8TH STREET SMART GROWTH REVITALIZATION
Specification No. 12-13
Contractor: PAL General Engineering, Inc.
Reason/Purpose for this Change Order.
The contractor is requesting to move the phasing of the median and median light work on 8th from the beginning
of the project to the end of the project in order to facilitate more traffic control options in an effort to enhance
;project efficiency.
CHANGE ORDER NO. 1
August 19, 2013
The City of National City and Contractor agree to the following change to the original Contract:
'The Contractor and the City agree to move the phasing for the installation of the new streetlights and medians on
;8th from the beginning of the project to the end of the project. The Contractor agrees that he shall coordinate the'.
Iremoval of the existing powerpoles with the Utility Companies after the installation and energizing of the new
`streetlights; that any surface improvements that are blocked out temporarily to preserve the existing power pole
and light shall be installed with the same concrete supplier and finish as the adjacent improvements such that
;there will be no indication that those improvements were installed at a later date; that there will be no additional
days added to the contract for this change; that there will be no additonal costs to the City for this change; and
'that the Contractor shall maintain any blocked out areas in a safe manner that allows for pedestrian access at all 1
times.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount...
Working days added: 0 Working days subtracted: 0
!Submitted by:
City..Engineer
3,978,336.35
3, 978, 336.35
$ 3,978,336.35
Percent change in Contract to date 0.00%
" Z7-i,3 '
Date ct Ma afar Date
Date City Manager, required for Change Orders>$24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by PAL General Engneering, Inc.:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
I ,.\I. (I
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
PAL GENERAL ENGINEERING
8th Street Smart Growth Revitalization
Change Order #1
Lynn Cole (Engineering) Forwarded Copy of
Change Order to PAL General Engineering