HomeMy WebLinkAbout2013 CON Koch Armstrong - Street Resurfacing Project FY 12-13 - Change Order #11N NATIONAL CITY STREET RESURFACING AND CONCRETE IMPROVEMENTS Specification No. 12-06 Contractor: Koch -Armstrong General Engineering, Inc. Reason/Purpose for this Change Order: The asphalt at Alpha Street from Palm Avenue to Beta Street requires repair. As this work is of the same scope and character as the original contract, the Engineering Department requests that this work be completed as a change order addition to the Contract. CHANGE ORDER NO. 11 May 31, 2013 The City of National City and Contractor agree to the following change to the original Contract: The Contractor shall complete the line items outlined on Attachment "A", attached hereto and incorporated herein, at the location above. The lump sum change order price includes all labor, materials, equipment, and traffic control required to complete this work. The Contractor shall be compensated as a lump sum price based on the itemized spreadsheet on Attachment "A". Original Contract Amount $ 738,249.79 Net change by previously authorized Change Orders Subtotal Amount of this change order 42,095.27 780,345.06 49,959.80 New contract amount $ Working days added: 0 Submitted by: Aped •y: Cit En.ineer Working days subtracted: 0 t— 13, �& Date Date Percent change in Contract to date 12.47% Cit Mana 830,304.86 7..i �. Date er required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted old agreed to by Koch -Armstrong General Engineering,lnc.: /���_ Jt rub V-t,-13 Na') tU�AreKstralq, Vcefrest' Date Note t ontractor. If you do not agree with this C range Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 NATIONAL CITY STREET RESURFACING AND CONCRETE IMPROVEMENTS CHANGE ORDER NO. 11, Attachment "A" Specification No. 12-06 Itemized Breakdown Qty Unit Unit Cost Item Cost Item 1 Mobilization 1.00 LS 1,457.00 1,457.00 2 Remove RPMs and Existing Thermo -Plastic at 4 Speed Bumps 1.00 LS 704.00 704.00 3 Apply herbicide and remove vegetation 40,000.00 SF 0.02 800.00 4 4" Asphalt Concrete removals at dig -outs 500.00 SF 3.50 1,750.00 2,975.00 5 4" AC Paving at Dig -outs 500.00 SF 5.95 6 1.5" Asphalt Concrete cold mill 6,900.00 SF 0.43 2,967.00 7 1.5" AC Paving at cold mill areas 6,900.00 SF 1.26 8,694.00 8 0" - 1.5" AC cold mill (at Palm Spandrels allow for REAS thickness) 450.00 SF 1.29 580.50 9 0" - 1.5" AC paving at Cold Mill Areas (excludes spandrels at Palm) 190.00 SF 3.57 678.30 10 AC Patch at Speed Bump Striping Removals, additional 1" pave at 1 bump due to cracking and pave 4' wide complete removal at 1 bump 4.00 EA 382.00 1,528.00 11 Rubberized emulsion aggregate slurry -type 2 40,000.00 SF 0.53 21,200.00 12 Traffic Control 1.00 LS 4,800.00 4,800.00 13 Replace striping, including speed bumps and yellow and blue RPMs 1.00 LS 1,826.00 1,826.00 GRAND TOTAL: $ 49,959.80 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalia, CMC - City Clerk KOCH ARMSTRONG GENERAL ENGINEERING Change Order #11 Street Resurfacing & Concrete Improvements Lynn Cole (Engineering) Forwarded Copy of Change Order to Koch Armstrong General Engineering