HomeMy WebLinkAbout2013 CON Koch Armstrong - Pedestrian Crossing Project Sp 12-12 - Notice of CompletionPLEASE COMPLETE THIS INFORMATION
RECORDING REQUESTED BY:
CITY CLERK OF NATIONAL CITY
1243 National City Blvd.
National City, CA 91950
AND WHEN RECORDED MAIL TO:
CITY ENGINEER
CITY OF NATIONAL CITY
1243 National City Blvd.
National City, CA 91950
D O C ## 2013-0684368
111111 I III IIIII IIIII IIIII IIIII IIIII IIIII III IIIII 1 III IIIII IIII IIII
NOV 20, 2013 9:43 AM
OFFICIAL RECORDS
SAN DIEGO COUNTY RECORDER'S OFFICE
Ernest J. Dronenburg, Jr., COUNTY RECORDER
FEES: 0.00
PAGES 2
1111111111111111111111111111111111111111111111111111111111111111111111111111111111111
THIS SPACE FOR RECORDER'S USE ONLY
(Note: This document is recorded on behalf of the City of National City, a municipal corporation, and is exempt
from Recorder's fees pursuant to Government Code Section 27383)
NOTICE OF COMPLETION: CITYWIDE PEDESTRIAN CROSSING, SPECIFICATION NO. 12-12
(Please fill in document title(s) on this line)
THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION
(Additional recording fee applies)
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO:
NAME: CITY OF NATIONAL CITY
ADDRESS: 1243 NATIONAL CITY BOULEVARD
NATIONAL CITY, CA 91950
NOTICE OF COMPLETION
CALIFORNIA CIVIL CODE SECTION 3093
NOTICE IS HEREBY GIVEN of the completion on November 4, 2013 of the Citywide Pedestrian
Crossings Project, Specification No. 12-12
Work of improvement or portion of work of improvement under construction or alteration.
Various locations in National City, CA 91950
Street Address City State
Zip Code
The undersigned owns the following interest or estate in said property:
Owner in fee
Nature of the interest or estate of owner (mortgagor, lessee, etc.)
Said work of improvement was performed on the property pursuant to a contract with
Koch -Armstrong General Engineering
Name of Original Contractor
The following work and material were supplied:
Labor provided: General Laborer. Materials: Concrete, asphalt, irrigation supplies, traffic control
supplies. Equipment: paving equipment.
General statement of kind of labor, services, equipment or materials
The names and addresses of co -owners are: N/A
Dated: November 12, 2013;
Joigl jenants. tenants in common, or other owners
Signature of Owner
City of National City, 1243 National City Blvd., National City, CA 91950
I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents
thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing
is true and correct.
Executed on Nove r 12, 2013 at, National City, California.
Signature:
RON MORRISON, MAYOR
Nt)9.Q5
RESOLUTION NO. 2013 — 180
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ACCEPTING THE WORK PERFORMED BY KOCH-ARMSTRONG GENERAL
ENGINEERING, INC., APPROVING THE FINAL CONTRACT AMOUNT OF $859,808.86,
AUTHORIZING THE RELEASE OF THE RETENTION IN THE AMOUNT OF $42,990.44,
AND RATIFYING THE NOTICE OF COMPLETION FILED WITH THE COUNTY
RECORDER ON NOVEMBER 20, 2013 FOR THE CITY-WIDE
PEDESTRIAN CROSSING ENHANCEMENTS PROJECT
BE IT RESOLVED by the City Council of the City of National City as follows:
It appearing to the satisfaction of the Engineering Division of the Development Services
Department that all work required to be done by Koch -Armstrong General Engineering, Inc., for
the total final contract amount of $859,808.86, for the City Wide Pedestrian Crossing
enhancements Project has been completed, the City Council of National City hereby accepts
said work, orders that payment for said work be made in accordance with said contract,
including release of the retention in the amount of $42,990.44, and ratifies the Notice of
Completion filed with the County Recorder on November 20, 2013.
PASSED and ADOPTED this 3rd day of December, 2013.
ATTEST:
IrLi
Michael R. Dalla, f
CityClerk
PRI,,,. D AS TO FORM:
tua Silva
City Atto
Passed and adopted by the Council of the City of National City, California, on
December 3, 2013 by the following vote, to -wit:
Ayes: Councilmembers Cano, Morrison, Natividad, Rios, Sotelo-Solis.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
Jerk of the City of atio
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2013-180 of the City of National City, California, passed and
adopted by the Council of said City on December 3, 2013.
City Clerk of the City of National City, California
By:
Deputy
City C nal City, California
CITY OF NATIONAL CITY, CALIFORNIA
COUNCIL AGENDA STATEMENT
EETING DATE: December 3, 2013
AGENDA ITEM NO. 10
ITEM TITLE:
Resolution of the City Council of the City of National City: 1) accepting the work of Koch -Armstrong
General Engineering, Inc., 2) approving the final contract amount of $859,808.86, 3) authorizing the
release of retention in the amount of $42,990.44, and 4) ratifying the filing of a Notice of Completion
for the Citywide Pedestrian Crossing Enhancements Project, Specification No. 12-12 (funded by
CDBG and Proposition A funds).
PREPARED BY: Stephen Manganiello
PHONE: 619-336-4382
EXPLANATION:
See attached
DEPARTMENT: Engineering
APPROVED BY:
FINANCIAL STATEMENT: APPROVED: --1/-Finance
ACCOUNT NO. APPROVED: MIS
Retention is encumbered on Purchase Order 76675 and will be released upon City Council approval.
ENVIRONMENTAL REVIEW:
N/A
ORDINANCE: INTRODUCTION:
FINAL ADOPTION:
STAFF RECOMMENDATION:
Adopt Resolution
BOARD / COMMISSION RECOMMENDATION:
N/A
TTACHMENTS:
1. Explanation
2. Notice of Completion
3. Final Contract Balance Sheet
4. Resolution
On February 14, 2013, ten (10) sealed bids were received, opened, and read to the
public for the Citywide Pedestrian Crossing Enhancements Project, Specification No. 12-
12. The project included installation of ADA compliant pedestrian ramps, new sidewalk,
curb and gutter, bulb -outs for traffic calming, pedestrian refuge islands, street
resurfacing, and enhanced crosswalk signing and striping at the following five locations:
1. E. 4th Street from Palm Avenue to Euclid Avenue;
2. E. 30th Street at F Avenue;
3. E. 8th Street from Palm Avenue to Harbison Avenue;
4. National City Boulevard at 7th Street;
5. National City Boulevard at 14th Street.
After reviewing the bids, staff determined that Koch -Armstrong General Engineering,
Inc.'s bid was responsive and that they were the lowest responsible bidder qualified to
perform the work as described in the project specifications
On March 5, 2013, the City Council adopted Resolution No. 2013-31 awarding the
contract to Koch -Armstrong in the amount of $813,949.15.
The Notice to Proceed with construction was issued on March 14, 2013, with a
construction start date of March 25, 2013. The Notice of Completion was issued on
November 4, 2013 and filed with the San Diego County Recorder's Office on November
20, 2013.
The 22 change orders issued for this project are detailed in the Final Contract Balance
Report (see attached). The 22 change orders increasedthe contract by $87,358.42,
while line item adjustments decreased the contract by $41,498.71, for a net increase of
$45,859.71 to the contract. This results in a 5.6% contract increase for a final contract
balance of $859,808.86.
As a result of satisfactory completion of the project, staff recommends that City Council:
1) accept the work of Koch -Armstrong General Engineering, Inc., 2) approve the final
contract amount of $859,808.86, 3) authorize the release of retention in the amount of
$42,990.44, and 4) ratify the filing of a Notice of Completion for the Citywide Pedestrian
Crossing Enhancements Project, Specification No. 12-12.
PLEASE COMPLETE THIS INFORMATION
RECORDING REQUESTED BY:
CITY CLERK OF NATIONAL CITY
1243 National City Blvd.
National City, CA 91950
AND WHEN RECORDED MAIL TO:
CITY ENGINEER
CITY OF NATIONAL CITY
1243 National City Blvd.
National City, CA 91950
THE ORIGINAL OF THIS DOCUMENT
WAS RECORDED ON NOV 20, 2013
DOCUMENT NUMBER 2013-0684368
Ernest J. Dronenburg, Jr., COUNTY RECORDER
SAN DIEGO COUNTY RECORDER'S OFFICE
TIME: 9:43 AM
THIS SPACE FOR RECORDER'S USE ONLY
(Note: This document is recorded on behalf of the City of National City, a municipal corporation, and is exempt
from Recorder's fees pursuant to Government Code Section 27383)
NOTICE OF COMPLETION: CITYWIDE PEDESTRIAN CROSSING, SPECIFICATION NO. 12-12
(Please fill in document title(s) on this line)
THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION
(Additional recording fee applies)
-1-
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO:
NAME: CITY OF NATIONAL CITY
ADDRESS: 1243 NATIONAL CITY BOULEVARD
NATIONAL CITY, CA 91950
NOTICE OF COMPLETION
CALIFORNIA CIVIL CODE SECTION 3093
NOTICE IS HEREBY GIVEN of the completion on November 4, 2013 of the Citywide Pedestrian
Crossings Project, Specification No. 12-12
Work of improvement or portion of work of improvement under construction or alteration.
Various locations in National City, CA 91950
Street Address City State Zip Code
The undersigned owns the following interest or estate in said property:
Owner in fee
Nature of the interest or estate of owner (mortgagor, lessee, etc.)
Said work of improvement was performed on the property pursuant to a contract with
Koch -Armstrong General Engineering
Name of Original Contractor
The following work and material were supplied:
Labor provided: General Laborer. Materials: Concrete, asphalt, irrigation supplies, traffic control
supplies. Equipment: paving equipment.
General statement of kind of labor, services, equipment or materials
The names and addresses of co -owners are: N/A
Dated: November 12, 2013;
Jo enants, tenants in common, or other owners
Signature of Owner
City of National City, 1243 National City Blvd., National City, CA 91950
I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents
thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing
is true and correct.
Executed on Nove r 12, 2013 at, National City, California.
Signature:
RON MORRISON, MAYOR
Noe09.05
-2-
FINAL CONTRACT BALANCE
DATE: October 31, 2013
PROJECT: Citywide Pedestrian Crossings
FY 12-13
Specification No. 12-12
TO:
Koch -Armstrong
PO Box 1190
Lakeside, CA 92040
ORIGINAL CONTRACT AMOUNT:
START DATE:
COMPLETION DATE:
ORIGINAL CONTRACT LENGTH:
EXTENTION OF WORK DAYS:
TOTAL CONTRACT TIME:
DESCRIPTION:
$813,949.15
March 25, 2013
September 27, 2012
60 Working Days
35 Working Days
95 Working Days
The Final Contract Balance reports final line item amounts and summarizes all change orders to produce
a final contract amount.
CHANGE ORDERS AND LINE ITEM ADJUSTMENTS:
Change Order #1 deleted the 36" box trees at National City Blvd. and 14th St. as they were removed
from the plans by the designer and no longer needed as a bid item. This work was performed at an
agreed upon price. This Change Order resulted in a deduct to the contract in the amount of $ 7,947.00.
Change Order #2 required the reconstruction a Manhole cone @ 30th St. and F Ave. It was too high for
the new design grades and had to be reconstructed in order to be lowered to finish pave elevation. This
allowed for the adjustment to the new design grades. This work was performed at an agreed upon
price. This Change Order total amount was $ 2,750.00.
Change Order #3 directed the contractor to repair a pothole due to a failed abandon utility
abandonment as directed by National City at NC Blvd. and 7th. The work was performed on a T&M
basis. This Change Order total amount was $ 217.92.
Change Order #4 directed the contractor to saw cut the stamped concrete and asphalt, removed the
stamped concrete, curb and asphalt and replace curb and asphalt as needed to provide 2' additional
-3-
FINAL CONTRACT BALANCE
National City Citywide Pedestrian Crossings
Specification No. 12-12
lane width on 30th. This work was performed at an agreed upon price. This Change Order total
amount was $ 5,597.02.
Changer Order #5 added directed the contractor to match the existing sidewalk and maintenance strip
color and finish along National City Blvd. @ 14th. A french grey colored concrete was used with a light
washed finish. This work was performed at an agreed upon price. This Change Order total amount was
$ 2,174.42.
Change Order #6 deleted the bio-barrier at National City Blvd. and 14th St. as they were no longer
needed with the deletion of the 36" box trees by the designer. This work was performed at an agreed
upon price. This Change Order resulted in a deduct to the contract in the amount of $ 3,230.00.
Change Order #7 directed the contractor to excavate wet subgrade under existing cross gutter on
southwest side of 30th St. and F Ave. This work was performed on a T&M basis. This Change Order
total amount was $ 1,050.40.
Change Order #8 directed the contractor to excavate 5'x50' of subgrade, place concrete sidewalk at
same location, remove and replace 66 feet of curb and gutter and repair the slot patch as needed at
21st. and I Ave. This work was performed at an agreed upon price. This Change Order total amount was
$ 5,777.20.
Change Order #9 directed the contractor to excavate and remove three 11' x 11' areas in the proposed
center median locations for the addition of ADA Pedestrian Passageways at 8th St. in lieu of striped
crosswalks as directed by National City. This work was performed at an agreed upon price. This Change
Order total amount was $ 7,827.82.
Change Order #10 directed the contractor to delete design planned planted median on 8th St. This
included the deletion of survey, unclassified excavation, portion of median curb, vegetation median, and
a portion of the misc. signage and striping. The original design called for drought tolerant material with
no irrigation. Current design requirements could pose added maintenance cost issues for the city with a
low survivability rate of plant material. City will review adding this island at a later date with an
automatic irrigation system. This work was performed at an agreed upon price. This Change Order
resulted in a deduct to the contract in the amount of $ 6,042.77.
Change Order #11 directed the contractor to provide additional striping at 7th St. and NC Blvd. as
directed by National City. This work was performed at an agreed upon price. This Change Order total
amount was $ 963.00.
Change Order #12 reviewed the designed irrigation system at 14th and National City Blvd. The city
decided to have the contractor match the existing irrigation system in lieu of installing per plans. This
would make future maintenance of the system more practical for city crews. The continuity between
the two systems would also allow managing the irrigation water cycles more efficient. This work was
-4-
FINAL CONTRACT BALANCE
National City Citywide Pedestrian Crossings
Specification No. 12-12
performed at an agreed upon price. This Change Order resulted in a deduct to the contract in the
amount of $ 1,100.00.
Change Order # 13 directed the contractor to remove existing vegetation not originally identified on the
plans, excavate and install additional mainline and backfill and repair as directed. This work was
performed at an agreed upon price. This Change Order total amount was $ 4,355.13.
Change Order # 14 directed the contractor to provide 26 "Push to Activate Crossing Warning" pedestrian
push button signs to match existing signs @ Highland and 28th for pedestrian safety. This work was
performed at an agreed upon price. This Change Order total amount was $ 3,343.00.
Change Order #15 directed the contractor to install a separate pedestrian push button to comply with
ADA specifications due to a conflict with an existing power pole and the 16 pole located at the second
proposed median crossing on 8th St. This work was performed at an agreed upon price. This Change
Order total amount was $ 1,598.63.
Change Order #16 directed the contractor to procure 12 additional Type "Q" markers as requested by
city. This work was performed at an agreed upon price. This Change Order total amount was $ 778.28.
Change Order # 17 directed the contractor to complete striping not shown on plans by adding five
reflectors to each median nose on 8th St. for a total of 30 reflectors, and paint each median nose yellow.
This work was performed at an agreed upon price. This Change Order total amount was $ 690.00.
Change Order #18 directed the contractor to repaired as necessary an unknown area drain connection
and repair of a broken conduit not shown on plans. The work was performed on a T&M basis. This
Change Order total amount was $ 1,027.55.
Change Order #19 directed the contractor to provide additional work not show on the original plans for
improvements on T Ave. from Sta. 10+82.75 to Sta. 12+19.56. Contractor removed existing AC, concrete
and subgrade including misc. clearing and reconstruct 3"AC/6" CLII Base, curb & gutter, driveways,
sidewalk, including masonry retaining wall and survey to complete all improvements shown on T Ave.
plan NC T Ave SW 100 Plans dated 07/13/10 provided by Harris & Assoc. and all other misc work
necessary to complete improvements. This work was performed at an agreed upon price. This Change
Order total amount was $ 48,047.82.
Change Order #20 directed the contractor to remove and replace ADA ramps at the N/W corner of
Division and T Ave, remove ADA ramp at the S/E corner of Division and T Ave and repalce with C&G and
sidewalk, and install truncated domes at the N/E and S/W corner of Division and T Ave. including all
removal and replacement work necessary to complete work. This work was performed at an agreed
upon price. This Change Order total amount was $ 10,980.00.
-5-
FINAL CONTRACT BALANCE
National City Citywide Pedestrian Crossings
Specification No. 12-12
Change Order #21 directed the contractor to remove and replace sidewalk and portion of driveway near
635 Harbison Avenue including all labor, equipment and materials necessary. This work was performed
at an agreed upon price. This Change Order total amount was $ 1,450.00.
Change Order #22 directed the contractor to contractor to remove and replace all concrete sidewalk
panels at the Nutrition Center and Morgan Towers as marked in the field including all labor, equipment
and materials necessary. This work was performed at an agreed upon price. This Change Order total
amount was $ 7,050.00.
All Change Orders listed above increased the total contract amount $ 87,358.42.
There were numerous line item adjustments per the attached FINAL BILLING STATEMENT that resulted
in a total deduct of $ 41,498.71.
CONTRACT ADJUSTMENT:
As a result of the above change orders and line item adjustments, the contract price is adjusted as
follows:
1. The final contract price is adjusted to $ 859,808.86.
2. As a result of the satisfactory completion of said project, a retention amount of $ 42,990.44 is
set for invoice processing and payment upon the receipt of signatures and City Council's
ratification of this agreement and the Notice of Completion.
This document and its purpose to balance payment shall be considered full compensation for furnishing
and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for
performing the work described above. Koch -Armstrong will not be entitled to damages or additional
payment for delays as described in the 2012 edition of the Standard Specifications for Public Works
Construction, Section 6-6.3, for performing the work as described above.
-6-
CITY OF NATIONAL CITY
Citywide Pedestrian Crossing
Project #: 12-12
FINAL BILLING STATEMENT
October 31, 2013
Original Contract
Total To Date
Delta
ITEM NO.
DESCRIPTION
CONTRACT
QUANTITY
UNIT PRICE
AMOUNT
TOTAL
QUANTITY OR
% TO DATE
TOTAL AMOUNT TO
DATE
Bid Schedule A -
East 4th Street
from Palm
Avenue to Euclid Avenue
Al
Mobilization / Demobilization
1
$3,200.00
$3,200.00
1.00
3,200.00
-
A2
Surveying
1
$4,200.00
$4,200.00
1.00
4,200.00
-
A3
Clearing &Grubbing
1
$8,550.00
$8,550.00
1.00
8,550.00
-
A4
Storm Water BMPs
1
$490.00
$490.00
1.00
490.00
-
A5
Traffic Control
1
$20,480.00
$20,480.00
1.00
20,480.00
-
A6
Unclassified Excavation
1
$59,890.00
$59,890.00
1.00
59,890.00
-
A7
Construct 3" AC Pavement
580
$95.00
$55,100.00
556.47
52,864.65
(2,235.35)
(172.26)
A8
Construct 8" Aggregate Base
1,490
$15.15
$22,573.50
1478.63
22,401.24
A9
Type II Slurry Seal
18,900
$3.21
$60,669.00
15282.00
49,055.22
(11,613.78)
(280.00)
A10
PCC Median Curb (6" CF) SDRSD G-6, Type B-
1
110
$20.00
$2,200.00
96.00
1,920.00
All
Stamped & Colored PCC Median (4" thick)
290
$7.70
$2,233.00
290.00
2,233.00
Al2
PCC Curb & Gutter (6" CF) per SDRSD G-2
170
$23.00
$3,910.00
76.00
1,748.00
(2,162.00)
A13
PCC Curb & Gutter (8" CF) per SDRSD G-2
510
$24.00
$12,240.00
336.00
8,064.00
(4,176.00)
-
A14
PCC Curb & Gutter (Variable CF) per
Modified SDRSD G-1 Adjacent to Private
Walkway +/- sta. 53+65
10
$28.00
$280.00
10.00
280.00
A15
Construct 6" AC Dike per SDRSD G-5 Type
„A„
20
$31.00
$620.00
0.00
(620.00)
A16
Construct Cross Gutter per SDRSD G-12
810
$7.80
$6,318.00
768.00
5,990.40
(327.60)
A17
4" PCC Sidewalk, SDRSD G-7
5,620
$3.70
$20,794.00
5461.00
20,205.70
(588.30)
A18
PCC Driveway (W=10') per SDRSD G-14A
180
$10.00
$1,800.00
295.00
2,950.00
1,150.00
A19
Construct Portion of PCC Driveway per
SDRSD G-14A
20
$10.00
$200.00
10.00
100.00
(100.00)
A20
PCC Bus Pad per Modified SDG-102
760
59.30
$7,068.00
720.00
6,696.00
(372.00)
A21
PCC Curb Ramp per City Std SDG-132
7
$1,600.00
$11,200.00
7.00
11,200.00
-
A22
Curb Inlet Type "B" per SDRSD D-2
1
$7,640.00
$7,640.00
1.00
7,640.00
-
A23
Island Refuge with Passageway with
Truncated Domes per City std SDG-130
1
$1,700.00
$1,700.00
1.00
1,700.00
ITEM NO.
DESCRIPTION
CONTRACT
QUANTITY
UNIT PRICE
AMOUNT
TOTAL
QUANTITY OR
% TO DATE
TOTAL AMOUNT TO
DATE
A24
Adjust Water Meters to New Finished Grade
(NFG)
7
$40.00
$280.00
7.00
280.00
-
A25
Adjust Water Valve to NFG
8
$50.00
$400.00
8.00
400.00
-
A26
Adjust Manhole to NFG
2
$620.00
$1,240.00
2.00
1,240.00
-
A27
Adjust Exist. Sewer CO to grade, SDRSD SC-
01, Type "B"
1
$390.00
$390.00
0.00
(390.00)
A28
Adjust Well Mon. to NFG
2
$390.00
$780.00
0.00
-
(780.00)
A29
Traffic Signing and Striping
1
$30,880.00
$30,880.00
1.00
30,880.00
-
A30
Solar Powered LED Enhanced School
Warning Sign System
2
$15,770.00
$31,540.00
2.00
31,540.00
A31
Type 1-B Pole (14') per Caltrans Standard
Plan ES-7B (for LED Enhanced School
Warning Sign System)
4
$1,590.00
$6,360.00
4.00
6,360.00
-
$385,225.SO
$352,558:21-',
'
Bid Schedule
B - East
30th Street
at F Avenue
7$22,667,29
B1
Mobilization / Demobilization
1
$1,710.00
$1,710.00
1.00
1,710.00
-
B2
Surveying
1
$1,480.00
$1,480.00
1.00
1,480.00
-
B3
Clearing & Grubbing
1
$2,610.00
$2,610.00
1.00
2,610.00
-
B4
Storm Water BMPs
1
$310.00
$310.00
1.00
310.00
-
B5
Traffic Control
1
$5,260.00
$5,260.00
1.00
5,260.00
-
B6
Unclassified Excavation
1
$22,410.00
$22,410.00
1.00
22,410.00
-
B7
Construct 4" AC Pavement
160
$104.00
$16,640.00
220.27
22,908.08
6,268.08
88
Construct 10" Aggregate Base
390
$17.00
$6,630.00
339.14
5,765.38
(864.62)
B9
PCC Median Curb (Type B-1, 6" CF) per
SDRSD G-6
210
$19.50
$4,095.00
205.00
3,997.50
(97.50)
B10
Stamped & Colored PCC Median (4" thick)
700
$5.60
$3,920.00
667.00
3,735.20
(184.80)
B11
PCC Curb & Gutter (6" CF) per SDRSD G-2
180
$24.50
$4,410.00
89.00
2,180.50
(2,229.50)
B12
Cross Gutter per SDRSD G-12
790
$7.75
$6,122.50
738.80
5,725.70
(396.80)
B13
PCC Sidewalk (4" thick) per SDRSD G-7
680
$4.65
$3,162.00
674.00
3,134.10
(27.90)
B14
PCC Curb Ramp (Type A) per City Std SDG-
132
2
$1,560.00
$3,120.00
2.00
3,120.00
B15
PCC Curb Ramp (Type D) per City Std SDG-
136
1
$1,340.00
$1,340.00
1.00
1,340.00
B16
PCC Curb Ramp (Case E) per City Std SDG-
137 with Pedestrian Protective Railing
behind curb ramp per SDRSD M-24
1
$6,170.00
$6,170.00
1.00
6,170.00
-
B17
Island Refuge / Passageway with Truncated
Domes per City Std SDG-130
1
$1,050.00
$1,050.00
1.00
1,050.00
B18
Adjust Water Valve to New Finished Grade
1
$40.00
$40.00
1.00
40.00
ITEM NO.
DESCRIPTION
CONTRACT
QUANTITY
UNIT PRICE
AMOUNT
TOTAL
QUANTITY OR
% TO DATE
TOTAL AMOUNT TO
DATE
B19
Adjust Manhole to New Finished Grade
1
$610.00
$610.00
1.00
610.00
-
B20
Adjust Survey Well Monument to New
Finished Grade
1
$400.00
$400.00
1.00
400.00
-
B21
Traffic Signing and Striping
1
$8,700.00
$8,700.00
1.00
8,700.00
-
B22
Solar Powered LED Enhanced School
Warning Sign System
1
$14,700.00
$14,700.00
1.00
14,700.00
-
B23
Type 1-B Pole (14') per Caltrans Standard
Plan ES-7B (for LED Enhanced School
Warning Sign System)
2
$1,660.00
$3,320.00
2.00
3,320.00
-
$11$,209,S
42Q,676:45
$2,466:96
Bid Schedule C - East
8th Street
from Palm Avenue
to Harbison Avenue
C1
Mobilization / Demobilization
1
$490.00
$490.00
1.00
490.00
-
C2
Surveying
1
$740.00
$740.00
1.00
740.00
-
C3
Clearing & Grubbing
1
$960.00
$960.00
1.00
960.00
-
C4
Storm Water BMPs
1
$140.00
$140.00
1.00
140.00
-
C5
Unclassified Excavation
1
$710.00
$710.00
1.00
710.00
-
C6
Traffic Control
1
$1,990.00
$1,990.00
1.00
1,990.00
-
C7
6" Type B-3 Median Curb G-6
300
$17.00
$5,100.00
228.00
3,876.00
(1,224.00)
C8
6" Stamped Concrete Median
900
$7.65
$6,885.00
852.00
6,517.80
(367.20)
C9
Vegetated Median
345
$5.65
$1,949.25
345.00
1,949.25
-
C10
Signing and Striping
1
$6,750.00
$6,750.00
1.00
6,750.00
-
C11
Solar Powered LED Enhanced School
Warning Sign System
3
$15,770.00
$47,310.00
3.00
47,310.00
-
C12
Type 1-8 Pole (14') per Caltrans Standard
Plan ES-7B (for LED Enhanced School
Warning Sign System)
6
$1,590.00
$9,540.00
6.00
9,540.00
-
D1
Bid Schedule
Mobilization / Demobilization
D - National
1
City Boulevard
$590.00
and 7th Street
$590.00
1.00
$80,973 0
590.00
�4,591:2t1
-
D2
Surveying
1
$240.00
$240.00
1.00
240.00
-
D3
Clearing & Grubbing
1
$590.00
$590.00
1.00
590.00
-
D4
Unclassified Excavation
1
$910.00
$910.00
1.00
910.00
-
D5
Storm Water BMPs
1
$120.00
$120.00
1.00
120.00
-
D6
Traffic Control
1
$730.00
$730.00
1.00
730.00
-
D7
Concrete Curb
148
$15.50
$2,294.00
146.00
2,263.00
(31.00)
D8
Minor Concrete Curb Paving
74
$10.00
$740.00
73.00
730.00
(10.00)
D9
Asphalt Paving, 6" thick
148
$11.00
$1,628.00
146.00
1,606.00
(22.00)
D10
Asphalt Overlay
740
$3.65
$2,701.00
720.00
2,628.00
(73.00)
D11
Signing and Striping
1
$3,450.00
$3,450.00
1.00
3,450.00
-
3j 3:tH1'
:$13,800
Bid Schedule
E - National
City Boulevard
and 14th Street
ITEM NO.
DESCRIPTION
CONTRACT
QUANTITY
UNIT PRICE
AMOUNT
TOTAL
QUANTITY OR
TO DATE
TOTAL AMOUNT TO
DATE
El
Mobilization / Demobilization
1.00
$3,510.00
$3,510.00
1.00
3,510.00
-
E2
Construction Surveying
1.00
$1,560.00
$1,560.00
1.00
1,560.00
-
E3
Clearing & Grubbing
1.00
$4,450.00
$4,450.00
1.00
4,450.00
-
E4
Unclassified Excavation
1.00
$25,120.00
$25,120.00
1.00
25,120.00
-
E5
Storm Water BMPs
1.00
$1,340.00
$1,340.00
1.00
1,340.00
-
E6
Traffic Control
1.00
$7,110.00
$7,110.00
1.00
7,110.00
-
E7
Import
230.00
$19.00
54,370.00
110.00
2,090.00
(2,280.00)
E8
Construct Pedestrian Concrete Pavement G-
7, G-9 & G-10
1,770.00
$4.70
$8,319.00
1222.02
5,743.49
(2,575.51)
E9
6" Curb & Gutter, SDRSD G-2
155.00
$25.50
S3,952.50
157.00
4,003.50
51.00
E10
Median Curb, SDRSD B-1, G-6
400.00
$24.15
$9,660.00
378.00
9,128.70
(531.30)
E11
6" Curb, SDRSD G-1
30.00
$20.00
$600.00
0.00
-
(600.00)
E12
Cross -gutter, SDRSD G-12
115.00
$8.00
$920.00
245.00
1,960.00
1,040.00
E13
Concrete Median Passageway, Type A w/
domes per Caltrans A88A and A88B
1.00
$1,160.00
$1,160.00
1.00
1,160.00
-
E14
Concrete Median Nose per Detail C, sheet 2
30.00
$23.50
$705.00
36.40
855.40
150.40
E15
Concrete in Median for Landscape
Maintenance
400.00
$11.00
$4,400.00
399.00
4,389.00
(11.00)
E16
Mill Existing Asphalt (2" Depth)
1,300.00
$0.93
$1,209.00
958.00
890.94
(318.06)
E17
Asphalt Pavement Incl. Overlay
210.00
$127.00
$26,670.00
206.72
26,253.44
(416.56)
E18
Class II Base
260.00
$26.00
$6,760.00
260.44
6,771.44
11.44
E19
Slurry Seal
1,661.00
$7.40
$12,291.40
1952.00
14,444.80
2,153.40
E20
Curb Ramp, Type A, G-27
4.00
$1,350.00
$5,400.00
4.00
5,400.00
-
E21
Signing and Striping
1.00
$5,780.00
$5,780.00
1.00
5,780.00
-
E22
Irrigation System
1.00
$7,840.00
$7,840.00
1.00
7,840.00
-
E23
Mulch, 3" thick
14.00
$98.00
$1,372.00
9.00
882.00
(490.00)
E24
5 Gallon Shrubs
325.00
$27.00
$8,775.00
343.00
9,261.00
486.00
E25
36" Box Trees
9.00
$883.00
$7,947.00
9.00
7,947.00
-
E26
Bio-Barrier, 20 foot length
17.00
$190.00
$3,230.00
17.00
3,230.00
-
E27
Soil Preparations and Amendments
14.00
$129.00
$1,806.00
14.00
1,806.00
-
E28
90-Day Landscaping Maintenance
1.00
$1,500.00
$1,500.00
1.00
1,500.00
-
E29
Solar Powered LED Enhanced School
Warning Sign System
1.00
$15,770.00
$15,770.00
1.00
15,770.00
-
E30
Type 1-8 Pole (14') per Caltrans Standard
Plan ES-7B (for LED Enhanced School
Warning Sign System)
2.00
$1,590.00
$3,180.00
2.00
3,180.00
-
.`3f#Eia$li.'..i i
.
.:.'41.•
Additive Bid #1- All Locations
ITEM NO.
DESCRIPTION
CONTRACT
QUANTITY
UNIT PRICE
AMOUNT
TOTAL
QUANTITY OR
% TO DATE
TOTAL AMOUNT TO
DATE
ADD #1
Removal & Disposal of Unsuitable Subgrade,
Provide and Place Mirafi 700x Geotextile
Fabric, Provide, Place and Compact Crushed
Aggregate Base
500.00
$54.50
$27,250.00
202.00
11,009.00
(16,241.00)
_$ 6,241.00
$27,25O.o ,;
$11,009 00
ORIGINAL CONTRACT ITEMS
$813,949.15
FINAL CONTRACT ITEMS
$772,450.44
Change
Orders
CO #1
Delete Trees & Root Barriers @ 14th
1.00
$ (7,947.00)
-$7,947.00
1.00
(7,947.00)
-
CO #2
Reconstruct MH @ 30th
1.00
$ 2,750.00
$2,750.00
1.00
2,750.00
-
CO #3
Repair AC @ 7th
1.00
$ 217.92
$217.92
1.00
217.92
-
CO #4
Reduce median width @ 30th
1.00
$ 5,597.02
$5,597.02
1.00
5,597.02
-
CO #5
Match color & finish @ 14th & NC Blvd.
1.00
$ 2,174.42
$2,174.42
1.00
2,174.42
-
CO#6
Delete 36" Box Trees @ 14th &NC
1.00
$ (3,230.00)
-$3,230.00
1.00
(3,230.00)
-
CO#7
Excavate wet subgrade @ 30th & F
1.00
$ 1,050.40
$1,050.40
1.00
1,050.40
-
CO#8
Conc. And AC repairs @ 21st & I
1.00
$ 5,777.20
$5,777.20
1.00
5,777.20
-
CO#9
Add ADA domes and pedestrian refuge on
8th
1.00
$ 7,827.82
$7,827.82
1.00
7,827.82
-
CO#10
Delete portion of contract work (Survey,
Demo & planting) on 8th
1.00
$ (6,042.77)
-$6,042.77
1.00
(6,042.77)
-
CO#11
Misc striping @ 7th & NC
1.00
$ 963.00
$963.00
1.00
963.00
-
CO#12
Irrigation System Modification
1.00
$ (1,100.00)
-$1,100.00
1.00
(1,100.00)
-
CO#13
Additional Irrigation Mainline
1.00
$ 4,355.13
$4,355.13
1.00
4,355.13
-
CO#14
Ped Crossing Signs
1.00
$ 3,343.00
$3,343.00
1.00
3,343.00
-
CO#15
Add Ped Push Button
1.00
$ 1,598.63
$1,598.63
1.00
1,598.63
-
CO#16
Type "Q" Markers
1.00
$ 778.28
$778.28
1.00
778.28
-
CO#17
Add Striping on 8th
1.00
$ 690.00
$690.00
1.00
690.00
-
CO#18
T&M Drain and conduit repairs
1.00
$ 1,027.55
$1,027.55
1.00
1,027.55
-
CO#19
Additional Improvements On T Ave.
1.00
$ 48,047.82
$48,047.82
1.00
48,047.82
-
CO#20
Additional Imp. At Division & T Ave.
1.00
$ 10,980.00
$10,980.00
1.00
10,980.00
-
CO#21
Misc . Conc. Imp. On Harbison
1.00
$ 1,450.00
$1,450.00
1.00
1,450.00
-
CO#22
Conc. @ Nutrition & Morgan Towers
1.00
$ 7,050.00
$7,050.00
1.00
7,050.00
-
SUB TOTAL CHANGE ORDERS
$ 87,358.42
$ 87,358.42
$ -
FINAL ADD/DEDUCT
$ (41,498.71)
FINAL CONTRACT TOTAL
$$SO,808.86
RESOLUTION NO. 2013 — 180
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ACCEPTING THE WORK PERFORMED BY KOCH-ARMSTRONG GENERAL
ENGINEERING, INC., APPROVING THE FINAL CONTRACT AMOUNT OF $859,808.86,
AUTHORIZING THE RELEASE OF THE RETENTION IN THE AMOUNT OF $42,990.44,
AND RATIFYING THE NOTICE OF COMPLETION FILED WITH THE COUNTY
RECORDER ON NOVEMBER 20, 2013 FOR THE CITY-WIDE
PEDESTRIAN CROSSING ENHANCEMENTS PROJECT
BE IT RESOLVED by the City Council of the City of National City as follows:
It appearing to the satisfaction of the Engineering Division of the Development Services
Department that all work required to be done by Koch -Armstrong General Engineering, Inc., for
the total final contract amount of $859,808.86, for the City Wide Pedestrian Crossing
enhancements Project has been completed, the City Council of National City hereby accepts
said work, orders that payment for said work be made in accordance with said contract,
including release of the retention in the amount of $42,990.44, and ratifies the Notice of
Completion filed with the County Recorder on November 20, 2013.
PASSED and ADOPTED this 3rd day of December, 2013.
Ron Morrison, Mayor
ATTEST:
Michael R. Della, City Clerk
APPROVED AS TO FORM:
Claudia Gacitua Silva
City Attorney