HomeMy WebLinkAbout2013 CON PAL General Engineering - 8th Street Smart Growth Revitalization - Change Order #2NOTE TO FILE
02-12-14
IN THE MATTER OF: Change Order #2 for the 8th Street Smart
Growth Revitalization — PAL General Engineering, Inc. Please note
the following:
ONLY A FULLY EXECUTED COPY OF THE CHANGE ORDER
WAS FILED WITH THE OFFICE OF THE CITY CLERK
ORIGINATING DEPARTMENT: _ CDC Housing & Grants
_ City Attorney _ Human Resources
City Manager MIS
_ Community Svcs. _ Planning
X Engineering _ Police
Finance Public Works
Fire Nutrition Center
NTF
8TH STREET SMART GROWTH REVITALIZATION
Specification No. 12-13
Contractor: PAL General Engineering, Inc.
'Reason/Purpose for this Change Order:
CHANGE ORDER NO.2
November 11, 2013
This change order will allow the Contractor to purchase the anchor bolts for all the street lighting foundations for
the project so that the city does not have to procure the items on its own.
The City of National City and Contractor agree to the following change to the original Contract:
;The Contractor and the City agree to have the Contractor procure the anchor bolts for all the street lighting
;foundations. The Contractor shall be compensated for the purchase as a lump sum price based on the itemized
spreadsheet, Attachment "A".
Original Contract Amount $ 3,978,336.35
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
3,978,336.35
13,839.99
New contract amount $ 3,992,176.34
Working days added: 0
Submitted by
r.t Marla r
Approved by:
ininee
ltv npineer
Working days subtracted: 0
Percent change in Contract to date 0.35%
Date
Date City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and armed to by PAL General Engneering_, lnc•
'lila/ 1,3
Name: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
8TH STREET SMART GROWTH REVITALIZATION
Specification #12-13
CHANGE ORDER NO. 2, Attachment "A"
DATE: November 11, 2013
WORK PERFORMED BY: PAL General Engineering, Inc.
DESCRIPTION OF WORK: Purchase of Anchor Bolts for Street Lights
MATERIALS
Unit
Qty
Rate
Total
1
Anchor Bolts for LT1 Vehicle & Combo Ped Light
1
13.00
145.00
1,885.00
2
Anchor Bolts for LT1-2 Twin Vehicle Light
1
5.00
145.00
725.00
3
Anchor Bolts for Single Acorn LT3-12' Pole
1
38.00
84.00
3,192.00
4
Anchor Bolts for Twin Acorn on 16' Pole
1
17.00
145.00
2,465.00
5
Anchor Bolts for LED Lights only for Poles
1
8.00
84.00
6
Anchor Bolts for LTI W LED Project Light
580.00
1
4.00
145.00
580.00
7
Anchor Bolts for 23' Pole Only W Deco Base
1
8.00
145.00
1,160.00
Sub-Tota Materials:
$ 10,679.00
Tax Total:
$ 854.32
Subcontractor Materials Markup
(15%):
$ 1,730.00
Prime Contractor Materials Markup
(5%):
$ 576.67
TOTAL
COST:
$ 13,839.99
k/1)kAi AT p.'?
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
PAL GENERAL ENGINEERING
Change Order #2
8th Street Smart Growth Revitalization
Judy Hernandez (Engineering) Forwarded Copy