sewer Sleeves
DAILY ACCOUNTING FOR TIME, EQUIPMENT AND MATERIALS
LABOR
Unit
Qty
Wage
Total
1
Foreman
Hour
5.50
62.03
341.17
2
Laborer
Hour
5.50
45.38
249.59
3
Operator
Hour
3.50
60.74
212.59
3
-
4
-
Sub -Total Labor:
Labor Burden (23.5%):
Labor Markup (20%):
TOTAL LABOR:
$ 803.35
$ 188.79
$ 198.43
$ 1,190.57
EQUIPMENT
Unit
Qty
Rate
Total
1
Backhoe
Hour
3.50
33.58
117.53
2
Air Compressor
Hour
5.50
10.70
58.85
3
Crew Truck
Hour
5.50
16.40
90.20
4
5
-
Sub -Tots Materials:
Equipment Markup (15%):
TOTAL MATERIALS:
$ 266.58
$ 39.99
$ 306.57
MATERIALS
Unit
Qty
Rate
Total
1
Steel Plates
EA
6.00
52.50
315.00
2
1 Sack Slurry
CY
3.00
75.00
225.00
3
12" PVC Pipe
LF
15.00
21.66
324.90
4
-
-
Sub -Tote Materials:
Materials Markup (15%):
TOTAL MATERIALS:
$ 864.90
$ 129.74
$ 994.64
Total Labor: $ 1,190.57
Total Materials: $ 306.57
Total Equipment: $ 994.64
TOTAL: $ 2,491.78
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
BASILE CONSTRUCTION
Change Order #30
8th Street Utility Undergrounding
Judy Hernandez (Engineering) Forwarded Copy
of Change Order to Basile Construction