HomeMy WebLinkAbout2013 CON Basile Construction - 8th St Utility Undergrounding - Change Order #30e- CALIFORNIA .�. NATIONAL CITy �Icoc " 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 30 Specification No. 11-04 May 6, 2013 Contractor: Basile Construction, Inc. s Reason/Purpose for this Change Order: Upon installation of dry utilities, the contractor encountered a conflict between proposed dry utilities and storm drain systems. This requied the Contractor to conduct additional excavations and to install four sewer sleeves at ;stations 31+48, 29+95, 30+36, and 44+19. The City of National City and Contractor agree to the following change to the original Contract: The cost for all labor, equipment, and materials for this change order are found on Attachment "A", which is !attached hereto and incorporated herein. The Contractor and City agree that all costs for any additional labor, lequipment, materials, or other costs is included in the price of this Change Order. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 2,644,983.80 Working days added: 0 $ 2,386,365.49 256,126.53 2,642,492.02 2,491.78 [SubnK Project Approt ed by: Date CI Working days subtracted: 0 Percent change in Contract to date 10.84% V / Ci.) 1.3. '�G :.. tect Manalger Date Engineer/ Date City Manager,required for Change Oe dam 424,999 Date By signing This Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are inco ted erein. Accefed an - agreed to by Basile Construction, Inc.: .N Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 ...CALIFORNIA NATIONAL Or ataii IMnnee..s.etfl� 8TH STREET UTILITY UNDERGROUNDING AND SEWER REPLACEMENT CHANGE ORDER NO. 30, Attachment "A" Specification #11-04 DATE: May 6, 2013 WORK PERFORMED BY: AM ORTEGA DESCRIPTION OF WORK: Excavation and Installation of Sewer Sleeves DAILY ACCOUNTING FOR TIME, EQUIPMENT AND MATERIALS LABOR Unit Qty Wage Total 1 Foreman Hour 5.50 62.03 341.17 2 Laborer Hour 5.50 45.38 249.59 3 Operator Hour 3.50 60.74 212.59 3 - 4 - Sub -Total Labor: Labor Burden (23.5%): Labor Markup (20%): TOTAL LABOR: $ 803.35 $ 188.79 $ 198.43 $ 1,190.57 EQUIPMENT Unit Qty Rate Total 1 Backhoe Hour 3.50 33.58 117.53 2 Air Compressor Hour 5.50 10.70 58.85 3 Crew Truck Hour 5.50 16.40 90.20 4 5 - Sub -Tots Materials: Equipment Markup (15%): TOTAL MATERIALS: $ 266.58 $ 39.99 $ 306.57 MATERIALS Unit Qty Rate Total 1 Steel Plates EA 6.00 52.50 315.00 2 1 Sack Slurry CY 3.00 75.00 225.00 3 12" PVC Pipe LF 15.00 21.66 324.90 4 - - Sub -Tote Materials: Materials Markup (15%): TOTAL MATERIALS: $ 864.90 $ 129.74 $ 994.64 Total Labor: $ 1,190.57 Total Materials: $ 306.57 Total Equipment: $ 994.64 TOTAL: $ 2,491.78 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk BASILE CONSTRUCTION Change Order #30 8th Street Utility Undergrounding Judy Hernandez (Engineering) Forwarded Copy of Change Order to Basile Construction