Specification No. 12-13
Contractor: PAL General Engineering, Inc.
Reason/Purpose for this Change Order:
This change order is to use hot melt thermoplastic in lieu of preformed thermoplastic for a cost savings to the city
and still achieve the same goal.
CHANGE ORDER NO. 3
December 17, 2013
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor and the City agree to reduce Bid Item 38, Signage, Striping and Pavement Markings, by
$29,258.17 with the use of hot melt thermoplastic instead of preformed thermoplastic. See attachment "A" for the
cost breakdown.
Original Contract Amount...
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount.. $ 3,962,918.17
Working days added: 0
Submitted by:
3, 978, 336.35
13,839.99
3,992,176.34
(29,258.17)
Pro t Mana
Approved by:
Cityngineer
Working days subtracted: 0
Percent change in Contract to date -0.39%
Date City,Project Manager Date
Date Cit ,Mana er, required for Change Orders -$24 999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and acgged to b PAL General Engneering, Inc.:
r
/co '• L� ater
Note to Contractor: If you do no agree with this Cha Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
*» CALIFORNIA .K
NATIONAL C��`1
ta( 1) j
INCORPORAT6p --
8TH STREET SMART GROWTH REVITALIZATION CHANGE ORDER NO. 3, Attachment "A"
Specification #12-13
DATE: December 17, 2013
WORK PERFORMED BY: PAL General Engineering, Inc.
DESCRIPTION OF WORK: Removing Preformed Thermoplastic from Bid Item 38
MATERIALS
Unit
QtY
Rate
Total with Tax
Preformed Themoplastic (See Attached)
41,813.12
Bulk Thermoplastic
Ibs
7,175.00
1.80
13,948.20
Sub -Total Material Difference:
Markup (5%):
TOTAL COST DIFFERENCE:
$ 27,864.92
$ 1,393.25
$ 29,258.17
To IBRENT BARTON
Flint
TRADING INC?
115 TODD COURT
THOMASVILLE, NC 27360
S 24280
O STATEWIDE STRIPES, INC. / CA
L P O BOX 600710
D SAN DIEGO, CA 92160-0710
T
FOB: DESTINATION
1
Fax or Email: 858-560-01 5 8
Price Quote
Phione: (336) 475-6600
Fax: (336) 475-7900
entail: sales@flinttrading.com
Page 1
Quote # 00124980
Quote Date 6/3/2013
s 24280-1
H STATEWIDE STRIPES,INC/CA
1 7320 MISSION GORGE ROAD
P SAN DIEGO, CA 92190
T
0
Quote Amount 41,813.12
SLS1 SLS2 cssS DESIRED SHIP DATE SHIP NUMBER
88
LRW 06/03/2013
TERMS DESCRIPTION CUSTOMER PO NO SHIP VIA
Nct 30 Days
BRENT BARTON DESTINATION
ITEM ID TX CL UNITS ORDERED SHIPPED UNIT PRICE EXTENSION
D 1 EACH 1.000000 0.000000 0.00 0.00
FOB SHIPPING POINT
TERMS NET 30
QUOTE VALID FOR 30 DAYS
QUOTE DATE 6-3-2013
QUOTED BY LOUISA WOOD
D3 0 EACH 1.000000 0.000000 0.00 0.00
TERMS AND CREDIT LIMITS
ARE SUBJECT TO VERIFICATION AND APPROVAL
8431064 0 PACK 50.000000 0.000000 121.73 6,086.50
PM125VVH 030' BD 12" WHITE LINE
8430566 0 PACK 120.000000 0.000000 121.65 14,598.00
PM125WH Q15' BD 24" WHITE LINE
PMK8130103A 0 EACH 4.000000 0.000000 347.55 1,390.20
PM125WH 01 BD 16x20 RXR KIT
8130128 0 PACK 3.000000 0.000000 199.73 599.19
PM125WH 01 BD 8' "KEEP" FHWA
8130129 0 PACK 3.000000 0.000000 210.68 632.04
PM125WH Q1 BD 8' CLEAR" FHWA
8130110 0 PACK 2.000000 0.000000 180,00 360.00
PM125WH Q1 BD 8"`SLOW"FHWA
8110101 0 PACK 2,000000 0.000000 282.53 565.06
PM125WH Q1 BD 8' "SCHOOL" FHWA
To:
BRENTBARTON
F t
TRADING INC
115 TODD COURT
THOMASVILLE, NC 27360
s 24280
O STATEWIDE STRIPES, INC. / CA
L P O BOX 600710
D SAN DIEGO. CA 92160-0710
T
0
FOB: DESTINATION
Fax or Email: 1 858-560-0158
Price Quote
Phione: (336) 475-6600
Fax: (336) 475-7900
eMail: sales@flinttrading.com
Page 2
Quote # 00124980
Quote Date 6/3/2013
s 24280-1
H STATEWIDE STRIPES,TNC/CA
1 7320 MISSION GORGE ROAD
P SAN DIEGO, CA 92190
T
0
Quote Amount 41,813.12
SLS1 SLS2 csss DESIRED SHIP DATE SHIP NUMBER
88
LRW 06/03/2013
TERMS DESCRIPTION CUSTOMER PO NO SHIP VIA
Net 30 Days
BRENT BARTON DESTINATION
ITEM ID TX CL UNITS ORDERED SHIPPED UNIT PRICE EXTENSION
8130107 0 PACK 2.000000
PM125WH Q1 BD 8"'X-ING" FHWA
8130104 0 PACK 10.000000
PM125WH Q1 BD 8"'STOP" FHWA
8231002 0 PACK 3.000000
PM125WH Q10 BD 2'x3' SHRKS TEETH
892302464L.HS 0 PACK 20.000000
PM90WH Q2 VG 39x111"LFT BIKE/CHEVRN
2 each per package
8330241L 0 PACK 20.000000
PM125WH Q2 BD 8' LFT TURN ARW
8330157NB 0 PACK 2.000000
P✓1125WI I Q1 NB 17'6'REV LN REDCT ARW
8330142NB 0 PACK 1.000000
PM125WH 01 NB 12'9" COMBII ARW
We appreciate your business,
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
189.53 379.06
180.00 1,800.00
156.85 467.55
294.15 5,883.00
253.58 5,071.60
327.15 654.30
229.35 229,35
TAXABLE NONTAXABLE FREIGHT SALES TAX MISC TOTAL
38,715.85 0.00
0.00 3,097.27
0.00 41,813.12
TOTAL DUE 41,813.12
CALIFORNIA
INCOAPORATSD
8TH STREET SMART GROWTH REVITALIZATION
Specification No. 12-13
Contractor: PAL General Engineering, Inc.
CHANGE ORDER NO. 4
December 17, 2013
Reason/Purpose for this Change Order:
This change order is to install new temporary railroad striping at Harbor Drive and 8th street train tracks because
there is currently no striping at this location.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor shall install new temporary railroad striping at Harbor Drive and 8th Street train tracks. The lump
sum change order price includes all labor, materials, equipment and traffic control required to complete this work.
The agreed upon price for all costs associated with this work is $1,622.25, see Attachment "A" for cost
breakdown.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
Submitted by:
Approved by:
3,978,336.35
(15,418.18)
3,962,918.17
1,622.25
$ 3,964,540.42
Working days subtracted: 0 Percent change in Contract to date -0.35%
City Project Manager
Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by PAL General Engneering, Inc.:
Name:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
f
CALIFORNIA -e
NATIONAL CITy.
1HCpRPORATFO
8TH STREET SMART GROWTH REVITALIZATION CHANGE ORDER NO. 4, Attachment "A"
Specification #12-13
DATE: December 17, 2013
WORK PERFORMED BY: PAL General Engineering, Inc.
DESCRIPTION OF WORK: Install new signage and striping at Harbor Drive train tracks
MATERIALS AND LABOR
Unit
Qty
Rate
Total
Install new signage and striping on A Avenue.
LS
1.00
1,545.00
1,545.00
Markup (5%):
TOTAL COST:
$ 77.25
$ 1,622.25
-0— CALIFORNIA —�
NATIONAL CITY
INCORPOAATAII
8TH STREET SMART GROWTH REVITALIZATION
Specification #12-13
Contractor: PAL General Engineering, Inc.
CHANGE ORDER NO. 5
December 27, 2013
Reason/Purpose for this Change Order:
Improvements are needed for stripings, markings, removals and signs on AAvenue between National City
Boulevard and 12th Street to increase the number of available parking spaces.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor shall install new striping, markings, removals and signs on AAvenue between National City
Boulevard and 12th Street in accordance with the attached drawing. The lump sum change order price includes
all labor, materials, equipment and traffic control required to complete this work. The agreed upon price for all
costs associated with this work is $7,019.25, see Attachment "A" for cost breakdown.
Original Contract Amount $ 3,978,336.35
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount ... ... $ 3,971,559.67
Working days added: 0
(13,795.93)
3,964,540.42
7,019.25
Working days subtracted: 0
Submitted by:
Approved by:
ngineer
iY
Date
Percent change in Contract to date -0.17%
City Project Manager Date
c /2.1/
Date
City Manager, required for change orders>$24.999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by PAL General Engineering, Inc.:
Name:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
- CALIFORNIA
NATIONAL CITY
naa
1NCORPORAR80
8TH STREET SMART GROWTH REVITALIZATION CHANGE ORDER NO. 5, Attachment "A"
Specification #12-13
DATE: December 27, 2013
WORK PERFORMED BY: PAL General Engineering, Inc.
DESCRIPTION OF WORK: Install new signage and striping on A Ave
MATERIALS AND LABOR
Unit
Qty
Rate
Total
A Ave Improvements. Striping, Markings, Removals and Signs.
LS
1.00
6,685.00
6,685.00
Markup (5%):
TOTAL COST:
$ 334.25
$ 7,019.25
SURVEYOR: SAMPO
c
0
ce
CONSTRUCTION
TELEPHONE
UTILITY DEPARTMENTS
4
DATE STARED:
a
DAS MAPS, HUEY MITCHELL
0
DATE COMPLETED:
^ N
m
w w
o r,
V N
a a
U �
t/1 w
COX COMMUNCATIC
AT&T SUBSTRUCTU
0
m
ENGINEERING DEPARTMENT
0
0
S
Q - 4" WHITE
STRIPE)"=
4" WHITE tl L=55''
STRIPE, L43O
SIGNING AND STRIPING NOTES
1. ALL REFERENCES TO THE 'CITY' SHALL EXPUCITLY REFER TO THE "CITY OF NATONA_ CITY".
2. INSTALLATION OF ALL SIGNS, STRIPING, PAVEMENT MARKINGS, AND PAVEMENT MARKERS SF ALL BE THE RESPONSIBIUTY OF THE
CON !RAC TOR AND SHALL CONFORM TO THE MOST RECENT EDITION OF THE FOLLOWING STANDARD PUNS AND SPECIFICATIONS:
A. CAUFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA-MUTCD).
B. STATE W CAUFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD PLANS
C. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD SPECIFICATIONS
D. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREENBOOK"), INCUOING ALL CURRENT SUPPLEMENTS.
3. ALL SIGNS. STRIPING. PAVEMENT MARKINGS, AND PAVEMENT MARKERS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER PRIOR
TO INSTALLATION AND/OR REMOVAL.
4. CONTRACTOR SHALL SUBMIT PRODUCT MANUALS AND SPECIFICATIONS FOR THERMOPLASTIC MATERIALS AT THE PRE -CONSTRUCTION
MEETING FOR APPROVAL BY ThE CITY ENGINEER.
5. CONTRACTOR SHAI I. NOTIFY THE CITY ENGINEER OR HIS REPRESENTATIVE A MINIMUM OF 1 WEEK IN ADVANCE TO SCHEDULE A FIELD
'WALK THROUGH" TO "MARK -OUT" ALL SIGNS SCHEDULED FOR REMOVAL, REPLACEMENT, AND/OR RELOCATION, AND TO "MARK -OUI"
THE LOCATIONS FOR PLACEMENT OF NEW AND/OR RELOCATED SIGNS.
6. CONTRACTOR SHALL CLEARLY "MARK -OUT" THE LOCATIONS OF AD_ NEW STRIPING AND PAVEMENT MARKINGS PRIOR TO INSTALLATION.
THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER OR HIS REPRESENTATIVE A MINIMUM OF 1 WEEK IN ADVANCE TO SCHEDULE AN
INSPECTION OF THE "MARK -OUTS".
7. CONTRACTOR SHALL REMOVE ALL CUNEUC :NO 5WRIPING AND PAVLMLN I MARKINGS BY "WATERBLASTING". ALTERNATIVE METHODS MUST
BE PRE -APPROVED BY THE CITY ENGINEER. ANY DEBRIS SHALL BE PROMPTLY REMOVED BY ThE CONTRACTOR.
8. CONTRACTOR SHALL REMOVE ALL CONFLICTING RAISED PAVEMENT MAR:(ERS PRIOR TO STRIPING. PAVEMENT THAT IS DAMAGED DUE TO
THE REMOVAL OF MARKERS SHALL BE IMMEDIATELY REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER.
114117
DIAL
BEFORE
YOU INC
TOLL FREE -6D}227-260E
A PU9l1C SETMI£ BY
UNDERGROUND SERFAGE ALERT
9. SURFACES WHICH ARE TO RECEIVE NEW STRIPING, PAVEMENT MARKINGS, AND PAVEMENT
MARKERS SHALL BE CLEANED CF ALL DIRTY AND LOOSE MATERIALS PRIOR TO
INSTALLATION.
10. ALL LIMIT LINES/STOP BARS, AND CROSSWALK LINES SHAH HE THFRMOPI AST:, UNLESS
OTHERWISE SPECIFIED.
11. ALL TRAFFC STRIPES 6 INCHES 0R LESS IN WIDTH SHALL BE INSTALLED WITH TWO
COATS OF PAINT. THE FIRST COAT OF PAINT SHALL BE DRY BEFORE APPLICATION OF
THE SECOND COAT PER THE LATEST STANDARD SPLCILICAIION.
GRAPHIC SCALE IN FEET
0 20 40 80
GRAPHIC SCALE IN FEET
0 5 10 20
12. FOR ALL ROADWAY CENTERLINES REQUIRING DOUBLE YELLOW TRAFFIC STRIPING, THE C0N1RAC FOR SHALL CONCURRENTLY PAINT A
3-INCH WIDE BLACK STRIPE BETWEEN THE TWO 4-INCH WIDE YELLOW STRIPES.
13.ALL LIMIT LINES/STOP BARS SHALL BE LOCATED AT THE PROLONGATION OF THE CENTER DELTA OF THE CURB RETURN OR BEHIND
THE PEDESTRIAN ACCESS RAMP, UNLESS OTHERWISE SPECIFIED. IF A STRIPED CROSSWALK EXISTS, THE LIMIT LINE/STOP BAR SHALL
BE LOCATED 4 FEET IN ADVANCE OF TIE CROSSWALK.
14.ALL STRIPING SHALL BEGIN AND TERMINATE AT QUARTER DELTA OF THE CURB, OR BACK OF THE LIMIT LINE/STOP BAR, UNLESS
OTHERWISE SPECIFIED.
15. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC, UNLESS OTHERWISE SPECIFIED.
I6.'STOP' PAVEMENT MARKINGS SHALL BE INSTALLED 8 FEET IN ADVANCE OF THE JMIT LINE/STOP BAR, CONSISTENT WITH THE LATEST
EDITION OF THE CALIFORNIA MUTCD
17. CONTRACTOR SHALL INSTALL BLUE RETROFLECTIVE RAISED PAVEMENT MARKERS TO DESIGNATE THE LOCATION OF ALL FIRE
HYDRANTS, CONSISTENT WITH THE LATEST EDITION OF THE CALIFORNIA MUTCD.
18. STANDARD STRIPING AND PAVEMENT MARKER DETAILS AND DIMENSIONS/SPACING FOR PAVEMENT MARKINGS SHALL CONFORM TO THE
LATEST EDITIONS OF THE CALIRANS STANDARD PLANS AND CALIFORNIA MUTCD.
19.APPLICATON OF TRAFFIC STRIPES, PAVEMENT MARKINGS. AND PAVEMENT MARKERS SHALL CONFORM TO THE LATEST EDITION OF THE
CALTRANS STANDARD SPECIFICATIONS.
20.ALL SIGNS PURCHASED AND INSTALLED BY THE CONTRACTOR SHALL CONFORM TO THE STANDARDS PRODDED IN THE LATEST EDITION
OF THE CALIFORNIA MUTCD, INCLUDING SIGN SIZE. SHAPE, COLOR, SYMBOLS, RETROREFLECTIVITY, VERTICAL AND LATERAL MOUNTING
OFFSETS ECT. ALL SIGN FACE REFLECTIVE SHEETS SHALL BE HIGH INTENSITY GRADE WITH A CLEAR PROTECTIVE OVERLAY FILM (I. E.
ANTI-GRAHEITI COATING).
21.ALL PEDESTRIAN CROSSING SIGNS, PEDLSIRIAN ADVANCED WARNING SIGNS, AND SUPPLEMENTAL PLAQUES SHALL BE FLUORESCENT
GREEN IN COLOR.
22.ALL SIGN POSTS SHALL BE 2"-SQUARE. PERFORATED GALVANIZED STEEL WITH BREAK -AWAY BASE, PER CITY OE NATIONAL CITY
STANDARD DRAWING N0. 112-S-B, UNLESS OTHERWISE SPECIFIED.
23.ALL SIGN POSTS SHALL BE INSTALLED 2 FEET BEHIND THE FACE OF CURB. UNLESS OTHERWISE SPECIFIED.
24.ALL RAISED MEDIAN NOSES SHALL BE PAINTED YFII.OW.
25.CONTRACTOR IS RESPONSIBLE FOR REPAINTING ALL CURB MARKINGS WITHIN THE PROJECT LIMITS.
26.CONTRACTOR SHALL NOTIFY THE CITY ENGINEER 0R HIS REPRESENTATIVE A MINIMUM OF 1 WEEK PRIOR TO COMPLETION OF ALL
SIGNING AND STRIPING WORK TO SCHEDULE A FINAL INSPECTION.
I✓
LEGEND
(XX')
EXISTING LANE WDTH
XX'
NEW LANE WT07H 0R LENGTH OF NEW STRIPING
WHITE THERMOPLASTIC STOP PAVEMENT MARKING PER
CALLER ANS STANCARD PLAN A240
INSTALL STRIPING DETAIL PER LATEST CA-MUTCD AND
CALTR ANS STANDARD PLANS
-8.WHITE
THERMOPLASTIC TYPE I (10') ARROW PER CALTRANS
STANDARD PLAN A248
X
PROPOSED FENCE
— - - —
RIGHT-OF-WAY
SIGNING AND STRIPING NOTES
U
MATCH EXISTING STRIPING
(T
2
REMOVE EXIS MG STRIPING OR PAVEMENT MARKING BY WATER
BLASTING
❑3
INSTALL 45' ANGLED PARKING PER DETAIL ON THIS SHEET
4IPMJ
FURNISH AND INSTALL WHITE THERMOPLASTIC "STOP' PAVEMENT
MARKING PER CALTRANS STANDARD PLAN A24D
PANISH VEMENT NT NMA KINGLL WHITE PLR CALTRANSOSTANDARD PLAN ARROW
51PMI
®
FURNISH AND INSTALL 4" WHITE CHEVRON MARKINGS SPACED 5' ON
CEN'ILH AT A 45' ANGLE. CHEVRON MARKINGS MUST MEET THE
REQUIREMENTS OUTLINED IN SECTION 38.24 OF THE LATEST MUTCD
INSTALL 12" WHITE THERMOPLASTIC IIMIT LINE LINE PER CALTRANS
STANDARD PLAN RSP A24E
Q
10
FURNISH PARALLEL PARKING MARKINGS PER SECTION 3B.19
'PARKING SPACES MARKING" OF THE LATEST CA-MUTCD
D
CONTRACTOR TO REMOVE EXISTING STRIPING OR PAVEMENT MARKING
BY WATER BLASTING WITHIN AREA SHOWN IN DETAIL A
m
INSTALL 90' ANGLED PARKING PER DETAIL ON THIS SHEET
m
INSTALL DISABLED PARKING STALL PER 50RSD M-27A
®
INSTALL DISABLED PARKING STALL PER SDRSD M-276
CONSTRUCTION NOTES
O1
CHAIN LINK FENCE PER SDRSD M-6 TO BE INSTALLED BY OTHERS
CHAIN LINK DOUBLE SWING GATE PER SDRSD M-5 TO BE INSTALLED
BY OTHERS
O
PRIVACY SLATS TO MATCH EXISTING COLOR AND TYPE TO BE
INSTALLED BY OTHERS
I12. 5' (TIP)
CURB
4Ei
22
' WHITE PAINT
(TYP)
45 ANGLE PARKING STALL DETAIL
NOT TO SCALE
9' (TYP)
CURB
O
4" WHITE PAINT
(TYP)
90' PARKING STALL DETAIL
NOT TO SCALE
C-02
56.1w
PLANS FOR THE IMPROVJAENTS OF:
NATIONAL CITY PU&IC WOFK8 RELOCATION
IMPROVEMENT PLAN
CITY OF NATIONAL CITY
ON BEHALF OF Rk MY OF NATIONAL CIIV. AS ME 061GNQ OF
ME CITY ENNEER. I NAVE PEALIVED MESE PLANS N. BY
ELGW DAVEMDETERMINED MAT1NESE PIONS ARE CONSISTENT ICIBITH
L
NEV.. QIGNEMING D£9GN STANDARDS mu FNNGIHEE
DRDIWALY E%EACSED BY PROFESSIONAL SIGNERS PRACIICNG
UN3R SMI145 CIRCUMSTANCES.
(ENGINEERS NAME AND ROE})
S
510 ENGINEER DALE
PROJECT No. 095811000
SPEC 45145
SHEET C2 GF O2 GLEBES
XXXXXX D
0
U
O
LLI
CC
CD
CC
0
U
J
U
J
0
Z
F
0
CO
-J
1
rI
U
J
Q
Z
0
Z
O
U
I
J
0
W
0
a.
0
Z
m
0
«- CALIFORNIA -41.-
NATIONNAL CITY
oirr
Rpo
TNCORPORAT..
8TH STREET SMART GROWTH REVITALIZATION
Specification #12-13
Contractor: PAL General Engineering, Inc.
CHANGE ORDER NO. 6
January 16, 2014
Reason/Purpose for this Change Order:
The Resident Engineer reviewed the existing soil conditions and recommends that #4 rebar 24" on center both
directions be added to the concrete section for the bus stop pads to strengthen the tensile strength to handle the
expected increased loads.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall install #4 rebar 24" on center both directions into the
bus pads at all six locations along 8th Street. The lump sum change order price includes all labor, materials, and
equipment required to complete this work. The agreed upon price for all costs associated with this work is
$1,093.91 per bus pad for a total of $6,563.46 for all 6 bus pads, see Attachment "A" for cost breakdown.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $
$ 3,978,336.35
(6,776.68)
3, 971, 559.67
6,563.46
Working days added: 0
Working days subtracted: 0
Percent change in Contract to date -0.01 %
3,978,123.13
Submitted by:
Pr. act Mana. -r
Date
I/2-1 t4
Resident Engineer Date
Approved by:
...
Cit ngineer
1../4e4 ..........
Date
_...._.................._................................................._................_ ..
City Manager, required for Change Orders '524,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by PAL General Engineering, Inc.:
( ){ L.
Name:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
Date
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
A Pa
+- CALIFORNIA .K
NATIONAL CITY
1 nRPa
tNCORPORAT80
8TH STREET SMART GROWTH REVITALIZATION
Specification #12-13
CHANGE ORDER NO. 6, Attachment "A"
DATE: January 16, 2014
WORK PERFORMED BY: PAL General Engineering, Inc.
DESCRIPTION OF WORK: Installing #4 Rebar into Bus Pads
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
Laborer
Hour
4.00
53.15
212.60
2)
Laborer
Hour
4.00
53.15
212.60
Sub -Total Labor:
$ 425.20
Labor Burden (13%):
$ 55.28
Labor Markup (20%):
$ 85.04
TOTAL LABOR:
$ 565.52
MATERIALS
Unit
Qty
Rate
Total
1)
Rebar
EA
48.00
6.35
Sub -Total Materials:
Materials Markup (15%):
TOTAL MATERIALS:
304.80
$ 331.47
$ 49.72
$ 381.19
EQUIPMENT
Unit
Qty
Rate
Total
1)
Utility Truck
Hour
4.00
32.00
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL MATERIALS:
128.00
$ 128.00
$ 19.20
$ 147.20
Total Labor: $ 565.52
Total Materials: $ 381.19
Total Equipment: $ 147.20
TOTAL: $ 1,093.91
6 BUS PADS
GRAND TOTAL: $ 6,563.46
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
PAL GENERAL ENGINEERING
Change Orders #3, #4, #5 and #6
8th Street Smart Growth Revitalization
Judy Hernandez (Engineering) Forwarded Copy
of Change Orders to PAL General Engineering