1726 WILSON AVENUE TENANT AND SITE IMPROVEMENTS
Specification No. 13-06
Contractor: EC Constructors, Inc.
CHANGE ORDER NO. 1
January 21, 2014
Reason/Purpose for this Change Order:
After inspection of the Shop Building on site, it was determined that the door, frame and hardware located at the
South East Corner of the building is in poor condition. Additionally, it was also determined that Fire Labels on the
exterior doors and frames on the east side of the Shop Building must be placed in order to comply to the General
Requirements of Fire Department of the city.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall remove and replace the damaged door, frame and
hardware of the Shop Building located in 1726 Wilson Avenue site as well as the installation of the Fire Labels on
Exterior Doors and Frames on the East side of the Shop Building. The lump sum change order price includes all
labor, materials, and equipment required to complete this work. The agreed upon price for all costs associated
with this work is $2,465.03 in total.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Worki g da' dded: 0
tti?d
Approved by:
Vorking days subtracted: 0
¢2ot �-
ate
ineer Date
831, 515.00
831, 515.00
2,465.03
Percent change in Contract to date 0.30%
833,980.03
required for Change Orders >$24 999 Date Cit Manager,
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as describe. =bove at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associatewith the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, 1. any at there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated here)
Accepted and .'Tree ,Ito by EC Constructors, Inc.:
Name: j//4r
Note to 'O'er
and y. t- •
Ori
.../y_..._..
Date
f you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
ceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
a s: City Clerk, Contractor cc: Engineering project file, Project Manager
Nationa City :ou evar., Nationa City, A • 1 5
eep one .1• .-4 :r'
+}-w CALIFORNIA
NATIONALx
rNCOR,PORATED
1726 WILSON AVENUE IMPROVEMENTS CHANGE ORDER NO. 1, Attachment "A"
Specification #13-06
DATE: January 22, 2014
WORK PERFORMED BY: EC Constructors, Inc.
DESCRIPTION OF WORK: Removal and Replacement of Damaged Door, Frame, and Hardware
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
1)
Laborer
1) Door, Frame, Hardware
Hour
8.00
48.38
387.04
Sub -Total Labor:
Labor Surcharge (12%):
Labor Markup (20%):
TOTAL LABOR:
Unit
Total
Qty
1.00
Rate
1,540.17
$ 46.44
$ 86.70
Total
1,540.17
2 Fire Label on Ext. Doors
Total
1.00
151.00
151.00
Unit
Hour
Qty
Rate
$ 1,691.17
Total
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
GRAND TOTAL:
$ 2,465.03
Sub -Total Materials:
Materials Markup (15%): 253.68
TOTAL MATERIALS:
$ 387.04
CALIFORNIA �-+t
mamba',on.
ainv
INCoRpoRATgo
1726 WILSON AVENUE TENANT AND SITE IMPROVEMENTS
Specification No. 13-06
Contractor: EC Constructors, Inc.
CHANGE ORDER NO. 2
February 3, 2014
Reason/Purpose for this Change Order.
Upon observation, it was determined that the interior walls of the Office Building will need to be repainted. This
change order entails the cost for the work for painting the walls.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall paint and make minor wall patch work for the interior
of the Office Building on site. The work for this Change Order will include the preparation of the walls (minor
patch work). Then, pretreat the walls for painting in accordance with the paint manufacturer's requirements and
apply paint for full coverage. The agreed upon lump sum price for all costs associated with this work is
$5,185.85.
Original Contract Amount $ 831,515.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
2,465.03
833,980.03
5,185.95
Work. + da s added: 0 king days subtracted: 0 Percent change in Contract to date 0.92%
839,165.98
Date jCity Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accep ed and agreed to by EC Constructors, Inc.:
2.
Name: D e
Note to Contractor: I u do not agree with is Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You mu comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
4** CALIFORNIA +-{+-
I
0a
INCORPORATED
1726 WILSON AVENUE IMPROVEMENTS CHANGE ORDER NO. 2
Specification #13-06
DATE: February 3, 2014
WORK PERFORMED BY: EC Constructors, Inc.
DESCRIPTION OF WORK: Re -painting of the Interior Walls for Office Building
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Rate
Total
1)
Wall Painting
Total
1.00
4,939.00
4,939.00
$ 4,939.00
Sub -Total Materials:
Prime Markup for Sub (5%):
TOTAL MATERIALS:
$ 246.95
@54,1
GRAND TOTAL:
$ 5,185.95
�* CALIFORNIA *++
d to by EC Constructors, Inc.:
Na ,1Aeitt TJ,,L,. "bitivfl at- - Date y�Y
i Contractor: If you do not agree with this hange Order you may be directed to proceed with this work under the terms of the ntr ct
d you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
riginals: City Clerk, Contractor
NATIONAL CIT
aai3i
r vcoRPORA'r'ED
1726 WILSON AVENUE TENANT AND SITE IMPROVEMENTS
Specification No. 13-06
Contractor: EC Constructors, Inc.
Reason/Purpose for this Change Order:
During the initial trench work for the 1726 Wilson Avenue site, the contractor has discovered two 17'x17'x24'
receptors in the existing floor drains in the shop and wash rack area of the Maintenance Building. As seen per
attached Exhibit 1, the receptors contain unknown material that was determined to be 25-50% Oil and 50-75%
water by ACT (Advanced Chemical Transport) after testing. ACT will then remove and transport the tanks
containing the material to an approved disposal location. This change includes the cost for generating a waste
profile for the material as well as its safe transportation to a disposal site.
CHANGE ORDER NO. 3
February 3, 2014
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Subcontractor shall generate an accurate waste profile for the
discovered fluid material in the Shop Building. This Change Order will also include the cost for cleaning,
removing, and transporting the material to an approved disposal site. The waste on site shall be delivered and
disposed to a designated facility in 6133 Edith Blvd NE, Albuquerque, NM 87107. The lump sum change order
price includes all labor, materials, and equipment required to complete this work. The agreed upon price for all
costs associated with this work is $2,895.59 in total.
Original Contract Amount $ 831,515.00
Net change by previously authorized Change Orders 7,650.98
Subtotal .......................... 839,165.98
Amount of this change order 2,895.59
New cont = t amo t
Working rking days subtracted: 0 Percent change in Contract to date 1.27%
Submitt
VI
Project
Approved by:
44f2c
te
/l4
$ 842,061.57
City ngineer / Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs asso fed with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, pr. •t, et d that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated
Accepted
/ 1243 National City Boulevard, National City, CA 91950
t.
cc: Engineering project file, Project Manager
Terephone (619) 336-4380
40.* CALIFORNIA.I-0
NATIONS airy
C- INCORPORATED
1726 WILSON AVENUE IMPROVEMENTS
Specification #13-06
DATE: February 3, 2014
CHANGE ORDER NO. 3
WORK PERFORMED BY: EC Constructors, Inc.
DESCRIPTION OF WORK: Clean, remove and dispose oily waste from two existing floor
receptors in the maintenance building
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Rate
Total
1)
Removal of Waste Material
Total
1.00
2,757.70
2,757.70
$ 2,757.70
Sub -Total Materials:
Prime Markup for Sub (5%):
TOTAL MATERIALS:
$ 137.89
GRAND TOTAL:
$ 2,895.59
CHANGE ORDER NO. 3, EXHIBIT #1
1726 WILSON AVENUE TENANT AND SITE IMPROVEMENTS
SPECIFICATION NO. 13-06
Figure 1: Oil Receptor that has a size of 17'x17'x24' discovered in the existing floor
drains inside the shop and wash rack area
Figure 2: The Oil Receptor was found containing 25-50% Oil and 50-75% Water
ACT
6133 Edith Blvd. NE
Albuquerque, NM 87107
Phone: (505) 349-5220
Fax: (505) 344-7986
GENERATOR WASTE PROFILE SHEET
A. GENERATOR INFORMATION Profile Number: ACT27261
Generator Name: City of National City Generator US EPA ID: CAC002758961
Mailing Address: 1726 Wilson Avenue Phone:
National City, CA 91950 Fax:
Site Pick-up Address: 1726 Wilson Avenue Email:
National City , CA 91950
Technical Contact: Vinnie Aguelo Title: MAIN CONTACT
Name of Waste OILY WATER
Process Generating CLEANUP OF SUMPS
NAICS CODE 561790
Form Code:W205 Source Code: G09
B. PHYSICAL CHARACTERISTICS OF WASTE AT 25C OF 77F
Physical State: Liquid
PH: 6 - 8
Color: Varies Clarity: NA
Specific 1.0
Gravity:
Phase Separation Two Odor: none
Number of Layers:
Flash Point >200 BTU Value: <2000
(F):
C. Chemical Composition / UHC's Range
BASED UPON: ANALYTICAL(INCLUDED) ,, GENERATOR KNOWLEDGE
Oil
Water
25 - 50
50 - 75
D. METALS
Total (PPM) EP Toxicity (mg/I)
NA Arsenic:
NA Barium:
NA Cadmium:
NA Chromium:
NA Lead:
NA Mercury:
NA Chromium, Hexavalent
NA Selenium:
NA Silver:
NA Copper:
NA Nickel:
NA Zinc:
NA Thallium:
F. Shipping Information:
DOT Hazardous Material NO Exempted YES
Proper Shipping Name: Non-RCRA Hazardous Waste Liquid (Oily Water)
Hazard Class:
ID #:
PG:
Anticipated Volume (Units): 2 DM
Per: ONE-TIME
E OTHER COMPONENTS
OXIDIZER: NA REACTIVE SULFIDES PPM NA
EXPLOSIVE: NA REACTIVE CYANIDES PPM NA
SHOCK SENSITIVE: NA WATER/AIR REACTIVE NA
11 RES: NA THERMALLY UNSTABLE NA
PYROPHORIC: NA TSCA REG PCB WASTE: NA
RADIOACTIVE: NA COMPRESSED GASSES: NA
EXEMPT RAD: NA CERCLA/SUPERFUND: NA
ETHIOLOGI CAL: NA PESTICIDE NA
MAUFACTUR ING WASTE:
HALOGENATED ORGANIC COMPOUNDS PER 40 CFR 268, APPENDIX III
DEBRIS NA <500 PPM VOC as generated
Subject to NESHAP Regulations NA
US EPA Hazardous Waste
US EPA Hazardous Waste
Codes:
223;
G. Special Handiling Instructions:
H. GENERATOR'S CERTIFICATION:
I hereby certify that all information in this and all the attached documents is complete and accurate, and that all known or suspected hazards have been disclosed. I f urther certify
that any samples submitted with this profile are representative of the waste to be shipped and are taken in accordance with SW 846 or other approved procedures. I agree to notify
Adavanced Chemical Treatment in writing when the process generating this waste stream changes or when I have reason to believe the data contained herein is riot complete and
accurate.
Signature Title Date
Print Nana:
Please print or type. (Form designed for use on elite (12-pitch) typewriter.
J4 GENERATOR r
UNIFORM HAZARDOUS
WASTE MANIFEST
1. Generator ID Number
(„A tt(1:'7,fla11 1
2. Page 1 of
1
3. Emergency Response Phone
1,(113iy,7firi 7`r"ct
4. 011749010 Manifest Tracking Number
JJK
5, Generator's Name and Maili g Address Generator's Site Address (if different than mailing address)
City of National Gib/ t L , , 0 t ; w
rT vY ortrAvoymf :. f .,
Generators one: (C',i4Fri�S:>31tit3 l
6. Transporter 1 Company Name - U.S. EPA ID Number
Atlainr.rAl (;tar)«ial "Cr<t s ii 11n, tS\1 I t,,MROO(Ka-' 1!
7. Transporter 2 Company Name U.S. EPA ID Number
I
8. Designated Facility Name and Site Address U.S. EPA ID Number
AtitAwicutt Chemical frt: Tit nt
6133 Etitth til',ci NE tvrvfi «MJ I1 t x"tri27
Athi VTropYitsch, NM 8 / 1I)/
Facility's Phone: 5t1.Fx.ixrs,ti;?':fi3
9a,
9b. U.S. DOT Descnption (including Proper Shipping Name, Hazard Class, ID Number,
10. Containers
11. Total
12. Unit
HM
and Packing Group (if any))
No.
Type
Quantity
Wt.Nol.
13. Waste Codes
1.
Nt4; R('I::A ti,az;atrttc itIN Vk%iht - I.iafROI 1(Nf . 4% o tb
2.
3.
4.
14. Special Handling Instructions and Additional Information
Pt. trje''r1 tt'eo't'far 4:94Tt' fit te“tytf:rrl # 1 443,MY
14E ttCi* At T«'TIt 1 T;
15. GENERATOR'S/OFFEROR'S CERTIFICATION: I hereby declare that the contents of this consignment are fully and accurately described above by the proper shipping name, and are classified, packaged,
marked and labeled/placarded, and are in all respects in proper condition for transport according to applicable international and national govemmental regulations. If export shipment and I am the Primary
Exporter. I certify that the contents of this consignment conform to the terms of the attached EPA Acknowledgment of Consent.
I certify that the waste minimization statement identified in 40 CFR 262.27(a) (if I am a large quantity generator) or (b) (if I am a small quantity generator) is true.
Generator's/Offerors Printed/Typed Name Signature Month Day Year
._
F-
Z
16. International Shipments I�I
I Import to U.S. U Export from U.S. Port of entry/exit:
Transporter signature(for exports only): Date leaving U.S.:
TRANSPORTER
17. Transporter Acknowledgment of Receipt of Materials
Transporter 1 Printed/Typed Name Signature Month Day Year
i 77
m iri ...J L'4., i ' 't .A`itt_ .; t7 a1 I I`y'r I r' I ll [(�'
Transporter 2 Printed/Typed Name Signature Month Day Year
DESIGNATED FACILITY -
18. Discrepancy
18a. Discrepancy Indication Space ❑ QuantityType Residue
❑ U Partial Rejection ❑ Full Rejection
Manifest Reference Number:
18b. Alternate Facility (or Generator) U S. EPA ID Number
Facility's Phone:
18c Signature of Alternate Facility (or Generator)
Month Day Year
I
19. Hazardous Waste Report Management Method Codes (i.e., codes for hazardous waste treatment, dis osal, and recycling systems)
1.
2.
3.
4.
20. Designated Facility Owner or Operator: Certification of receipt of hazardous materials covered by the manifest except as noted in Item 18a
Pnnted/Typed Name Signature Month Day Year
I I I I
orm 8700-22 (Rev. 3-05) Previous editions are obsolete.
GENERATOR'S INITIAL COPY
ti G EPA porn to7Oftt22 Won 1., Cm i ottio,, PPi-,,,; ,..-mi.,,
,:',,, Pi,„`,PPCP -„,.15 ftsbare cremprettnit a is two Cater the number of conMiners for 13',;,i'. waste and Me appropriate abbreviation from Table I '
Dem designed '4,,ISC: OP a 12-a11eC Gilita. lemma or hi i ..t: is a te curtatetite ft:re:melt for Pie iffue of tecrittuitig,
Gat slanearc compute:- Di:intl.rs-sr Rot math; W,,,: P.P.r.; be USEPT: pf...,,S:`,,,:lovun and TABLE i --TYPES (;F CY,%1-NNERS
.2 C,'PCIP:I. re.,...?L..":-.K.'.)rH !-...:A.i'',.., @meets:tr. arid, trattsteacert ot nautardoics seattre aria coiners c-,,, 3A = Busico cloth caner oi plasm: bags EY! a Dtinip truck
itiptemott ft th hanattotit waste mentrffem sib:gage tind disposal ractities ro compete this form .:,r , r-iter a, hiast.c boxes curates, kracea OW r 'Wooden drums, barrels kegs
Slitt = Mutat bassos, cartons, :rases tiatotintitm a1G = Hopper or gondola cars,
pad-. tote, ai- d attiiitettate otaartooraffert c( i Giza-et:of is '...,1,..i P-A-04.S1
CYl u'WOCCAtili:,,Tkr,S, C,',-illor :::„ oases 743 = Tank cars.
TP a Portable tanks
OF a Fiberbastrot ta nisattitt Cnir15. bril-e, ti;, TT = Cargo tanks (lank trucks).
"l flai ilti ' ' ill 'Gil k 'fie' ''''.: illitftilit ti "li iti.th ' it ii i t flit ' '' hill ' i ' ' a '' l' i it it Nil = Metal chums Carrels, atento
I. Instructions for Generators
:ten Gk.:wet:Ott ah: EHeit (floritifivitGe Cowie,
Enter flett goiretaintri A ft too idenitticat.on tlurt21i. rut ittrate genterator
icoPP`C,ST.,,,r EPA
Item
thP, 'PC?,21 Sed Get Man test e to: itage 'EPP I-UP,1
akar- r friffrt a-:o) 22H,21
Einar a pi spa t droans fot iffettsh eme'derso response infoimatiori car: ist,tti ilea in Me evert
of art inatram diditic tot tarestaatior rim erdergeogy resecif chaffit rt trainer most
; • P 1; " • - st - tie
or anti armat lb iartiatitertiiiity Mr providing delaarte. dirortintifiph about Hie strip -sit
,S monitored 24 bears a Pay tat etil Sinus lite wasse is in transportation
ittiormitaft roma; titter:tort reirdert set-eget: shit
3 Reach sic mitte21 e. who itt chits, knowinagetable of ,ne tlatfardhus Bat ffte being 31119ffeff auvi
Mao erthrt)rettenSIVe emergency response and sca disantirffincidem mitigation information
es tie ettiprec of amtes 1 peffson who has that tertowiedge
ant info' oration aborit the 3!'jp,nent
Note: famergrarifty atestronse :-11.:10.212cr information sisoiffrt tarry be nett -tree ir Iterr 3 when
Mere Is mitt ortne 'e!" Mat aboffes to alt sistute acts:rials riettiff ibtab rit item ratt If a
situation y usertoridatert shiathiseso, gages to,t,eret, mons cce pritticelectoyi Res,t)ence
on :toff namnet i21iiPiPS IC; IP') irarbus amsles listed or the it vac ife3ttec glione 12121ber5
,-)51.30C,a1x1 with estutt ehohitin later tal shcatid too ortemc -titter its Cassiterictitat hart c,b
4 Oleo:fest T1,CiCkiPg
tim is mocha sr:intim) istiotiffe ntaist be cite -printed on tile manifest by the brans printer
rrem Sicriciatiffor tatiararto Arfffress Shrum faun -bye
Lifter the the 1' 1 adarcos to toiich tree :rerun sieci manifest signed
ttiu itte 'image:alert facility showier tar mailer!, and the f.iP..)eraDrs feieutichtt Note. the
triiertitoite neeto,or i11Gee ietoot shetiiti be the itiontro business nit:hot:et foi the
aistri.?Fa'..CJ:. ,.he actin:bar Wnere penetrator tor nist cothortzert titer. I be Gacried
hisiheut ilistitaftiorm ;ii toy carnet dettioirateid anoicr a:item-ate Of facility rejects some or
tap of the ship-it-tem also trots— die pitysisti tore trittdriess aura which the giant -nett ria err -milts
ditty it this ectrifferts difthreht than the mating actmess
ffern Tharktbroffer 1 SOTherty Name ante tics bitBa ate, khatti„,
Pam the corcurigg haute roost it 5 Ems, im combo; of aka first franspeffer 1,TU'Sr.01 the.
tveste Vehicle er ariier ; ,tr tie trierast taro
ra attrac:tree nate:tote mirror:my '1U,T13ei of roe saitcao rent snorter who
It dater tri off rep itateary iJati2 1Sisettfisa tittPits r
EPtEA. COPCF10.'," araii site ateffess of the faultily nesIgnated fe receive the eimsre. listed
rot trios ritiortoest ;Moo aritter mitt tamory prsorte anniffaritit ono 0e fittr Epp, twlo,
fr Irtematiatta to item rent forisist beet itherafficturt itarmaztardaust
cifiriesuonconati hoyfordittits putiterial ei item 9r.
AG: ittehti tht ite Hi; Pfoloct2121 111 Name leotard Mass ior Decision, identitioatton
rittortitio, initartittim aura rehocistole ittooffic fferetences. nortilicable,
NC:40, q, PCX,,,JeC1 for emits camtritictorts, enter mese adritiabital destretiptiOM
2", C.,;(1PtillUPit,-)1 Sheet (EPA borer iffitirt-22der. ititisc, if than
Eitewtrodtima ittocattatcy photos nomeist abutter to life famous wisrates cretdartistat satriffr hem um
flew 71 iota; Quartet:
Irl designt.Uet bakes, me total hitantity of wattle Round partial offs to the nearest
whole yinitand do Get eritet decimals re fractions 7is the extent practical, report quantities
tieing apotoptiafe units measure that will ailoYtt you to report quantities with precision.
littaste qUantittes entered shoat] Le Parted on actual measurements or reasonahty accurate
estiniatuo of actua nuartits 21 1, 1 Containe,eapacifies are not acceptable as estimates.
gam 12 Unita of Measure (Weight Voir:rhea
Enter in aesigeatiom boxes itte appropriate abbreviation front Table H (below) for the unit of
measure
FAB', 1 --UNITS OF MEASURE
= Gailoris triquids ohm) N GuLtic Meters
= Kmegrams 2- Pounds
= Liters taquics unlyt 7 5 Tons (2000 Pounds).
rtt 5 Metre: f met Mtheit0 aretyrartisi a Cubic, Yards
Note: TC(11, ^,10t,ic runs Giotto Meters, anti Currie Yards should ory be reported in
commotion 211» rarge bth k shipments such raii chars, tank trucks, or barges.
!tem ;3 iriVaska Scores
Enter up to ter -federal and slats Nttste codes to describe each waste stream identified in Rem
9b State twaste triodes :hat are nut redundant with federal codes must be entered here, in
addirioiitc the fenerai waste codes which are most reeresentative 21 the, pronedies of the
yfaste
/tap; 1.4 spchiar HandT,,!c; tr,structions apd Ad0:t21o,7aI 1,71cfrrhiPor7
Gehefelons may erre: any special handling or snipmert-specific information necessary for
me proper mattagemerr or napkin!) of 7ho materials .Jnder the generator's or other
handierbusiness processes retch as waste profile raumbers container codes, bar codes,
tyr response quake numbere Gerteraters also may use this space to enter additional
descriptive information itibeitt their hopped materin.s, such as cthemical names, constituent
percentages ph,ysica[ state, ttr specific gravity or wastes identified with volume units in
Perk 12
2 Ibis space may De 212,0-110 C,,::crd kriteti types of fecterally recurred Information for which
there is no spec:tic sparse protriced on the, manifest, inciadtrig any alternate facility
fesignations: it, .71111rtitst tracking number of the original manifest for rejected wastes and
residues that arff re -flapper, tinder a sertend manifest, and the specification of PCB waste
dose: QUOrIS aim POE jUt-o' spruce Sates required under oft; CFR 761,207. Generators,
ewhaver. cannot get re:alai-rad tit eitormatiiian tffs space to meet state reputatory
tecarrerrienta
fte17 15 Goneratonsattffiter s Gettificanicas
I, T tie generator caret road sky., „lob:date the waste minimization cernfication statement. In
Goring Rte .vVratile, mittimizatiort menificiation statement, blase. gerteraters who have not
been exempted by statute or reparation from the duty to make, a waste minimization
certificautm Linger SeetiOr; 300211.)) RCRA are aso itegifying that they have complied
with the wasie fT)irirnizat!or requirements The Generality s Certification als0 contains the
squired auesta [Gel tot Me shipment bus bitten aimenerik 721l:tared and is in proper
condition for transportation tot, snippees certificaticifft. The content oft the shipper's
certification statement l5 ,0,..MNS, 'I hereby deciare that toe contents of this
consigurnent are folly and aostattiely demos bed abase by the proper shipping nameand
ihlassitted rackaged markup arid iabeiedr pier:anted, and are all respects in proper
itiiiion fur tratisport accurst:re rc riDplicable international and national governmental
ie9k214212ns egetk shipment and I am the Primary Exporter. lcd,fy that the contents of
Mrs consigramer rt corium to tile burnt 5 of the attar:nee EPA Acim owledgment of Consent."
'Alien a Pact? critter Mart the dere`ator oftspares arse shipment for transpcdation, this party
mii`y also „sign the takeoff is certificate:oil stab:inert as the offeror of the shipment.
2 Generator rt Ortercit itersonnei may in -conk -it the ;tiaras 'On behalf of in the signature
block or may nano, writa ,:his statement 21 the signature blue!: prier la signing the
genera tonotretor certitroaliist to introit:re that T.Q .siFs .3S the employee or agent
hf the named piriC;pal
Note. Ail glihe above information e,;(;.el. r1.15%,:tte', ,eclu:red in !tem 15 may
bfe-pririteit
sipping describe:mat tor those 21tems,
0-0 CALIFORNIA -ff
Ni TIONeA.L CITY
INcoRponAT130
1726 WILSON AVENUE TENANT AND SITE IMPROVEMENTS
Specification No. 13-06
Contractor: EC Constructors, Inc.
CHANGE ORDER NO. 5
February 5, 2014
Reason/Purpose for this Change Order:
(1) Upon observation, it was determined that the plumbing system in the Office Building on site will need to be
replaced as described in Attachment "A." (2) There is an existing hand sink on the wash rack side of the East
wall of the Building. It appears that most of the water supply to this sink has been vandalized and is missing but
the waste line appears to be in tact. This change order will also include the work and cost for replacing the sink
and the plumbing.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the subcontractor shall:
(1) remove and replace pressure vessel in existing water closet, urinal fllusometer, and kitchen faucet;
provide/install 2 new toilet seats and 2 new water flexes, remove existing urinal and check waste spud for leaks,
intall airgap and hook up waste and water to existing dishwasher, test fixtures and check for leaks.
(2) remove and demo existing janitor sink; provide and install material for new waste pipe and re -connect to
existing vent pipe; provide/install material for new hot and cold water pipes from main and from water heater;
provide/install new janitor sink, p-trap, and faucet; test copper pipes and fittings for the lump sum price of
$4,543,62.
Original Contract Amount...... $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
831,515.00
12,029.56
843, 544.56
4,543.62
New contract amount $
Worki da s ided: 0 W rking days subtracted: 0 Percent change in Contract to date 1.99%
..10 L(.
Date
%.////l `t.
848,088.18
Date (City Manager, rered for Change Odes >$24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by EC Constructors, Inc.:
Name:
Note to Contractor: If do not agree with'Th1 Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
40-* CALIFORNIA +-K+
NATIONAL, airy
INCORPORATED
1726 WILSON AVENUE IMPROVEMENTS
Specification #13-06
DATE: February 5, 2014
WORK PERFORMED BY: EC Constructors, Inc.
DESCRIPTION OF WORK: Refurbishing plumbing fixtures in the Office Building and replace
existing hand sink with new fixture
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LUMP
Unit
Qty
Rate
Total
1)
2)
Refurbish plumbing fixtures in
the existing office building
Replace existing hand sink with
new fixture
Total
Total
1.00
1.00
1,420.20
2,907.06
1,420.20
2,907.06
Sub -Total Materials:
Prime Markup for Sub (5%):
TOTAL MATERIALS:
$ 4,327.26
$ 216.36
$ 4,543_62
GRAND TOTAL:
$4,543.62
CHANGE ORDER# 5
ATTACHMENT "A"
E
0
A
0011T TR117C1`OR T V'
zsc=saaraeaEI 150151677
Request for Information 007
i
Detailed, RFIs Grouped by RFI Number
214-1726 Wilson Ave Tenant & Site Improvements Project # 214
1726 Wilson Avenue Tel: (619) 440-7181 Fax: (619) 440-7180
National City, CA 91950
RFI #: 007
Date Created: 1/10/2014
Answer Company Answered By Author Company Authored By
EC Constructors Inc.
9834 River Street
Lakeside, CA 92040
Bill Marcotte
Co -Respondent Author RFI Number
7
Subject
Discipline Category
Existing Hand Sink in the Outdoor Work Area Plumbing Field Condition
Cc: Company Name
Contact Name Copies Notes
Question Date Required: 1/1712014
There is an Existing Hand Sink on the Wash Rack side of the East wall of the Building. 11 apperas the most of the water
supply to this sink has been vandalized and is missing but the waste line appears to be In tack.. This sink is not indicated
on the plumbing drawings so we can't determine if it will be required for the new use of this space.
Please advise if we should remove this sink, run new water supply to it or leave it as it currently exists.
Suggestion
Answer
Date Answered:
January 13, 2014
Please provide a cost to repair/replace the sink so that it is compliant and functional.
PrologManager Printed on: 1/10/2014 ECG
Page 1
•
)k?L l.J,
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
EC CONSTRUCTORS
Change Orders #1, #2, #3 and #5
1726 Wilson Avenue Tenant — Site Improvements
Judy Hernandez (Engineering) Forwarded Copy
of Change Orders to EC Constructors