HomeMy WebLinkAbout2013 CON PAL General Engineering - 8th Street Smart Growth Revitalization - Change Order #1CALIFORNIA �. ' INCO RYOAAi�9 8TH STREET SMART GROWTH REVITALIZATION Specification No. 12-13 Contractor: PAL General Engineering, Inc. Reason/Purpose for this Change Order. The contractor is requesting to move the phasing of the median and median light work on 8th from the beginning of the project to the end of the project in order to facilitate more traffic control options in an effort to enhance ;project efficiency. CHANGE ORDER NO. 1 August 19, 2013 The City of National City and Contractor agree to the following change to the original Contract: 'The Contractor and the City agree to move the phasing for the installation of the new streetlights and medians on ;8th from the beginning of the project to the end of the project. The Contractor agrees that he shall coordinate the'. Iremoval of the existing powerpoles with the Utility Companies after the installation and energizing of the new `streetlights; that any surface improvements that are blocked out temporarily to preserve the existing power pole and light shall be installed with the same concrete supplier and finish as the adjacent improvements such that ;there will be no indication that those improvements were installed at a later date; that there will be no additional days added to the contract for this change; that there will be no additonal costs to the City for this change; and 'that the Contractor shall maintain any blocked out areas in a safe manner that allows for pedestrian access at all 1 times. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount... Working days added: 0 Working days subtracted: 0 !Submitted by: City..Engineer 3,978,336.35 3, 978, 336.35 $ 3,978,336.35 Percent change in Contract to date 0.00% " Z7-i,3 ' Date ct Ma afar Date Date City Manager, required for Change Orders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engneering, Inc.: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 I ,.\I. (I CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk PAL GENERAL ENGINEERING 8th Street Smart Growth Revitalization Change Order #1 Lynn Cole (Engineering) Forwarded Copy of Change Order to PAL General Engineering